Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20057D147 + (Forwards Response to NRC Bulletin 91-001,Suppl 1, Reporting Loss of Criticality Safety Controls. Westinghouse Will Upgrade Site Emergency Plan to Incorporate Addl Language from Suppl for Addl Clarification & Training Purposes)
- HL-2322, Forwards Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Fire Watch for Drywell Access Room Will Be Performed + (Forwards Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Fire Watch for Drywell Access Room Will Be Performed)
- L-92-218, Forwards Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Damage. Thermo-Lag 330 Fire Barrier Sys Not Installed at Facilities + (Forwards Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Damage. Thermo-Lag 330 Fire Barrier Sys Not Installed at Facilities)
- ML20099B042 + (Forwards Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Roving Fire Watches Established for Areas Listed in Table 1)
- ML18153D141 + (Forwards Response to NRC Bulletin 92-001,Suppl 1, Failure of Thermo-Lag 330 Fire Barrier Sys to Perform Specified Fire Endurance Function. Hourly Fire Watch Implemented on HVAC Ducts in Turbine Bldg & Unit 1 Emergency Switchgear Room)
- ML20099B951 + (Forwards Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Use of Thermo-Lag 330 Fire Barrier Sys at Plant Limited)
- ELV-03897, Forwards Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Hourly Monitoring of Air Temp Inside Containment Terminated + (Forwards Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Hourly Monitoring of Air Temp Inside Containment Terminated)
- ML20102A280 + (Forwards Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduit Free from Fire Damage. Thermo-Lag Fire Barriers May Be Replaced W/Tested Sys)
- ST-HL-AE-4156, Forwards Response to NRC Bulletin 92-001 Re Thermo-Lag 330 Fire Barrier matl.Thermo-Lag 330 Fire Barrier Sys Used to Protect Safe Shutdown Circuits at Both Facilities.Hourly Fire Watches Established for Each Affected Fire Area + (Forwards Response to NRC Bulletin 92-001 Re Thermo-Lag 330 Fire Barrier matl.Thermo-Lag 330 Fire Barrier Sys Used to Protect Safe Shutdown Circuits at Both Facilities.Hourly Fire Watches Established for Each Affected Fire Area)
- ML20034E668 + (Forwards Response to NRC Bulletin 92-002, Safety Concerns Relating to End of Life of Aging Theratronics Teletherapy Units)
- ML20127N371 + (Forwards Response to NRC Bulletin 92-002, Safety Concerns Relating to End of Life of Aging Theratronics Teletherapy Units)
- ML20036C092 + (Forwards Response to NRC Bulletin 93-002, Debris Plugging of ECC Suction Strainers. Walkdown Identified Small Portions of Insulation Exposed on Chilled Water Sys Piping. No Other Temporary Fibrous Matls Found)
- ML20045B401 + (Forwards Response to NRC Bulletin 93-002, Debris Plugging of ECC Suction Strainers. Administrative Review Verified That Inventory of Temporary Fibrous Matls Limited to Approx 16 Square Inches in Unit 1 & 12 Square Inches in Unit 2)
- ML20057D072 + (Forwards Response to NRC Bulletin 93-002, Debris Plugging of ECCS, Documenting Action Taken on Containment Purge Ventilation Sys After Discussions W/Members of Staff)
- ML20045B532 + (Forwards Response to NRC Bulletin 93-002, Debris Plugging of ECC Suction Strainers. Review of Containment Instrument Air Sys Filters Determined That Filters Could Not Be Dislodged Following LOCA)
- ML20029C744 + (Forwards Response to NRC Bulletin 93-002,Suppl 1, Debris Plugging of Emergency Core Cooling Suction Strainers Hope Creek Generating Station)
- ST-HL-AE-4458, Forwards Response to NRC Bulletin 93-002.Util Conducted Review of Relevant Sys/Component Drawings,Procedures, Calculation,Related Operating Experience Repts & Design Basis Documents + (Forwards Response to NRC Bulletin 93-002.Util Conducted Review of Relevant Sys/Component Drawings,Procedures, Calculation,Related Operating Experience Repts & Design Basis Documents)
- B14501, Forwards Response to NRC Bulletin 93-002, Debris Plugging of ECC Suction Strainers. Fibrous Air Filters & Other Temporary Sources of Fibrous Matl Identified in Primary Containment of Facilities + (Forwards Response to NRC Bulletin 93-002, Debris Plugging of ECC Suction Strainers. Fibrous Air Filters & Other Temporary Sources of Fibrous Matl Identified in Primary Containment of Facilities)
- ML17331A342 + (Forwards Response to NRC Bulletin 93-002, Debris Plugging of ECC Suction Strainers. Review Concluded That No Temporary Components Exist in Containment Which Would End Up in Containment Sump)
- ML20046C599 + (Forwards Response to NRC Bulletin 93-003, Resolution of Issues Related to Rv Water Level Instrumentation in BWRs & Info Necessary to Allow Closure of GL 92-04 for Facility)
- NRC-93-0095, Forwards Response to NRC Bulletin 93-003, Resolution of Issues Related to Rv Water Level Instrumentation in Bwrs + (Forwards Response to NRC Bulletin 93-003, Resolution of Issues Related to Rv Water Level Instrumentation in Bwrs)
- PY-CEI-NRR-1681, Forwards Response to NRC Bulletin 93-003, Resolution of Issues Related to Rv Water Level Instrumentation in Bwrs. Info Also Responds to NRC 930520 RAI Re Proposed C/As & Implementation Schedule Required by GL 92-04 + (Forwards Response to NRC Bulletin 93-003, Resolution of Issues Related to Rv Water Level Instrumentation in Bwrs. Info Also Responds to NRC 930520 RAI Re Proposed C/As & Implementation Schedule Required by GL 92-04)
- ML20029E460 + (Forwards Response to NRC Bulletin 94-001, Potential Fuel Pool Drain-Down Caused by Inadequate Maint Practices at Dresden Unit 1. Util Plans to Move Spent Fuel Into Proposed Rancho Seco ISFSI by 1998)
- ML20094L925 + (Forwards Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode)
- ML20094L707 + (Forwards Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode)
- HL-5056, Forwards Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode + (Forwards Response to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode)
- BECO-LTR-95-118, Forwards Response to NRC Bulletin 95-002 Re Unexpected Clogging of Pump Strainers When Pumps Drawing Water from Suppression Pool + (Forwards Response to NRC Bulletin 95-002 Re Unexpected Clogging of Pump Strainers When Pumps Drawing Water from Suppression Pool)
- L-96-268, Forwards Response to NRC Bulletin 96-001, CR Insertion Problems + (Forwards Response to NRC Bulletin 96-001, CR Insertion Problems)
- ML18151A620 + (Forwards Response to NRC Bulletin 96-001, Control Rod Insertion Problems)
- ML20101P245 + (Forwards Response to NRC Bulletin 96-001, Control Rod Insertion Problems)
- ML20101N208 + (Forwards Response to NRC Bulletin 96-001, Control Rod Insertion Problems)
- ST-HL-AE-5333, Forwards Response to NRC Bulletin 96-001, Control Rod Insertion Problems + (Forwards Response to NRC Bulletin 96-001, Control Rod Insertion Problems)
- ULNRC-03360, Forwards Response to NRC Bulletin 96-001, Control Rod Insertion Problems + (Forwards Response to NRC Bulletin 96-001, Control Rod Insertion Problems)
- L-96-107, Forwards Response to NRC Bulletin 96-001, Control Rod Insertion Problems + (Forwards Response to NRC Bulletin 96-001, Control Rod Insertion Problems)
- ML17312A860 + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Safety-Related Equipment)
- ML20117F701 + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment)
- ML20117F217 + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment)
- ML20117F133 + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment)
- ML20111A953 + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment)
- ML20135E805 + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment)
- NG-96-1035, Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment)
- LIC-96-0065, Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment)
- HNP-96-086, Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment)
- L-96-121, Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment)
- ML18152A510 + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment)
- ML18065A719 + (Forwards Response to NRC Bulletin 96-002 Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment)
- ML20111B295 + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment)
- ST-HL-AE-5366, Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel in Reactor Core or Over Safety-Related Equipment + (Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel in Reactor Core or Over Safety-Related Equipment)
- RBG-43371, Forwards Response to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Boiling Water Reactors + (Forwards Response to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Boiling Water Reactors)
- ML20129K169 + (Forwards Response to NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs)
- ML20134G745 + (Forwards Response to NRC Bulletin 96-003, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Boiling Water Reactors)
- ML20217K539 + (Forwards Response to NRC Bulletin 97-002, Puncture Testing of Shipping Packages Under 10CFR71, Applying to Coc 6553)
- ML20199E978 + (Forwards Response to NRC Bulletin 97-002,requested Actions 1,2 & 3.Technical Responses for USA/4986/AF & USA/9019/AF Which Resulted from Findings of Formal Review Process,Encl)
- ML20154F553 + (Forwards Response to NRC Bulletin No 88-009, Thimble Tube Thinning in Westinghouse Reactors. Informs That Eddy Current Testing of Flux Mapping Thimbles Successful in Proving That at Present Time Thimbles Sound)
- L-88-413, Forwards Response to NRC Bulleting 88-005 Re Purchasing Documentation & Listing of All Nonconforming Matl,Matl Use Disposition Status & Justification of Continued Operation for All Matls Supplied by West Jersey Mfg Co + (Forwards Response to NRC Bulleting 88-005 Re Purchasing Documentation & Listing of All Nonconforming Matl,Matl Use Disposition Status & Justification of Continued Operation for All Matls Supplied by West Jersey Mfg Co)
- ML20236Y307 + (Forwards Response to NRC Comment 10 on Environ Evaluation for Post Defueling Monitored Storage, Provided in NRC .Encl Lists Assumptions Made for Purpose of Determining Loading on HEPA Filter Due to Smoke from Fire)