Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BYRON 2014-0003, Pressure and Temperature Limits Report (PTLR) for Measurement Uncertainty Recapture (MUR) Power Uprate + (Pressure and Temperature Limits Report (PTLR) for Measurement Uncertainty Recapture (MUR) Power Uprate)
- BYRON 2014-0040, Pressure and Temperature Limits Report (PTLR) Revised for Negative Pressure Application During Reactor Coolant System Vacuum Fill + (Pressure and Temperature Limits Report (PTLR) Revised for Negative Pressure Application During Reactor Coolant System Vacuum Fill)
- ML15253A311 + (Pressure and Temperature Limits Report (PTLR) for 32 and 54 Effective Full-Power Years (EFPY))
- ML13311A054 + (Pressure and Temperature Limits Report (PTLR) PTLR-2, Revision 0 (Draft B))
- ML15323A005 + (Pressure and Temperature Limits Report (PTLR))
- LR-N25-0073, Pressure and Temperature Limits Report (PTLR) Revision 2 + (Pressure and Temperature Limits Report (PTLR) Revision 2)
- L-PI-15-034, Pressure and Temperature Limits Report (PTLR) Revision 4 + (Pressure and Temperature Limits Report (PTLR) Revision 4)
- DCL-05-016, Pressure and Temperature Limits Report (PTLR-1), Revision 4 + (Pressure and Temperature Limits Report (PTLR-1), Revision 4)
- DCL-05-047, Pressure and Temperature Limits Report (PTLR-1), Revision 5 + (Pressure and Temperature Limits Report (PTLR-1), Revision 5)
- CP-202000285, Pressure and Temperature Limits Report (Ptlr), ERX-07-003, Revision 5 + (Pressure and Temperature Limits Report (Ptlr), ERX-07-003, Revision 5)
- ML22300A084 + (Pressure and Temperature Limits Report (Ptlr), Revision 8)
- BW220062, Pressure and Temperature Limits Report (Ptlr), Revision 9 + (Pressure and Temperature Limits Report (Ptlr), Revision 9)
- DCL-05-001, Pressure and Temperature Limits Report (Ptlr). Revision 3 + (Pressure and Temperature Limits Report (Ptlr). Revision 3)
- ML13150A010 + (Pressure and Temperature Limits Report Revision)
- ML100700088 + (Pressure and Temperature Limits Report Revision)
- L-13-360, Pressure and Temperature Limits Report Revision + (Pressure and Temperature Limits Report Revision)
- L-12-077, Pressure and Temperature Limits Report Revision + (Pressure and Temperature Limits Report Revision)
- L-22-154, Pressure and Temperature Limits Report Revision + (Pressure and Temperature Limits Report Revision)
- NL-14-0639, Pressure and Temperature Limits Report and Unit 2 Revision 5 Pressure and Temperature Limits Report + (Pressure and Temperature Limits Report and Unit 2 Revision 5 Pressure and Temperature Limits Report)
- ML15237A382 + (Pressure and Temperature Limits Report for Measurement Uncertainty Recapture Power Uprate)
- ML15237A338 + (Pressure and Temperature Limits Report for Measurement Uncertainty Recapture Power Uprate)
- RA-19-0338, Pressure and Temperature Limits Report for Unit Nos. 1 and 2 + (Pressure and Temperature Limits Report for Unit Nos. 1 and 2)
- ML17018A152 + (Pressure and Temperature Limits Report, Revision 1)
- LR-N18-0057, Pressure and Temperature Limits Report, Revision 1 + (Pressure and Temperature Limits Report, Revision 1)
- ET 09-0010, Pressure and Temperature Limits Report, Revision 1 + (Pressure and Temperature Limits Report, Revision 1)
- DCL-09-075, Pressure and Temperature Limits Report, Revision 10 + (Pressure and Temperature Limits Report, Revision 10)
- ML15062A275 + (Pressure and Temperature Limits Report, Revision 2)
