Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML093240159 + (One Time Exemption from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.b)
- ML092740017 + (One Time Extension of the Completion Time for 1J - 480 Volts AC Distribution Subsystem (ME1777))
- ML093060342 + (One Time Extension of the Completion Time for 1 J - 480 Volt AC Distribution Subsystem Withdrawal of License Amendment Request)
- ML092240203 + (One Time Extension of the Completion Time for 1J - 480 Volt AC Distribution Subsystem (ME1777) - Acceptance Review)
- GNRO-2003/00029, One Time Extension on Integrated Leak Rate Test & Drywell Bypass Test Interval + (One Time Extension on Integrated Leak Rate Test & Drywell Bypass Test Interval)
- LR-N07-0005, One Time License Change Request LCR S07-01 Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance) + (One Time License Change Request LCR S07-01 Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance))
- LR-N07-0064, One Time License Change Request, Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance.) + (One Time License Change Request, Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance.))
- ML053260493 + (One Time Request for Relief from American Society of Mechanical Engineers (Asme), Section XI Code Requirements - Tests Following Repair, Modification, or Replacement (IWE-5221))
- ENS 46196 + (One Train Eccs Declared Inoperable Due to Void in "a" Rhr Heat Exchanger)
- ML20154P574 + (One White Flint North Garage Remedial Repair Specification)
- HNP-04-076, One Year Special Report, Steam Generator Tube Inspection Results + (One Year Special Report, Steam Generator Tube Inspection Results)
- ML18263A040 + (One Year Without a Disposal Site for Low-Level Radioactive Waste - Lessons Learned from the Barnwell Closure to 31 States 7/1/94 - 6/30/95 (Enclosure to Comments Submitted on DSI-4, DSI-5, DSI-7, DSI-9, DSI-12, DSI-13, DSI-14, DSI-21, DSI-G)
- ML20135C920 + (One Yr Without Disposal Site for Low-Level Radwaste,Lessons Learned from Barnwell Closure to 31 States)
- ENS 42968 + (One and Possibly Five Other Class "C" Fuel Assemblies Were Singled Out as Having the Potential of Having Flaws Above the Hairline Crack or Pinhole Leak Criteria.)
- ENS 48387 + (One of Sixty Six Reactor Vessel Penetrations Did Not Meet Acceptance Criteria)
- ENS 43928 + (One of Two Main Feedwater Pumps Trip)
- ENS 49004 + (One of Two National Weather Service Tone Alert Radios Out of Service)
- ENS 41095 + (One of Two Pressurizer Level Instrumentation Channels Found to Be Inoperable.)
- ML18192A184 + (One of the Wells Selected for Groundwater Monitoring Program, Number 177 Abb, Has Been Determined to Be Unavailable for Water Level Measuring. Substituted with Well Number 17 Abb)
- ML083380675 + (One, Unit 1 - Request for Additional Information TS 3.0.8)
- ML13133A136 + (One, Unit 1, ANO1 Steam Generator Tube Inspection Discussion Points, Preventative Tube to Plug and Proximity Calls)
- ML13133A138 + (One, Unit 1, ANO1 Steam Generator Tube Inspection Discussion Points, Preventative Tube Plugging and Proximity Calls)
- ML13133A126 + (One, Unit 1, ANO1 Steam Generator Tube Inspection Discussion Points)
- ML12284A459 + (One, Unit 2 2012-08 Public Forms)
- ML20077G980 + (One,Unit II Reactor Containment Bldg Integrated Leakage Rate Test)
- ML20147C649 + (One,Unit-II,Simulator Operability Test)
- ML19296A608 + (One-Dimensional Calculation of Flow Branching Using Method of Characteristics)
- ML14330A639 + (One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 2 of 2)
- DCL-14-110, One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 2 + (One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 2)
- ML043420465 + (One-Inch Non-Radioactive Steam Line Break at V. C. Summer Station)
- ML19340C254 + (One-Line Diagram Inverters:120 Volt AC Vital Distribution Panel. Sheet 1)
- ML19257C323 + (One-Sixth Scale Model BWR Jet Pump Test, Informal Ltr)
- ML18122A065 + (One-Time Authorization to Ship Irradiated PWR Rod Sections in the Bea Research Reactor Package)
- ULNRC-05520, One-Time Completion Time Extension for Essential Service Water (ESW) System, (OL1281) + (One-Time Completion Time Extension for Essential Service Water (ESW) System, (OL1281))
- ULNRC-05534, One-Time Completion Time Extension for Essential Service Water (ESW) System + (One-Time Completion Time Extension for Essential Service Water (ESW) System)
- ULNRC-05476, One-Time Completion Time Extension for Essential Service Water (ESW) System + (One-Time Completion Time Extension for Essential Service Water (ESW) System)
- ULNRC-05445, One-Time Completion Time Extension for Essential Service Water (ESW) System + (One-Time Completion Time Extension for Essential Service Water (ESW) System)
- ULNRC-05563, One-Time Completion Time Extension for Essential Service Water System + (One-Time Completion Time Extension for Essential Service Water System)
- ML051810267 + (One-Time Emergency Technical Specification Change for Emergency Diesel Generator (EDG) 1B-B Maintenance to Extend the Allowed Outage Time (AOT) - Technical Specification (TS) Change 05-05)
- L-2012-155, One-Time Exemption Request 10 CFR 26.205(d)(3) - Work Hour Controls + (One-Time Exemption Request 10 CFR 26.205(d)(3) - Work Hour Controls)
- L-2012-173, One-Time Exemption Request Regarding Work Hour Controls + (One-Time Exemption Request Regarding Work Hour Controls)
- SBK-L-20146, One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c + (One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c)
- L-2011-445, One-Time Exemption Request from Portions of 10 CFR 26.205(d)(3) - Work Control Hours + (One-Time Exemption Request from Portions of 10 CFR 26.205(d)(3) - Work Control Hours)
- L-2011-408, One-Time Exemption Request from Portions of 10 CFR 26.205(d)(3) - Work Hour Controls + (One-Time Exemption Request from Portions of 10 CFR 26.205(d)(3) - Work Hour Controls)
- RA-21-0330, One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d + (One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d)
- CNL-21-099, One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d + (One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d)
- ML090410275 + (One-Time Exemption from 10 CFR 50.36a(a)(2))
- ML21335A449 + (One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery)
- ML21337A213 + (One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery)
- ML21337A208 + (One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery (EPID L-2021-LLE-0046) (FRN))
- ML21335A448 + (One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial Emergency Preparedness Evaluated Exercise Requirements Due to Severe Storm Recovery (EPID L-2021-LLE-0046) (Letter))