Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML051610101 + (CFR 50.55a Request IR-2-38 Regarding an Alternative Brazed Joint Assessment Methodology)
- ML103620105 + (CFR 50.55a Request ISI-02 and ISI-03: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR50.55a(g)(5)(iii) for the Fourth Interval Inservice Inspection (ISI) Program)
- ML103350217 + (CFR 50.55a Request ISI-04: Request for Use of Alternate Depth Sizing Qualification)
- L-MT-14-037, CFR 50.55a Request No. 009: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fifth Ten-Year Inservice Inspection Interval + (CFR 50.55a Request No. 009: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fifth Ten-Year Inservice Inspection Interval)
- L-MT-07-071, CFR 50.55a Request No. 15: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval + (CFR 50.55a Request No. 15: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval)
- L-MT-10-023, CFR 50.55a Request No. 18: Alternative to Apply ASME Code Case N-705 to the Standby Liquid Control System Tank + (CFR 50.55a Request No. 18: Alternative to Apply ASME Code Case N-705 to the Standby Liquid Control System Tank)
- L-MT-10-033, CFR 50.55a Request No. VR-03: Extension of the Main Steam Safety Relief, Valve Test Interval Through the Next Refueling Outage + (CFR 50.55a Request No. VR-03: Extension of the Main Steam Safety Relief, Valve Test Interval Through the Next Refueling Outage)
- L-PI-25-041, CFR 50.55a Request Nos. 1-RR-5-16 and 2-RR-5-16, Proposed Alternative to Conditions for Applying Code Case N-513-5, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping and Gate + (CFR 50.55a Request Nos. 1-RR-5-16 and 2-RR-5-16, Proposed Alternative to Conditions for Applying Code Case N-513-5, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping and Gate)
- L-20-115, CFR 50.55a Request Number 2-TYP-4-RV-07 for Bottom Mounted Instrumentation Penetration Examinations + (CFR 50.55a Request Number 2-TYP-4-RV-07 for Bottom Mounted Instrumentation Penetration Examinations)
- EPID:L-2020-LLR-0053 + (CFR 50.55a Request Number 2-TYP-4-RV-07 for Bottom Mounted Instrumentation Penetration Examinations)
- L-14-267, CFR 50.55a Request Number BV3-N-789 + (CFR 50.55a Request Number BV3-N-789)
- ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components + (CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components)
- EPID:L-2023-LLR-0026 + (CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components)
- ET 05-0027, CFR 50.55a Request Number I2R-33 Regarding ASME Section XI Requirements for Examination Coverage of the Reactor Pressure Vessel Nozzle-to-Vessel Welds + (CFR 50.55a Request Number I2R-33 Regarding ASME Section XI Requirements for Examination Coverage of the Reactor Pressure Vessel Nozzle-to-Vessel Welds)
- NLS2007019, CFR 50.55a Request Number R1-29, Revision 0 + (CFR 50.55a Request Number R1-29, Revision 0)
- NLS2011097, CFR 50.55a Request Number RI-06, Revision 1 + (CFR 50.55a Request Number RI-06, Revision 1)
- NLS2007074, CFR 50.55a Request Number RI-29, Revision 1 + (CFR 50.55a Request Number RI-29, Revision 1)
- LIC-14-0040, CFR 50.55a Request Number RR-13, Omaha Public Power District Request for Relief from Certain In-service Testing (IST) Requirements + (CFR 50.55a Request Number RR-13, Omaha Public Power District Request for Relief from Certain In-service Testing (IST) Requirements)
- L-20-118, CFR 50.55a Request Number SRR-1, Revision 0, Snubber Testing + (CFR 50.55a Request Number SRR-1, Revision 0, Snubber Testing)
- L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency + (CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency)
- EPID:L-2023-LLR-0066 + (CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency)
- L-20-116, CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency + (CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency)
- L-20-060, CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency + (CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency)
- EPID:L-2020-LLR-0052 + (CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency)
- L-20-114, CFR 50.55a Request Number: VRR5, Revision 0, Relief Valve Test Frequency + (CFR 50.55a Request Number: VRR5, Revision 0, Relief Valve Test Frequency)
- EPID:L-2020-LLR-0049 + (CFR 50.55a Request Number: VRR5, Revision 0, Relief Valve Test Frequency)
- L-22-212, CFR 50.55a Request RP-5 Regarding Inservice Pump Testing + (CFR 50.55a Request RP-5 Regarding Inservice Pump Testing)
- EPID:L-2023-LLR-0008 + (CFR 50.55a Request RP-5 Regarding Inservice Pump Testing)
- L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program + (CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program)
- EPID:L-2023-LLR-0002 + (CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program)
- L-11-091, CFR 50.55a Request RR-A35, Proposed Alternative to System Leakage Test Requirements + (CFR 50.55a Request RR-A35, Proposed Alternative to System Leakage Test Requirements)
