Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000254/LER-2020-002, Main Steam Line Drain Valve Declared Inoperable Due to Improper Torque Switch Setting + (Main Steam Line Drain Valve Declared Inoperable Due to Improper Torque Switch Setting)
- ML20260D890 + (Main Steam Line Drain Valves Logic Diagram System:Mt. Actual Drawing NUMBER:6T-16-9-Z-40274 1)
- ML20260D874 + (Main Steam Line Drain Valves Logic Diagram System:Mt. Actual Drawing NUMBER:6T-16-9-Z-40273 1)
- ENS 43224 + (Main Steam Line Flow Instrument Line Pressure Boundary Leakage)
- 05000325/LER-1979-056-03, Main Steam Line Hi Radiation Monitor B Found Actuating at 3.95 Times Background,Above Allowable Limit.Caused by Instrument Drift. Monitor Recalibr + (Main Steam Line Hi Radiation Monitor B Found Actuating at 3.95 Times Background,Above Allowable Limit.Caused by Instrument Drift. Monitor Recalibr)
- 05000255/LER-2077-027-03, Main Steam Line Hydraulic Shock Suppressor Failure + (Main Steam Line Hydraulic Shock Suppressor Failure)
- 05000440/LER-2023-002, Main Steam Line Leakage Exceeded Technical Specification Limit + (Main Steam Line Leakage Exceeded Technical Specification Limit)
- LR-N08-0111, Main Steam Line Limit Curves + (Main Steam Line Limit Curves)
- PLA-6346, Main Steam Line Limit Curves + (Main Steam Line Limit Curves)
- ML20260B159 + (Main Steam Line PORVs Logic Diagram System:Ms)
- 05000458/FIN-2009005-01 + (Main Steam Line Plus Seal Failure Results in Loss of Reactor Cavity Inventory)
- ML20260E052 + (Main Steam Line Porvs Logic Diagram System:Ms. Actual Drawing NUMBER:5S-10-9-Z-40079 1)
- ML20261K240 + (Main Steam Line Porvs Logic Diagram System:Ms)
- ENS 47656 + (Main Steam Line Pressure Transmitters Found Inoperable)
- ENS 51871 + (Main Steam Line Radiation Detector Determined to Be Non Functional)
- ENS 54272 + (Main Steam Line Radiation Monitor Communication Failure)
- ENS 53212 + (Main Steam Line Radiation Monitor Determined to Be Non Functional)
- ENS 53472 + (Main Steam Line Radiation Monitor Determined to Be Non-Functional)
- ENS 53154 + (Main Steam Line Radiation Monitor Determined to Be Non-Functional)
- ENS 49498 + (Main Steam Line Radiation Monitor Out of Service)
- 05000321/LER-1983-084-03, Main Steam Line Radiation Monitors Found to Have High Setpoint Greater than Three Times Normal Operating Background.Caused by Procedural Inadequacy.Procedure Changed + (Main Steam Line Radiation Monitors Found to Have High Setpoint Greater than Three Times Normal Operating Background.Caused by Procedural Inadequacy.Procedure Changed)
- ML19323G703 + (Main Steam Line Rupture Analyses for Yankee Rowe)
- ML022830276 + (Main Steam Line Valve Out-of-Service Final Report)
- ML022810290 + (Main Steam Line Valve Out-of-Service Final Report)
- ML20117M526 + (Main Steam Monitoring Test,Test-Analysis Correlation)
- ML20262E158 + (Main Steam Ms)
- ML20266E912 + (Main Steam Ms. Sheet 1)
- ML20265A785 + (Main Steam Outside CTMT to HP Turbine Control Valves & to Condenser 30,24 EB-1;24,18,16 EB-2 & 10 HB-12, as-built. Drawing Consists of 2 Aperture Cards)
- ML20266J833 + (Main Steam Outside CTMT to HP Turbine Control Valves and to Condenser 30,24 EB-1;24,18,16 EB-2 & 10 HB-12 Unit 1, as- Built)
- ML20266J831 + (Main Steam Outside Containment to HP Turbine Control Vlvs Unit 2 30 INCHES,24 Inches EB-1;24 Inches 18 INCHES,16 Inches EB2, as-built)
- ML20262G704 + (Main Steam P&I Diagram. Sheet 2 of 2)
- ML20262J951 + (Main Steam Piping, as-built.Sheet 1)
- ML20262J954 + (Main Steam Piping, as-built.Sheet 2)
- ML20261C161 + (Main Steam Piping:Containment & Turbine Area, as-built)
- ML20261J518 + (Main Steam Positive Leakage Control System P & I Flow Diagram. Sheet 1 of 2)
- ML20261L500 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 9 of 14)
- ML20261L465 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 2 of 14)
- ML20261L495 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 8 of 14)
- ML20261L489 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 7 of 14)
- ML20261L526 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 14 of 14)
- ML20261L479 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 5 of 14)
- ML20261L458 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 1 of 14)
- ML20261L469 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 3 of 14)
- ML20261L522 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 13 of 14)
- ML20261L484 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 6 of 14)
- ML20261L517 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 12 of 14)
- ML20261L506 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 10 of 14)
- ML20261L512 + (Main Steam Positive Leakage Control System Elementary Diagram. Sheet 11 of 14)
- ML20261J523 + (Main Steam Positive Leakage Control System P & I Flow Diagram. Sheet 2 of 2)
- ML20211P880 + (Main Steam Pressure Control Review Final Rept)
- ML20260E065 + (Main Steam Promary & Secondary Inlet Shutoff Motor Operated Vlvs Logic Diagram System:Ms. Actual Drawing NUMBER:6S-10-9-Z-40080 1)