Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19212A741 + (Pre-application Public Teleconference with NextEra Energy Point Beach, LLC (NextEra) to Discuss a Relief Request for Point Beach Nuclear Plant, Unit 2)
- PMNS20201022, Pre-application Review Meeting with Louisiana Energy Services D.B.A. Urenco USA (Uusa) + (Pre-application Review Meeting with Louisiana Energy Services D.B.A. Urenco USA (Uusa))
- ML030290387 + (Pre-application Site Visit to North Anna Nuclear Station to Observe Early Site Permit (ESP) Pre-application Subsurface Investigation Activities (Project No. 719))
- ML18304A271 + (Pre-application Teleconference with NextEra Energy Point Beach to Discuss High Winds Probabilistic Risk Assessment (PRA) License Amendment)
- ML19309E969 + (Pre-application Teleconference with NextEra Energy Point Beach, LLC (NextEra) to Discuss License Amendment Request (LAR) to Address Tornado Missile Protection (TMP) at Point Beach Nuclear Plant (Pbnp), Units 1 and 2)
- PMNS20241128, Pre-application Westinghouse AP300 White Paper EPZ Definition + (Pre-application Westinghouse AP300 White Paper EPZ Definition)
- 05000369/FIN-2008003-03 + (Pre-conditoning of Unit 2 MSIVs Prior to Surveillance Testing)
- ML22276A149 + (Pre-decisional DG Seismic Design Ver 7)
- ML22276A154 + (Pre-decisional DG Seismic Isolation Ver 7)
- ML25339A142 + (Pre-decisional Enforcement Conference (Pec) Public Meeting on September 3, 2025 Official Transcript)
- ML20236P106 + (Pre-decisional Enforcement Conference Repts 50-317/98-05 & 50-318/98-05.Major Areas Discussed:Radiological Controls Deficiencies Experienced During Replacement of Nuclear Instrumentation Detectors in Unit 1 Annulus on 980409)
- ML19087A097 + (Pre-decisional Enforcement Conference Summary Holtec International)
- NL-20-0037, Pre-decisional Reply to EA-19-112, NRC Inspection Report 05000424/2019090 and 05000425/2019090 and Preliminary White Finding and Apparent Violation + (Pre-decisional Reply to EA-19-112, NRC Inspection Report 05000424/2019090 and 05000425/2019090 and Preliminary White Finding and Apparent Violation)
- ML072120490 + (Pre-filed Direct Testimony of Dr. Rudolf H. Hausler)
- ML12181A365 + (Pre-filed Written Rebuttal Testimony of Stephen C. Sheppard Regarding Contention NYS-17B)
- ML17353A762 + (Pre-fire Plan Guidelines & Safe Shutdown Manual Actions)
- PMNS20180153, Pre-licensing Meeting with Southern Nuclear Operating Company, Inc., (SNC) to Discuss the Joseph M. Farley Nuclear Plant, Units 1 and 2, Risk-Informed Completion Times Amendment + (Pre-licensing Meeting with Southern Nuclear Operating Company, Inc., (SNC) to Discuss the Joseph M. Farley Nuclear Plant, Units 1 and 2, Risk-Informed Completion Times Amendment)
- PMNS20171208, Pre-licensing Meeting with Southern Nuclear Operating Company, Inc., (SNC) to Discuss the Joseph M. Farley Nuclear Plant, Units 1 and 2, Risk-Informed Completion Times Amendment + (Pre-licensing Meeting with Southern Nuclear Operating Company, Inc., (SNC) to Discuss the Joseph M. Farley Nuclear Plant, Units 1 and 2, Risk-Informed Completion Times Amendment)
- ML19252A334 + (Pre-licensing Teleconference with Dominion Energy to Discuss Its Proposed License Amendments to Adopt a Risk-informed 10 CFR 50.69 Categorization Program for the Surry Power Station, Units 1 and 2)
- ML19240B712 + (Pre-licensing Teleconference with Dominion Energy to Discuss Its Proposed License Amendments to Adapt a Risk-informed 10 CFR 50.69 Categorization Program for the Surry Power Station, Units 1 and 2)
- PMNS20240996, Pre-planning Meeting to Discuss the Various Future License Amendment Requests for the Salem Power Uprate + (Pre-planning Meeting to Discuss the Various Future License Amendment Requests for the Salem Power Uprate)
- PMNS20231157, Pre-planning Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Integrated Technical Specification Conversion, 24-Month Fuel Cycle and Revise Safety Release Valve Setpoint to 1130 Psig + (Pre-planning Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Integrated Technical Specification Conversion, 24-Month Fuel Cycle and Revise Safety Release Valve Setpoint to 1130 Psig)
- EPID:L-2023-LRM-0080 + (Pre-planning Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Integrated Technical Specification Conversion, 24-Month Fuel Cycle and Revise Safety Release Valve Setpoint to 1130 Psig)
- ML20148A461 + (Pre-publication Copy of Solidification of High-Level Radioactive Wastes. Study of Scientific & Tech Problems W/ Conversion of Liquid & Semiliquid high-level Radioactive Wastes Into Stable Form Suitable for Transp)
