Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137L289 + (Forwards VEGP 10CFR50.46 ECCS Evaluation Models 1996 Annual Rept & Significant Error Rept)
- ML20070D352 + (Forwards VEGP Procedure 55038-C,Rev 2, Diesel Start Log. Version in Effect in Relevant Time Frame.W/Svc List)
- ML20129F906 + (Forwards VEGP Unit 1 Cycle 6 Colr)
- ML20134A029 + (Forwards VEGP Unit 1 Cycle 7 COLR, Rev 1 & VEGP Unit 2 Cycle 6 COLR, Rev 1)
- ML20134A031 + (Forwards VEGP Unit 1 Cycle 7 COLR, Rev 1 & VEGP Unit 2 Cycle 6 COLR, Rev 1)
- ML20205A944 + (Forwards VEGP Unit 1 Cycle 9 Colr,Per TS 5.6.5.d)
- ML18114A513 + (Forwards VEP-FRD-32, Surry Unit 2,Cycle 4 Core Performance Rept)
- ML18114A515 + (Forwards VEP-FRD-32, Surry Unit 2,Cycle 4 Core Performance Rept.)
- ML18136A020 + (Forwards VEP-FRD-33, VEPCO Reactor Core Thermal-Hydraulic Analysis Using Cobra Iiic/Mit Computer Code)
- ML18136A021 + (Forwards VEP-FRD-33, VEPCO Reactor Core Thermal-Hydraulic Analysis Using Cobra Iiic/Mit Computer Code.)
- ML18139A783 + (Forwards VEP-FRD-37, Surry Unit 2,Cycle 5 Startup Physics Test Rept)
- ML18139A784 + (Forwards VEP-FRD-37, Surry Unit 2,Cycle 5 Startup Physics Test Rept.)
- ML20062L221 + (Forwards VEP-FRD-39, North Anna Unit 2,Cycle 1 Startup Physics Test Rept)
- ML18141A159 + (Forwards VEP-FRD-41, Reactor Sys Transient Analyses Using Retran Computer Code, in Response to Questions Raised at 830921 Meeting Re Methodology Used to Analyze Steam Line Break.Meeting Proposed for Third Wk of Oct 1983)
- ML18139B241 + (Forwards VEP-FRD-41, Reactor Sys Transient Analyses Using Retran Computer Code)
- ML18139B242 + (Forwards VEP-FRD-41, Reactor Sys Transient Analyses Using Retran Computer Code.)
- ML18139B399 + (Forwards VEP-FRD-42, Reload Nuclear Design Methodology)
- ML18139B400 + (Forwards VEP-FRD-42, Reload Nuclear Design Methodology.)
- ML20126K889 + (Forwards VEP-FRD-43, North Anna Unit 1,Cycle 3,Startup Physics Test Rept)
- ML18139B610 + (Forwards VEP-FRD-45, VEPCO Nuclear Design Reliability Factors. Rept Describes Methods & Data Base Used to Derive Nuclear Reliability Factors for Application to Core Physics Input Parameters Used in Reload Safety Evaluation)
- ML18139B661 + (Forwards VEP-FRD-46, Surry Unit 2,Cycle 5 Core Performance Rept)
- ML18139B662 + (Forwards VEP-FRD-46, Surry Unit 2,Cycle 5 Core Performance Rept.)
- ML18139B789 + (Forwards VEP-FRD-47, Surry Unit 2,Cycle 6 Startup Physics Test Rept)
- ML20062L921 + (Forwards VEP-FRD-49, North Anna Unit 2,Cycle 2 Startup Physics Test Rept)
- ML20071K372 + (Forwards VEP-FRD-50, North Anna Unit 1,Cycle 3 Core Performance Rept)
- ML19257D352 + (Forwards VEP-FRO-34, Cycle 1,Core Performance Rept)
- ML19257D353 + (Forwards VEP-FRO-34, Cycle 1,Core Performance Rept.)
- ML18153C861 + (Forwards VEP-NAF-2, Reactor Power Distribution Analysis Using Moveable In-Core Detection Sys & Tip/Cecor Computer Code Package)
- ML18151A895 + (Forwards VEP-NAF-2, Reactor Power Distribution Analysis Using Moveable In-Core Detection Sys & Tip/Cecor Computer Code Package.)
