Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 40720 + (Non-Licensed Employee Tested Positive for Alcohol)
- ENS 40630 + (Non-Licensed Employee Tested Positive for Alcohol)
- ENS 43763 + (Non-Licensed Employee Tested Positive for Alcohol During Random Testing)
- ENS 40706 + (Non-Licensed Employee Tested Positive for Controlled Substance)
- ENS 41814 + (Non-Licensed Supervisor Failed Fitness for Duty Test for Drugs)
- ENS 42919 + (Non-Licensed Supervisor Failed Follow-Up Testing)
- ENS 54037 + (Non-Licensed Supervisor Failed Follow-Up Testing)
- ENS 41788 + (Non-Licensed Supervisor Failed Random Fitness for Duty Test)
- ENS 46008 + (Non-Licensed Supervisor Fitness for Duty)
- ENS 50782 + (Non-Licensed Supervisor Tested Positive for Alcohol During Random Testing)
- ENS 50606 + (Non-Licensed Supervisor Tested Positive for Alcohol)
- ENS 54474 + (Non-Licensed Supervisor Tested Positive for Alcohol)
- ENS 50173 + (Non-Licensed Supervisor in Violation of Fitness for Duty Policy)
- ENS 53469 + (Non-Licensed Supervisory Contractor Subverts Fitness for Duty Test)
- ENS 50857 + (Non-Licensed Supervisory Contractor Tested Positive for Alcohol)
- ENS 52116 + (Non-Licensed Supervisory Contractor Tested Positive for Alcohol)
- ENS 50879 + (Non-Licensed Supervisory Employee Tested Positive for Alcohol)
- ENS 54530 + (Non-Licensed Supervisory Personnel Violated Ffd Policy)
- ML17319A517 + (Non-Light Water Reactor Strategy 2 Implementation Action Plan Progress Report)
- ML19275F299 + (Non-Light-Water Review Strategy - Staff White Paper - September 2019)
- ML19274D379 + (Non-Linear Time History Seismic Analysis for Crystal River Unit 3 High Density Spent Fuel Storage Racks. Discusses Free Standing Storage Racks,Applicable Codes,Standards, Specs & Acceptance Criterion)
- ML18227B004 + (Non-Loca Accidents Safety Evaluation for Higher Levels of Steam Generator Tube Pugging, NAD-QR-46, June 1978)
- ML20259B085 + (Non-Nuclear Instrumentation Detailed Schematic:Power Distribution-Fused Power-NNI-X Part 4)
- ML20259B252 + (Non-Nuclear Instrumentation Detailed Schematic:Power Distribution-Fused Power-NNI-X Part 1)
- ML20259B404 + (Non-Nuclear Instrumentation Detailed Schematic:Power Distribution-Fused Power-NNI-Y,Part 3)
- ML20259A996 + (Non-Nuclear Instrumentation Sys Detailed Schematic Core Flooding Part 2)
- ML20259B407 + (Non-Nuclear Instrumentation Sys Detailed Schematic: Intermediate Cooling)
- ML20259B410 + (Non-Nuclear Instrumentation Sys Detailed Schematic:Reactor Coolant,Part 1)
- ML20259B068 + (Non-Nuclear Instrumentation Sys Detailed Schematic:Reactor Coolant Part 2. (RC1,3,3A & 3B))
- ML20259B422 + (Non-Nuclear Instrumentation Sys Detailed Schematic: Make-up & Purification,Part 4)
- ML20259B006 + (Non-Nuclear Instrumentation Sys Detailed Schematic:Make-Up and Purification Part-2. (MUR 7,17,18,23))
- ML20259B023 + (Non-Nuclear Instrumentation Sys Detailed Schematic: Secondary Plant Part 4. (SF5B,7B &l8B))
- ML20259B415 + (Non-Nuclear Instrumentation Sys Detailed Schematic: Secondary Plant,Part 7)
- ML20259B158 + (Non-Nuclear Instrumentation Sys Detailed Schematic: Reactor Coolant,Part 4)
- ML20259A988 + (Non-Nuclear Instrumentation Sys Detailed Schematic Reactor Bldg Spray. (Bs 3 & 7))
- ML20259B168 + (Non-Nuclear Instrumentation Sys Detailed Schematic:Decay Heat Removal,Part 1)
- ML20259B078 + (Non-Nuclear Instrumentation Sys Detailed Schematic:Reactor Coolant Part 3. (RC3A,4A,4B,6A,6B,7A & 7B))
- ML20259B141 + (Non-Nuclear Instrumentation Sys Detailed Schematic: Reactor Coolant Part 6. (Rc 4A,4B,3,3B))
- ML20259B181 + (Non-Nuclear Instrumentation Sys Detailed Schematic:Reactor Coolant,Part 5)
- ML20259A950 + (Non-Nuclear Instrumentation Sys Detailed Schematic:Reactor Coolant Part 9)
- ML20259A944 + (Non-Nuclear Instrumentation Sys Detailed Schematic:Reactor Coolant Part 9)
- ML20259B109 + (Non-Nuclear Instrumentation Sys Detailed Schematic: Secondary Plant Part 2. (SPIB-2,SPIB-3,SP3A,SP3B))
- ML20259B150 + (Non-Nuclear Instrumentation Sys Detailed Schematic: Secondary Plant,Part 3)
- ML20259B028 + (Non-Nuclear Instrumentation Sys Detailed Schematic Make-Up and Purification Part 3. (MUR 3,24,25 & 40))
- ML20259B148 + (Non-Nuclear Instrumentation Sys Detailed Schematic: Secondary Plant,Part 1)
- ML20259B190 + (Non-Nuclear Instrumentation Sys Detailed Schematic:Chemical Addition (CA 12,13 & 14))
- ML20259B049 + (Non-Nuclear Instrumentation Sys Detailed Schematic: Secondary Plant Part 5. (SP4A,4B,6A & 6B))
- ML20259B428 + (Non-Nuclear Instrumentation Sys,Detailed Schematic: Make-up & Purification)
- ML20259B441 + (Non-Nuclear Instrumentation Sys,Detailed Schematic:Reactor Coolant,Part 7)
- ML20259B466 + (Non-Nuclear Instrumentation Sys,Detailed Schematic: Make-up & Purification,Part 1)
- ML20259B458 + (Non-Nuclear Instrumentation Sys,Detailed Schematic: Secondary Plant,Part 6)