Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202H639 + (Preliminary Case Study Rept:Operational Experience Involving Losses of Electrical Inverters)
- ML20014E621 + (Preliminary Certificate of Compliance No. 1032 Amendment 5 Safety Evaluation Report)
- ML23017A120 + (Preliminary Chapters of Hermes CP SE)
- ML19220C635 + (Preliminary Chronology of 790328 TMI Incident)
- ML19220C970 + (Preliminary Chronology of TMI Incident on 790328 & Subsequent Status Through 790407)
- ML20308A495 + (Preliminary CoC 1004 Amendment No. 17 Safety Evaluation Report)
- ML20295A422 + (Preliminary CoC 1014 Amendment No. 15 Safety Evaluation Report)
- ML20107C353 + (Preliminary Coating Exemption Log)
- ML20012F621 + (Preliminary Comment on Proposed Rule 10CFR35, Basic QA Program,Records & Repts of Misadministrations or Events Re Medical Use of Byproduct Matl. Extension of Comment Period Requested in Order to Give Careful Consideration to Issues)
- ML19274E389 + (Preliminary Comments Re PG&E Commitments,W/Suggested Amends. Certificate of Svc Encl)
- ML20027D229 + (Preliminary Comments on EPA Draft Std on High Level Waste Isolation, Internal Rept)
- ML20217K033 + (Preliminary Comments on EPRI Rept TR-106387)
- ML20073K423 + (Preliminary Comments on NRC Review of Gpu Vs B&W Trial Court Record & Request for Addl Time.Discussion on HPI Initiation Is at Best Confusing & at Worst Misleading.Addl 6 Wks Needed to Provide Comments.Certificate of Svc Encl)
- ML20154R680 + (Preliminary Comments on Proposed Rule 10CFR52 Re Early Site Permits & Std Design Certifications.No Legitimate Natl Interest in Forcing Upon People Reactor at Site Which Cannot Be Safely Evacuated.Comment Period Should Be Extended)
- ML19297D366 + (Preliminary Comments to NRC Concerning Best Practices for the Establishment and Operation of Local Community Advisory Boards for Decommissioning Nuclear Power Plants (Including 22 Suggested Best Practices))
- ML20197D270 + (Preliminary Comparative Analysis of Disposal Site Alternatives Report for Umtra Project Spook Site Converse County Wy. W/870424 Forwarding Ltr)
- ML19221A342 + (Preliminary Conclusions on Incore Thermocouple Noise Analysis)
- ML20127B441 + (Preliminary Configuration Mgt Handbook, Review Draft)
- ML20206A023 + (Preliminary Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept)
- ML20235M359 + (Preliminary Conformance to Reg Guide 1.97:Byron Units 1 & 2 & Braidwood Units 1 & 2, Technical Evaluation Rept)
- ML19321A552 + (Preliminary Contentions Alleging Possibility of Steam Generator Tube Rupture During Severe Loca.Contends That Continued Operation W/Significant Tube Degradation Poses Threat to Public.Certificate of Svc Encl)
- ML20126H724 + (Preliminary Control Room Assessment)
- ML20079G028 + (Preliminary Control Room Design Assessment for WPPSS Nuclear Projects 1 & 4,Final Rept)
- ML17276B013 + (Preliminary Control Room Human Engineering Design Rept. Four Oversize Drawings Encl.Aperture Cards Are Available in PDR)
- ML19211A099 + (Preliminary Craft2 Model of Loft L3-1 Experiment - Presented to P Norian & J Guttman)
- ML20235S151 + (Preliminary Critical Path Projection for RF07)
- ML19323D589 + (Preliminary Data Analysis Rept,Vol 1 (Sections 1-5))
- ML19305E676 + (Preliminary Data Analysis Rept,Vol II)
- ML24256A140 + (Preliminary Data Needs and Agenda to Support the Supplemental Environmental Audit for Point Beach, Units 1 and 2 - File Copy)
- ML19323A938 + (Preliminary Data Rept for Air & Water Sampling Collected on 800417-26)
- ML19309E682 + (Preliminary Data Rept of Air & Water Sampling)
- ML19323B535 + (Preliminary Data Rept of Water Sampling from 800428-0507 at Lancaster,Pa & Facility)
- ML042590226 + (Preliminary Decommission Cost Estimate Per 10 CFR 50.75(f)(2))
- ML22300A221 + (Preliminary Decommissioning Cost Estimate and Fuel Management Plan)
- ML093080744 + (Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan)
- ML20246F242 + (Preliminary Decommissioning Plan for Fort St Vrain Nuclear Generating Station)
- ML20128B949 + (Preliminary Decommissioning Plan for San Onofre Nuclear Generating Station Unit 1)
- ML19326C902 + (Preliminary Deficiency Rept Re Hydraulic Performance of Sodium Thiosulfate Reactor Bldg Spray Sys.Caused by Sensitivity as-built Piping Configuration.Licensees Must Reaffirm Conformance W/Fsar)
- ML20086D100 + (Preliminary Deficiency Rept Re NSSS Primary Loop Pipe Welding.Discrepant Conditions Discovered on 730920.Welding Halted Until Faulty Conditions Corrected.Wismer & Becker & Westinghouse Conducting Investigations)
- ML19319E526 + (Preliminary Deficiency Rept Re Sodium Thiosulfate Spray Sys. Spray Sys Tank Draw Down Not Uniform as Stated in Fsar.Utils Notified of Hydraulic Sys Sensitivity & Performance within FSAR Criteria Recommended.Deviation Effects Not Adverse)
- ML19256A522 + (Preliminary Design Approval Amend 1 in Accordance w/10CFR50 App O,Paragraph 3,for Nuclear Steam Supply Sys Portion of Pressurized Water Nuclear Power Plant)
- ML19256A507 + (Preliminary Design Approval Amend 2,effective 781222-801222. Provides Design Info for Nuclear Island Portion of BWR-6/ Mark 3 BWR Nuclear Power Plant)
- ML20234E012 + (Preliminary Design Approval PDA-1 for GESSAR-238 Nuclear Island Design)
- ML20039H197 + (Preliminary Design Approval PDA-12 for B&W BSAR-205 Std Nuclear Steam Supply Sys)
- ML20153A923 + (Preliminary Design Approval PDA-13 for Westinghose Elec RESAR-414 Nuc Steam Supply Sys Standard Design)
- ML19289C338 + (Preliminary Design Approval of Design Submitted in RESAR-41 (Nuclear Steam Supply Sys Standard Design))
- ML20074B073 + (Preliminary Design Assessment of Byron/Braidwood Generating Station Control Room Human Factors Engineering Review, Suppls I & II)
- ML19275B671 + (Preliminary Design Study of Large Scale Graphite Oxidation Loop)
- ML19341A328 + (Preliminary Determination of Power Shapes,Doppler Coefficients & Sodium Void Worths for Cds Phase-II Oxide Core, Informal Rept)
- ML20197C699 + (Preliminary Deterministic Failure Consequence Analysis for Non-Nuclear Instrumentation (Nni) & Integrated Control Sys (ICS) Power Supply Failure)
- ML20211G943 + (Preliminary Development of an Integrated Approach to the Evaluation of Pressurized Thermal Shock as Applied to the Oconee Unit 1 Nuclear Power Plant)