- ML24283A027 + (Pre-publication Draft to Proposed Rule: Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors)
- ML101730121 + (Pre-release Inspection Results)
- PMNS20250690, Pre-submittal Closed Hybrid Meeting Between U. S. Nuclear Regulatory Commission and Westinghouse Electric Company for Topical Report WCAP-19042 + (Pre-submittal Closed Hybrid Meeting Between U. S. Nuclear Regulatory Commission and Westinghouse Electric Company for Topical Report WCAP-19042)
- ML11140A099 + (Pre-submittal Consideration of Steam Generator Alternative Repair Criteria Requirements - Request for Additional Information)
- PMNS20190398, Pre-submittal Discussion of Proposed License Amendment Request to Replace Buried Electrical Cable + (Pre-submittal Discussion of Proposed License Amendment Request to Replace Buried Electrical Cable)
- PMNS20230444, Pre-submittal Discussion of X-energy Topical Report, Atmospheric Dispersion and Dose Consequences Methods + (Pre-submittal Discussion of X-energy Topical Report, Atmospheric Dispersion and Dose Consequences Methods)
- ML24138A128 + (Pre-submittal May 15, 2024 Meeting Presentation License Amendment Request: Public Slides)
- PMNS20221161, Pre-submittal Meeting - Meeting Between NRC and SNC Regarding Proposed Vogtle TS 5.5.11, Ventilation Filter Testing Program, License Amendment Request + (Pre-submittal Meeting - Meeting Between NRC and SNC Regarding Proposed Vogtle TS 5.5.11, Ventilation Filter Testing Program, License Amendment Request)
- ML22046A295 + (Pre-submittal Meeting - Request for Alternative to ASME OM Code ISTC-3630 - PIV Leakage (L-2022-LRM-0010))
- EPID:L-2022-LRM-0110 + (Pre-submittal Meeting - Request for Alternative to ASME OM Code ISTC-3630 - PIV Leakage (L-2022-LRM-0010))
- PMNS20221166, Pre-submittal Meeting Between NRC and SNC Regarding a Proposed License Amendment Request (LAR) for Vogtle, Units 1 and 2, Related to a Technical Specification (TS) 3.4.14, RCS (Reactor Coolant System) Pressure Isolation Valve (PIV) Leak + (Pre-submittal Meeting Between NRC and SNC Regarding a Proposed License Amendment Request (LAR) for Vogtle, Units 1 and 2, Related to a Technical Specification (TS) 3.4.14, RCS (Reactor Coolant System) Pressure Isolation Valve (PIV) Leakage)
- ML16334A445 + (Pre-submittal Meeting Byron UT RR Presentation)
- ML22039A200 + (Pre-submittal Meeting Draft Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program)
- ML25097A176 + (Pre-submittal Meeting Materials for Limericks Proposed ILRT LAR)
- ML21036A038 + (Pre-submittal Meeting Presentation (02/08/2021) Relief Request No. IP3-ISI-RR-16)
- ML21308A493 + (Pre-submittal Meeting Presentation - License Amendment Request to Revise Sequoyah Operating License to Use Fire and Seismic PRA Models for 10 CFR 50.69 Risk-Informed Categorizations (EPID L-2021-LRM-0109) (Slides))
- ML22046A293 + (Pre-submittal Meeting Presentation - Request for Alternative to ASME OM Code ISTC-3630 Regarding Leakage of Pressure Isolation Valves)
- PMNS20240649, Pre-submittal Meeting Regarding Kaiross Power Reactor Protection Platform Topical Report + (Pre-submittal Meeting Regarding Kaiross Power Reactor Protection Platform Topical Report)
- ML24038A174 + (Pre-submittal Meeting Slides)
- ML25169A074 + (Pre-submittal Meeting Slides - Farley Units 1 and 2 - Removal of RCS Subcooling Margin Monitor from TS List of Post Accident Monitoring Instrumentation)
- ML25140A042 + (Pre-submittal Meeting Slides Regarding Proposed License Amendment Request to Eliminate Main Steam Tunnel Temperature High Isolation from Technical Specification 3.3.6.1, May 21, 2025)
- ML23174A001 + (Pre-submittal Meeting Slides Regarding Update to the FitzPatrick Fuel Handling Accident Analysis with Impacts to Technical Specifications, June 26, 2023)
- ML23178A083 + (Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs)
- ML22061A139 + (Pre-submittal Meeting Slides for Planned License Amendment Request to Consolidate Fuel Decay Time Requirements)
- ML23276A652 + (Pre-submittal Meeting Summary, September 14, 2023)
- ML22318A104 + (Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation)
- PMNS20211405, Pre-submittal Meeting for Entergy Operations, Inc., River Bend Station, Unit 1, IST Program Relief Request for Pressure Isolation Valve Testing Frequency + (Pre-submittal Meeting for Entergy Operations, Inc., River Bend Station, Unit 1, IST Program Relief Request for Pressure Isolation Valve Testing Frequency)