- ML18149A511 + (Forwards VEP-NE-3 Qualification of WRB-1 CHF Correlation in VEPCO Cobra Code, for Review & Approval.Fee Paid)
- ML18149A510 + (Forwards VEP-NE-3 Qualification of WRB-1 CHF Correlation in VEPCO Cobra Code, for Review & Approval.Fee Paid)
- ML20097D058 + (Forwards VEP-NOS-11, North Anna Unit 2,Cycle 3 Core Performance Rept)
- ML18142A347 + (Forwards VEP-NOS-17, Surry Unit 2,Cycle 7 Core Performance Rept)
- ML18142A348 + (Forwards VEP-NOS-17, Surry Unit 2,Cycle 7 Core Performance Rept.)
- ML20073K032 + (Forwards VEP-NOS-2, North Anna Unit 1,Cycle 4 Startup Physics Test Rept)
- ML20069K356 + (Forwards VEP-NOS-3, North Anna Unit 2,Cycle 2 Core Performance Rept)
- ML18141A162 + (Forwards VEPCO Nomad Code & Model. Rept Is One of Series Discussing Nuclear Reload Licensing & Core Follow Support Capabilities)
- ML20094C175 + (Forwards VEPCO North Anna Power Station,Units 1 & 2 10CFR50,App R Rept - App a, Per 840515 Request.Rept Includes Summary Comparison of 1984 App R Reanalysis & Util 820622 post-fire Safe Shutdown Review)
- ML20108B572 + (Forwards VEPCO Proposed Program,Mechanical Cleaning & Valve Repair Svc Water Sys,North Anna Power Station, Per 841002 & 1204 Meetings.Concurrence in Program Requested by 850415. Amend to Tech Spec 3/4.7.4 Will Be Submitted in Mar 1985)
- ML19312C573 + (Forwards VEPCO Response to ASLB Subpoena.W/O Encl. Certificate of Svc Encl)
- ML20036A792 + (Forwards VEPCO to NRC Re Unsatisfactory Blind Performance Test Reported by Compuchem Labs,Inc,For Review Action.Updated List of NRC Licensee fitness-for-duty Contacts Also Encl)
- ML17279B201 + (Forwards VIPRE-01, Thermal-Hydraulic Analysis Code for Reactor Cores. Rept to Complete Set of Vipre Documents Forwarded on 870801,per Util Group for Regulatory Action Request.W/O Encl)
- ML20140B374 + (Forwards VP Milestone Summary Rept for Dec 1985.Rept Summarizes Progress on Milestone Activities at All Sites & Is Comprised of Project Cumulative Status Sheet & Outstanding Milestone Activities Sheets)
- ML20205F302 + (Forwards VP Milestone Summary Rept for Feb 1987.Rept Summarizes Progress on Milestone Activities at All Sites)
- ML20033E958 + (Forwards VP Milestone Summary Rept for Jan 1990,providing Snapshot Summary of Progress on Significant Activities at Each Site & Identifying Bottlenecks.Contractors Requested to Inform C Moore or C Duran of Incorrect Data)
- ML20217E799 + (Forwards VP Milestone Summary Rept for Nov & Dec 1988,to Provide Snapshot Summary of Progress on Significant Activities at Each Site & Help Identify Bottlenecks. W/O Encl)
- ML20203P827 + (Forwards VP Milestone Summary Rept of All Sites for Mar, Consisting of Project Cumulative Status Sheet & Outstanding Milestone Activity Sheets,For Review & Use)
- ML20151N560 + (Forwards VP-NOS-20, North Anna Unit 1,Cycle 5 Core Performance Rept)
- ML20155F561 + (Forwards VP-NOS-24, North Anna Unit 2,Cycle 4 Core Performance Rept)
- ML18149A213 + (Forwards VP-NOS-26, Surry Unit 1 Cycle 8 Core Performance Rept)
- ML18149A214 + (Forwards VP-NOS-26, Surry Unit 1 Cycle 8 Core Performance Rept.)