Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000483/LER-2008-005, Regarding Reactor Manually Tripped Due to B Main Feed Pump Tripping on Low Lube Oil Pressure + (Regarding Reactor Manually Tripped Due to B Main Feed Pump Tripping on Low Lube Oil Pressure)
- 05000414/LER-2010-001, Regarding Reactor Mode Change with Limiting Condition for Operation 3.6.6 Not Met in Violation of Limiting Condition for Operation 3.0.4 + (Regarding Reactor Mode Change with Limiting Condition for Operation 3.6.6 Not Met in Violation of Limiting Condition for Operation 3.0.4)
- 05000353/LER-1917-007, Regarding Reactor Mode Switch Change During RCIC Testing + (Regarding Reactor Mode Switch Change During RCIC Testing)
- 05000278/LER-1917-001, Regarding Reactor Pressure Boundary Leakage Due to Weld Failure in One-Inch Diameter Instrument Line + (Regarding Reactor Pressure Boundary Leakage Due to Weld Failure in One-Inch Diameter Instrument Line)
- 05000373/LER-2013-004, Regarding Reactor Pressure Exceeded 150 Psig with Reactor Core Isolation Cooling Inoperable + (Regarding Reactor Pressure Exceeded 150 Psig with Reactor Core Isolation Cooling Inoperable)
- NL-11-0771, Regarding Reactor Pressure Vessel 2N2G Recirculation Inlet Nozzle-To-Safe End Weld Full Structural Weld Overlay, Nondestructive Examination Results -Spring 2011 Outage (2R21) + (Regarding Reactor Pressure Vessel 2N2G Recirculation Inlet Nozzle-To-Safe End Weld Full Structural Weld Overlay, Nondestructive Examination Results -Spring 2011 Outage (2R21))
- 05000455/LER-2014-004, Regarding Reactor Pressure Vessel Head Control Rod Drive Mechanism Penetration Nozzle Weld Indication Attributed to Primary Water Stress Corrosion Cracking + (Regarding Reactor Pressure Vessel Head Control Rod Drive Mechanism Penetration Nozzle Weld Indication Attributed to Primary Water Stress Corrosion Cracking)
- 05000456/LER-2012-002, Regarding Reactor Pressure Vessel Head Control Rod Drive Mechanism Penetration Nozzle Weld Indication Attributed to Primary Water Stress Corrosion Cracking + (Regarding Reactor Pressure Vessel Head Control Rod Drive Mechanism Penetration Nozzle Weld Indication Attributed to Primary Water Stress Corrosion Cracking)
- 05000287/LER-2001-001-01, Regarding Reactor Pressure Vessel Head Leakage Due to Stress Corrosion Cracks Found in Nine Control Rod Drive Nozzle Penetrations + (Regarding Reactor Pressure Vessel Head Leakage Due to Stress Corrosion Cracks Found in Nine Control Rod Drive Nozzle Penetrations)
- 05000400/LER-2013-003, Regarding Reactor Pressure Vessel Head Penetration Nozzle 37 Indication Attributed to Primary Water Stress Corrosion Cracking + (Regarding Reactor Pressure Vessel Head Penetration Nozzle 37 Indication Attributed to Primary Water Stress Corrosion Cracking)
- 05000400/LER-2013-001, Regarding Reactor Pressure Vessel Head Penetration Nozzle Indications Attributed to Primary Water Stress Corrosion Cracking + (Regarding Reactor Pressure Vessel Head Penetration Nozzle Indications Attributed to Primary Water Stress Corrosion Cracking)
- 05000397/LER-2015-005, Regarding Reactor Pressure Vessel Level Indication Switch Failures + (Regarding Reactor Pressure Vessel Level Indication Switch Failures)
- 05000416/LER-2013-005, Regarding Reactor Pressure Vessel Pressure Less than 0 Psig During Six Plant Startups Resulting in a Violation of Technical Specification 3.4.11, RCS Pressure and Temperature (Pff) Limits + (Regarding Reactor Pressure Vessel Pressure Less than 0 Psig During Six Plant Startups Resulting in a Violation of Technical Specification 3.4.11, RCS Pressure and Temperature (Pff) Limits)
- 05000333/LER-2008-002, Regarding Reactor Pressure Vessel Recirculation Inlet Nozzle Axial Flaw Indication Discovered During Refueling Outage Consistent with Inter-Granular Stress Corrosion Cracking + (Regarding Reactor Pressure Vessel Recirculation Inlet Nozzle Axial Flaw Indication Discovered During Refueling Outage Consistent with Inter-Granular Stress Corrosion Cracking)
