Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML032731594 + (Early Site Permit Application, Revision 0, Site Safety Analysis Report, Figures 2.5-15 Through 2.5-45)
- ML032731593 + (Early Site Permit Application, Revision 0, Site Safety Analysis Report, Section 2.5.5 Through Figure 2.5-12)
- ML032731616 + (Early Site Permit Application, Revision 0, Environmental Report, Chapter 3 Through Programs and Plans, Section 1.2.3)
- ML061060003 + (Early Site Permit Application: Evaluation of Transportation Accidents on the Mississippi River)
- ENS 47446 + (Early Site Permit Postulated Seismic Acceleration Is Less than Projected Based on New Information)
- ML20072B387 + (Early Site Permit Program Plan)
- ML030140458 + (Early Site Permit Project Manager Reassignment for North Anna)
- ML022740172 + (Early Site Permit Project Quality Assurance Plan)
- ML033520358 + (Early Site Permit Review for the Clinton Site)
- ML033300252 + (Early Site Permit Review for the North Anna Power Station Site)
- ML031540694 + (Early Site Permit Topic 8 (ESP-8), Fuel Cycle and Transportation Impacts)
- ML19212A228 + (Early Site Review for Facilities)
- ML19242D917 + (Early Site Review for Facilities)
- ML20148K130 + (Early Site Reviews for Nuclear Power Facilities:Procedures & Possible Technical Review Options,Draft Revision)
- ML19308A241 + (Early Site Suitability Review Environ Rept. Rept Covers Environ Effects of Site Preparation & Station Operation & Describes Effluent & Environ Measurements & Monitoring Programs)
- 05000362/LER-1983-036-03, Early Warning Fire Detectors in Zone 41 Found Inoperable During 6-month Fire Detection Channel Functional Test.Caused by Faulty Wiring Connection.Wiring Connection Repaired + (Early Warning Fire Detectors in Zone 41 Found Inoperable During 6-month Fire Detection Channel Functional Test.Caused by Faulty Wiring Connection.Wiring Connection Repaired)
- ENS 42560 + (Early Warning Siren System (Ewss) Declared Inoperable)
- ENS 41242 + (Early Warning Siren System Failure)
- ENS 46039 + (Early Warning Siren Test Failure)
- ENS 46013 + (Early Warning System Found Non-Responsive During Testing)
- ML20151S757 + (Early and Continuing Effects of Combined Alpha and Beta Irradiation of the Lung.Phase II Report)
- ML21007A294 + (Earth Engineers, Inc., 52-31427-01, 60-Day Expiry Notification)
- ML20053E771 + (Earth Resistivity as a Tool for Shallow Exploration in the Reelfoot Lake Area,Tennessee)
- ML19290E364 + (Earth Science Technical Plan for Mined Geological Disposal of Radwaste, Draft)
- ML21007A295 + (Earth Systems Pacific 04-08357-02, 60-Day Expiry Notification)
- ML12054A081 + (Earthquake AIT Brief)
- ML20118A747 + (Earthquake Analysis of Control Bdlg Cooper Nuclear Generating Station)
- ML20118A748 + (Earthquake Analysis of Reactor Bldg Cooper Nuclear Generating Station)
- ML19260C073 + (Earthquake Damage Observation Rept)
- ENS 40258 + (Earthquake Felt on Site. Entered Emergency Action Level (Eal) 18)
- ML19345E253 + (Earthquake Focal Mechanisms in Southeastern United States)
- ML20065B353 + (Earthquake Hazard Studies in New York State and Adjacent Areas.Final Report.April 1976 - June 1982)
- ML20235B037 + (Earthquake Hazards at Proposed Bodega Head Reactor)
- ML20151H253 + (Earthquake Hazards on Cascadia Subduction Zone, Presented at 880412-15 Meeting in Olympia,Wa)
- Regulatory Guide 3.17 + (Earthquake Instrumentation for Fuel Reprocessing Plants)
- ML19321A539 + (Earthquake Intensity for Piping Analysis & Pipe Support Design. FSAR Excerpt Encl)
- ML20099J926 + (Earthquake Recurrence Intervals at Nuclear Power Plants: Analysis and Ranking)
- ML20205N659 + (Earthquake Resistant Design of Nuclear Facilities W/Limited Radioactive Inventory)
- ML20100D038 + (Earthquake Resistant Design of Retaining Walls, Presented at 621110-12 Second Symposium on Earthquake Engineering in Roorhee,India)
- ML20151H229 + (Earthquake Safety Programs in Schools One Jurisdiction Experience, Presented at 880412-15 Meeting in Olympia,Wa)
- ML20235T446 + (Earthquake on 860131 Near Chardon,Oh & Significance for Perry Nuclear Power Plant & for Earthquake Hazard in Eastern Us.* Testimony Before Subcommittee on Energy & Environ)
- ML20151H138 + (Earthquake-Induced Ground Failure in Western Wa, Presented at 880412-15 Meeting in Olympia,Wa)
- ML19322E150 + (Earthquake-Induced Liquefaction Near Lake Amatitlan, Guatemala)
- ML19290D444 + (Earthquakes & Other Perils,San Diego Region)
- ML13133A191 + (Earthrise Law Center Request for NRC to Reinitiate Section 7 Consultation with the National Marine Fisheries Service for Continued Operation of Pilgrim Nuclear Power Station)
- ML13122A462 + (Earthrise Law Centers Request for NRC to Reinitiate Section 7 Consultation with the National Marine Fisheries Service for Continued Operation of Pilgrim Nuclear Power Station)
- ML20260D810 + (Earthwork Plan & Sections Esws Pumphouse)
- ZS-2010-0219, Easement for Disposal Capacity, in Response to Order Approving Transfer of Licenses and Conforming Amendments Dated May 4, 2009 + (Easement for Disposal Capacity, in Response to Order Approving Transfer of Licenses and Conforming Amendments Dated May 4, 2009)
- ML19249A438 + (Easi on HP-25,HP-65 & HP-67)
- ML021760692 + (Easley NRC OI Interview, 10/29/98)