- L-08-126, Pressure and Temperature Limits Report, Revision 2-1 + (Pressure and Temperature Limits Report, Revision 2-1)
- L-08-327, Pressure and Temperature Limits Report, Revision 3 + (Pressure and Temperature Limits Report, Revision 3)
- L-PI-16-054, Pressure and Temperature Limits Report, Revision 5 + (Pressure and Temperature Limits Report, Revision 5)
- ULNRC-06145, Pressure and Temperature Limits Report, Revision 6 + (Pressure and Temperature Limits Report, Revision 6)
- DCL-07-061, Pressure and Temperature Limits Report, Revision 7 + (Pressure and Temperature Limits Report, Revision 7)
- BW210065, Pressure and Temperature Limits Report, Revision 8 + (Pressure and Temperature Limits Report, Revision 8)
- EPID:L-2021-LLA-0226 + (Pressure and Temperature Limits Report, Revision 8)
- JAFP-17-0103, Pressure and Temperature Limits Report, Rev. 1 (40 Effective Full-Power Years) + (Pressure and Temperature Limits Report, Rev. 1 (40 Effective Full-Power Years))
- ULNRC-05219, Pressure and Temperature Limits Report, Revision 4, Incorporating Changes Associated with the Replacement Steam Generator Program + (Pressure and Temperature Limits Report, Revision 4, Incorporating Changes Associated with the Replacement Steam Generator Program)
- DCL-07-103, Pressure and Temperature Limits Report, Revision 8, Effective October 25, 2007 + (Pressure and Temperature Limits Report, Revision 8, Effective October 25, 2007)
- L-14-289, Pressure and Temperature Limits Report. Revision 2 + (Pressure and Temperature Limits Report. Revision 2)
- DCL-05-093, Pressure and Temperature Limits Report. Revision 6 + (Pressure and Temperature Limits Report. Revision 6)
- BW140001, Pressure and Temperature Limits Reports (Ptlrs) + (Pressure and Temperature Limits Reports (Ptlrs))
- BW050010, Pressure and Temperature Limits Reports (Ptlrs), Revision 3 + (Pressure and Temperature Limits Reports (Ptlrs), Revision 3)
- BW070019, Pressure and Temperature Limits Reports (Ptlrs), Revision 4 + (Pressure and Temperature Limits Reports (Ptlrs), Revision 4)
- BW140044, Pressure and Temperature Limits Reports (Ptlrs), Revision 7 and Braidwood Unit 2 - Pressure and Temperature Limits Reports (Ptlrs), Revision + (Pressure and Temperature Limits Reports (Ptlrs), Revision 7 and Braidwood Unit 2 - Pressure and Temperature Limits Reports (Ptlrs), Revision)
- L-14-141, Pressure and Temperature Limits Reports and Unit No. 2 Cycle 18 Core Operating Limits Report + (Pressure and Temperature Limits Reports and Unit No. 2 Cycle 18 Core Operating Limits Report)
- L-05-063, Pressure and Temperature Limits Reports, Revision 1 + (Pressure and Temperature Limits Reports, Revision 1)
- L-17-277, Pressure and Temperature Limits Reports, Revisions 8 and 9 + (Pressure and Temperature Limits Reports, Revisions 8 and 9)
- Regulatory Guide 5.80 + (Pressure-Sensitive and Tamper-Indicating Device Seals for Material Control and Accounting of Special Nuclear Material)
- L-92-095, Pressure-Temp Curves & LTOP Setpoint Curve for Max Reactor Vessel Fluence of 2.192 X 10^19 Neutrons/cm^2 + (Pressure-Temp Curves & LTOP Setpoint Curve for Max Reactor Vessel Fluence of 2.192 X 10^19 Neutrons/cm^2)
- ML20117E733 + (Pressure-Temp Curves Per RG 1.99,Rev 2 for Oncpp)
- ML17223A515 + (Pressure-Temp Limits & Low Temp Overpressure Protection for St Lucie Unit 2 for 15 Efpy)
- ML20135E814 + (Pressure-Temp Limits for 32 Efpy)