- ML060900374 + (CFR 50.55a Request Regarding Inservice Inspection Requirements Third Ten-Year Interval (RR-A29))
- ML051590468 + (CFR 50.55a Request Regarding Inservice Inspection Requirements Third Ten-Year Interval (RR-A28))
- ML071020195 + (CFR 50.55a Request Regarding Installation of Structural Weld Overlays Third Ten-Year Interval (RR-A30))
- L-10-100, CFR 50.55a Request VR-7, One-Time Replacement Frequency Extension + (CFR 50.55a Request VR-7, One-Time Replacement Frequency Extension)
- L-11-321, CFR 50.55a Request for Alternative Examination Requirements for Reactor Vessel Safe-End Welds + (CFR 50.55a Request for Alternative Examination Requirements for Reactor Vessel Safe-End Welds)
- L-11-293, CFR 50.55a Request for Alternative Examination Requirements for ASME Class 1 Piping Welds + (CFR 50.55a Request for Alternative Examination Requirements for ASME Class 1 Piping Welds)
- NL-18-0863, CFR 50.55a Request for Alternative HNP-ISI-ALT-05-04 Implementation of BWRVIP Documents in Lieu of Certain 8-N-1 and 8-N-2 Examinations + (CFR 50.55a Request for Alternative HNP-ISI-ALT-05-04 Implementation of BWRVIP Documents in Lieu of Certain 8-N-1 and 8-N-2 Examinations)
- EPID:L-2018-LLR-0099 + (CFR 50.55a Request for Alternative HNP-ISI-ALT-05-04 Implementation of BWRVIP Documents in Lieu of Certain 8-N-1 and 8-N-2 Examinations)
- L-08-291, CFR 50.55a Request for Alternative Repair Methods for Reactor Vessel Head Penetrations and J-Groove Welds + (CFR 50.55a Request for Alternative Repair Methods for Reactor Vessel Head Penetrations and J-Groove Welds)
- ET 14-0039, CFR 50.55a Request for Alternative to ASME Code Case N-579, Use of Nonstandard Nuts, Class 1, 2, and 3, Mc, CS Components and Supports Construction Section III, Division 1 + (CFR 50.55a Request for Alternative to ASME Code Case N-579, Use of Nonstandard Nuts, Class 1, 2, and 3, Mc, CS Components and Supports Construction Section III, Division 1)
- ET 10-0019, CFR 50.55a Request for Alternative to ASME Code Case N-579, Use of Nonstandard Nuts, Class 1, 2, and 3, Mc, CS Components and Supports Construction Section III, Division 1 + (CFR 50.55a Request for Alternative to ASME Code Case N-579, Use of Nonstandard Nuts, Class 1, 2, and 3, Mc, CS Components and Supports Construction Section III, Division 1)
- L-2005-168, CFR 50.55a Request for Temporary Non-Code Repair Spent Fuel Pool Cooling Line (Request No. 6) + (CFR 50.55a Request for Temporary Non-Code Repair Spent Fuel Pool Cooling Line (Request No. 6))
- NRC 2013-0107, CFR 50.55a Request, Relief Request 1-RR-6, Re-Examination of the Unit 1 Reactor Pressure Vessel Indication on the a Inlet Nozzle Weld Fifth Ten-Year Inservice Inspection Program Interval + (CFR 50.55a Request, Relief Request 1-RR-6, Re-Examination of the Unit 1 Reactor Pressure Vessel Indication on the a Inlet Nozzle Weld Fifth Ten-Year Inservice Inspection Program Interval)
- ML14006A317 + (CFR 50.55a Request, Relief Request 1-RR-6, Re-Examination of the Unit 1 Reactor Pressure Vessel Indication on the a Inlet Nozzle Weld Fifth Ten-Year Inservice Inspection Program Interval)
- NRC 2013-0113, CFR 50.55a Request, Relief Request 2-RR-7, Re-Categorization of Unit 2 Steam Generator Nozzle to Safe-End Welds. Part 3 of 3 + (CFR 50.55a Request, Relief Request 2-RR-7, Re-Categorization of Unit 2 Steam Generator Nozzle to Safe-End Welds. Part 3 of 3)
- ML13365A307 + (CFR 50.55a Request, Relief Request 2-RR-7, Re-Categorization of Unit 2 Steam Generator Nozzle to Safe-End Welds. Part 1 of 3)
- NRC 2008-0017, CFR 50.55a Request, Relief Request RR-21, Examination of the Reactor Pressure Vessels, Fourth Ten-Year Inservice Inspection Program Interval + (CFR 50.55a Request, Relief Request RR-21, Examination of the Reactor Pressure Vessels, Fourth Ten-Year Inservice Inspection Program Interval)
- NRC-2009-0074, CFR 50.55a Request, Relief Request RR-22 for System Leakage Test - Boundaries, Fourth Ten-Year Inservice Inspection Program Interval + (CFR 50.55a Request, Relief Request RR-22 for System Leakage Test - Boundaries, Fourth Ten-Year Inservice Inspection Program Interval)
- NRC 2011-0008, CFR 50.55a Request, Relief Request RR-23 Residual Heat Removal Heat Exchanger - Nozzle Examination Fourth Ten-Year Inservice Inspection Program Interval Response to Request for Additional Information + (CFR 50.55a Request, Relief Request RR-23 Residual Heat Removal Heat Exchanger - Nozzle Examination Fourth Ten-Year Inservice Inspection Program Interval Response to Request for Additional Information)
- NRC 2010-0127, CFR 50.55a Request, Relief Request RR-23 Residual Heat Removal Heat Exchanger - Nozzle Examination Fourth Ten-Year Inservice Inspection Program Interval + (CFR 50.55a Request, Relief Request RR-23 Residual Heat Removal Heat Exchanger - Nozzle Examination Fourth Ten-Year Inservice Inspection Program Interval)
- ML13079A141 + (CFR 50.55a Request, Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval)