Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML15350A097 + (EAL-1 Modes 1, 2 & 3)
- ML15125A137 + (EAL-1 Modes 1, 2, 3 & 4)
- ML15044A249 + (EAL-1 for Modes 1, 2 & 3)
- BSEP 15-0092, EAL-2 Modes 4, 5 & Defueled + (EAL-2 Modes 4, 5 & Defueled)
- BSEP 15-0010, EAL-2 Modes 4, 5 & Defueled + (EAL-2 Modes 4, 5 & Defueled)
- CNS-15-030, EAL-2 Modes 5, 6 & Defueled + (EAL-2 Modes 5, 6 & Defueled)
- ML15126A078 + (EAL-Cold Modes 5, 6 & Defueled)
- ML15126A077 + (EAL-Hot Modes 1, 2, 3 & 4)
- ML20065N461 + (EALs Indications Bases)
- ML25092A056 + (EAO-OIP-2025-0051 - Choice Letter to Sanders Medical Products)
- ML25161A008 + (EAO-OIP-2025-0051 - Sanders Medical Products, Inc. - USNRC Review Related to Exports of Byproduct Material and Notice of Violation)
- ML25091A308 + (EAO-OIP-2025-0093 - Choice Letter to Paragon)
- ML25161A007 + (EAO-OIP-2025-0093 - Paragon Energy Solutions, LLC - USNRC Review Related to Export of Reactor Components and Notice of Violation)
- ML25155A010 + (EAO-RIII-2025-0069 (EA-24-079) J L Shepherd and Associates Notice of Violation)
- ML20058L603 + (EAP & Finding of No Significant Impact Re Exemption from Revised 10CFR50.120)
- ML19198A292 + (EAP Expert - Software)
- ML20059A719 + (EAP Supporting Proposed Amends to Revise Limitations on Radioactive Materials Released in Liquid & Gaseous Effluents & Revise 10CFR20 to Recognize New Section Numbers)
- ML20259D165 + (EB-5 (Critical) Condensate Inj to FW Pump 21, as-built)
- ML20259D159 + (EB-5 (Critical) Condensate Inj to FW Pump 21, as-built)
- ML20259D169 + (EB-5 (Critical) Condensate Inj to FW Pump 22, as-built)
- ML20259D180 + (EB-7 & HB-19 & EB5 (Non Nuclear) Aux FW Pump Recirc to Condensate Storage Pump 22 (Unit 2) Non Nuclear, as-built)
- ML20259D136 + (EB-8 (Critical) Aux FW Pump Turbine Steam Supply, as-built)
- ML20259D142 + (EB-8 (Critical) Aux FW Pump Turbine Steam Supply, as-built)
- ML20259D147 + (EB-8 NON-NUCLEAR Aux FW Pump Turbine STM Supply, as-built)
- ML20071D932 + (EBR-II IN-VESSEL NATURAL-CIRCULATION Analysis)
- ML20205P709 + (EBR-II Inherent Safety Demonstration Tests)
- ML102450689 + (EC 360234 Evaluation, Braidwood Station)
- ML102450688 + (EC 360234, Eval - Mech, Braidwood Station)
- ML102450687 + (EC 361017, Revision 000, Evaluation of the Interim Remedial Action Pumping System, Braidwood Station)
- ML102450692 + (EC 361017, Revision a, Evaluation of the Interim Remedial Action Pumping System)
- ML101970283 + (EC 361965, Rev. 00 - Remediation of Tritium Contaminated Groundwater in the Vicinity of Vacuum Breaker 1)
- IR 05000003/2037094 + (EC 5000033794, Revision 1, Indian Point 2 Station Blackout and Appendix R Diesel Generator Set)
- ML090410051 + (EC 5000033794, Revision 1, Indian Point 2 Station Blackout and Appendix R Diesel Generator Set)
- BW230054, EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood + (EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood)
- BW240017, EC 640658, Revision 0 Technical Evaluation for NEI 03-08 Deviation of Control Rod Guide Tube Guide Card Wear Measurements + (EC 640658, Revision 0 Technical Evaluation for NEI 03-08 Deviation of Control Rod Guide Tube Guide Card Wear Measurements)
- ML18215A221 + (EC 69954, Rev 0, Partial Site Release - Phase 1)
- LIC-18-0023, EC 69954, Rev 0, Partial Site Release - Phase 1 + (EC 69954, Rev 0, Partial Site Release - Phase 1)
- ML17158C220 + (EC Insp Repts 50-387/97-05 & 50-388/97-05 on 970321. Violations Noted.Major Areas Discussed:Violations Identified During Insp & Investigations Conducted)
- IR 05000255/1996006 + (EC Rept 50-255/96-06 on 960621.Areas Discussed:Apparent Violations Noted in Insp & Corrective Actions Taken or Planned by Licensee)
- ML17304A761 + (EC Sys & Control Room Temp Rise Study,Quality Class:Q Safety-Related)
- 05000440/FIN-2016004-01 + (ECC B Heat Exchanger Flow Root Valves Out of Position)
- ML19225A038 + (ECC Bypass Scaling)
- ML20265D051 + (ECC Si/Auto Recirculation ESF Status Monitoring Train a Logic Diagram System:Sm)
- ML20260C960 + (ECC Si/Auto Recirculation ESF Status Monitoring Train C Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41875 1)
- ML20260C820 + (ECC Si/Auto Recirculation ESF Status Monitoring Train B Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41847 1)
- ML20261L345 + (ECC St/Auto Recirculation ESF Status Monitoring Train a Logic Diagram System:Sm)
- ML20260C665 + (ECC St/Auto Recirculation ESF Status Monitoring Train a Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41813 1)
- ML19323C637 + (ECCS & Thermal-Hydraulic Analysis for Reload H Design, Nonproprietary Version.Affidavit Encl)
- ML12233A621 + (ECCS 30-Day Report for the Thermal Conductivity Degradation Impact on Large Break Loss of Coolant Accident Analysis with ASTRUM)
- NRC 2012-0038, ECCS 30-Day Report for the Thermal Conductivity Degradation Impact on Large Break Loss of Coolant Accident Analyses with ASTRUM + (ECCS 30-Day Report for the Thermal Conductivity Degradation Impact on Large Break Loss of Coolant Accident Analyses with ASTRUM)
- ML20107K241 + (ECCS Analysis for Susquehanna Unit 1 at Full Power & 87% Flow Using Exxon Nuclear Co Exem BWR Evaluation Model)