- 05000374/LER-2004-001, Regarding Reactor Protection Bus B Trip and Inoperable Automatic Depressurization Valves Due to Equipment Failure + (Regarding Reactor Protection Bus B Trip and Inoperable Automatic Depressurization Valves Due to Equipment Failure)
- 05000219/LER-2013-005, Regarding Reactor Protection System (RPS) Actuation with the Reactor in Hot Shutdown + (Regarding Reactor Protection System (RPS) Actuation with the Reactor in Hot Shutdown)
- 05000255/LER-1917-002, Regarding Reactor Protection System Actuation While the Reactor Was Shutdown + (Regarding Reactor Protection System Actuation While the Reactor Was Shutdown)
- 05000354/LER-2016-005, Regarding Reactor Protection System Actuation While the Reactor Was Shutdown + (Regarding Reactor Protection System Actuation While the Reactor Was Shutdown)
- 05000416/LER-2013-001, Regarding Reactor Protection System Actuation Due to a Main Turbine Generator Trip + (Regarding Reactor Protection System Actuation Due to a Main Turbine Generator Trip)
- 05000416/LER-2012-008, Regarding Reactor Protection System Actuation Due to a Main Turbine Generator Trip + (Regarding Reactor Protection System Actuation Due to a Main Turbine Generator Trip)
- 05000287/LER-1917-001, Regarding Reactor Protection System Actuation - Reactor Trip Due to Turbine Trip from Generator Lockout + (Regarding Reactor Protection System Actuation - Reactor Trip Due to Turbine Trip from Generator Lockout)
- 05000416/LER-2013-002, Regarding Reactor Protection System Actuation Due to a Turbine Trip + (Regarding Reactor Protection System Actuation Due to a Turbine Trip)
- 05000259/LER-2012-003, Regarding Reactor Protection System Circuit Could Potentially Remain Energized During an Appendix R Fire + (Regarding Reactor Protection System Circuit Could Potentially Remain Energized During an Appendix R Fire)
- 05000387/LER-2013-009-01, Regarding Reactor Protection System Electrical Protection Assembly Logic Card Underfrequency Trip Setpoints Out of Calibration + (Regarding Reactor Protection System Electrical Protection Assembly Logic Card Underfrequency Trip Setpoints Out of Calibration)
- 05000387/LER-2013-009, Regarding Reactor Protection System Electrical Protection Assembly Logic Card Underfrequency Trip Setpoints Out of Calibration + (Regarding Reactor Protection System Electrical Protection Assembly Logic Card Underfrequency Trip Setpoints Out of Calibration)
- 05000237/LER-2009-007, Regarding Reactor Protection System Nonconformance to a Design Standard + (Regarding Reactor Protection System Nonconformance to a Design Standard)
- 05000416/LER-2013-003, Regarding Reactor Protection System and Reactor Core Isolation Cooling Actuation Due to a High Reactor Pressure Transient + (Regarding Reactor Protection System and Reactor Core Isolation Cooling Actuation Due to a High Reactor Pressure Transient)
- 05000255/LER-2011-008, Regarding Reactor Protection System and Auxiliary Feedwater System Actuation + (Regarding Reactor Protection System and Auxiliary Feedwater System Actuation)
- 05000255/LER-2008-001, Regarding Reactor Protection System and Auxiliary Feedwater System Actuation + (Regarding Reactor Protection System and Auxiliary Feedwater System Actuation)
- 05000255/LER-2005-005, Regarding Reactor Protection System and Auxiliary Feedwater System Actuation + (Regarding Reactor Protection System and Auxiliary Feedwater System Actuation)
- 05000255/LER-2005-001, Regarding Reactor Protection System and Auxiliary Feedwater System Actuation + (Regarding Reactor Protection System and Auxiliary Feedwater System Actuation)
- 05000255/LER-2004-001, Regarding Reactor Protection System and Auxiliary Feedwater System Actuation + (Regarding Reactor Protection System and Auxiliary Feedwater System Actuation)
- 05000250/LER-2013-006, Regarding Reactor Protection and Auxiliary Feed Water System Actuations Due to Trip of Operating Feed Water Pumps + (Regarding Reactor Protection and Auxiliary Feed Water System Actuations Due to Trip of Operating Feed Water Pumps)
- 05000261/LER-2015-001, Regarding Reactor Protection and DC Electrical System Inoperability Due to Inadvertant Parallel Connection of Safety Trains + (Regarding Reactor Protection and DC Electrical System Inoperability Due to Inadvertant Parallel Connection of Safety Trains)
- 05000269/LER-2011-005, Regarding Reactor Protective System Overpower Flux/Flow Imbalance Channels Inoperable + (Regarding Reactor Protective System Overpower Flux/Flow Imbalance Channels Inoperable)
- 05000374/LER-2015-003, Regarding Reactor Recirculation Loop Discharge Isolation Valve Vent Line Leak Due to Weld Defect + (Regarding Reactor Recirculation Loop Discharge Isolation Valve Vent Line Leak Due to Weld Defect)
- 05000440/LER-2007-007, Regarding Reactor Recirculation Pump Failure Results in Manual Reactor Protection System Actuation + (Regarding Reactor Recirculation Pump Failure Results in Manual Reactor Protection System Actuation)
- 05000333/LER-2012-007, Regarding Reactor Scram Caused by Main Turbine Emergency Trip Lockout Valve Failure + (Regarding Reactor Scram Caused by Main Turbine Emergency Trip Lockout Valve Failure)
- 05000331/LER-2007-007, Regarding Reactor Scram Due to 1A2 Non-essential Bus Lockout + (Regarding Reactor Scram Due to 1A2 Non-essential Bus Lockout)
- 05000458/LER-2014-002, Regarding Reactor Scram Due to Average Power Range Monitor High-flux Signal Following a Malfunction of the Main Turbine Electro Hydraulic System + (Regarding Reactor Scram Due to Average Power Range Monitor High-flux Signal Following a Malfunction of the Main Turbine Electro Hydraulic System)
- 05000260/LER-2010-003, Regarding Reactor Scram Due to Closure of the Main Steam Isolation Valves and Subsequent Invalid RPS Scram from the Intermediate Range Monitoring System + (Regarding Reactor Scram Due to Closure of the Main Steam Isolation Valves and Subsequent Invalid RPS Scram from the Intermediate Range Monitoring System)
- 05000416/LER-2007-003, Regarding Reactor Scram Due to Decreasing Reactor Vessel Water Level + (Regarding Reactor Scram Due to Decreasing Reactor Vessel Water Level)
- 05000219/LER-2014-006-01, Regarding Reactor Scram Due to Decreasing Reactor Water Level + (Regarding Reactor Scram Due to Decreasing Reactor Water Level)
- 05000354/LER-2013-002, Regarding Reactor Scram Due to Degrading Condenser Vacuum + (Regarding Reactor Scram Due to Degrading Condenser Vacuum)
- 05000341/LER-2012-003, Regarding Reactor Scram Due to Degrading Condenser Vacuum + (Regarding Reactor Scram Due to Degrading Condenser Vacuum)
- 05000219/LER-2015-002, Regarding Reactor Scram Due to Digital Protective Relay System Lockout + (Regarding Reactor Scram Due to Digital Protective Relay System Lockout)
- 05000219/LER-2015-001, Regarding Reactor Scram Due to EPR Failure During MPR Troubleshooting + (Regarding Reactor Scram Due to EPR Failure During MPR Troubleshooting)
- 05000410/LER-2003-002, Regarding Reactor Scram Due to Electric Grid Disturbance + (Regarding Reactor Scram Due to Electric Grid Disturbance)
- 05000220/LER-2003-002, Regarding Reactor Scram Due to Electric Grid Disturbance + (Regarding Reactor Scram Due to Electric Grid Disturbance)
- 05000397/LER-2008-001, Regarding Reactor Scram Due to Failed Compression Fitting + (Regarding Reactor Scram Due to Failed Compression Fitting)
- 05000263/LER-2015-006, Regarding Reactor Scram Due to Group 1 Isolation from Foreign Material in the Main Steam Flow Instrument Line + (Regarding Reactor Scram Due to Group 1 Isolation from Foreign Material in the Main Steam Flow Instrument Line)