Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "BWR Refill Reflood Program Final Report". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20010H007  + (BWR REFILL-REFLOOD Program Task 4.1 - Program Plan)
  • ML19240B981  + (BWR REFILL-REFLOOD Program Task 4.2 - Core Spray Distribution.Final Report)
  • ML19345D249  + (BWR REFILL-REFLOOD Program Task 4.2.Core Spray Distribution Experimental Task Plan)
  • ML19352A295  + (BWR REFILL-REFLOOD Program Task 4.3 - Single Heated Bundle Experimental Task Plan.Stage 3.Separate Effects Bundle)
  • ML20073R945  + (BWR REFILL-REFLOOD Program Task 4.3-SINGLE Heated Bundle Final Rept)
  • ML19350D106  + (BWR REFILL-REFLOOD Program Task 4.3:SINGLE Heated Bundle. Experimental Task Plan)
  • ML20079P885  + (BWR REFILL-REFLOOD Program Task 4.4 - Ccfl/Refill System Effects Tests (30 Degree Sector) Sstf Systems Response Test Reslts)
  • ML20040C635  + (BWR REFILL-REFLOOD Program Task 4.4 - Ccfl/Refill System Effects Tests (30 F Sector) Experimental Task Plan.Addendum C - 30 F Sstf CCFL/Refill,BWR/6 System Response Test Plan)
  • ML20024A148  + (BWR REFILL-REFLOOD Program Task 4.4 - Ccfl/Refill System Effects Tests (30 Degree Sector).Evaluation of ECCS Mixing Phenomena)
  • ML20010H006  + (BWR REFILL-REFLOOD Program Task 4.4 - Ccfl/Refill System Effects Tests (30 Degree Sector) Experimental Task Plan. Addendum B - 30 Degree Sstf Ccfl/Refill Separate Effect Test Plan)
  • ML20040A883  + (BWR REFILL-REFLOOD Program Task 4.4-CCFL/REFILL System Effects Tests (30 F Sector) Experimental Task Plan.Addendum D-SSTF Ccfl/Refill with ECCS Variation Test Plan (BWR/4 ECCS Geometry))
  • ML20069M565  + (BWR REFILL-REFLOOD Program Task 4.4-CCFL/REFILL System Effects Tests (30 Sector):Evaluation of Parallel Channel Phenomena)
  • ML20080R780  + (BWR REFILL-REFLOOD Program Task 4.7 - Model Development TRAC-BWR Component Models)
  • ML20031A273  + (BWR REFILL-REFLOOD Program Task 4.8 - Model Qualification Task Plan)
  • ML20081C316  + (BWR REFILL-REFLOOD Program Task 4.8 - TRAC-BWR Model Qualification for BWR Safety Analysis Final Report)
  • ML20070E071  + (BWR REFILL-REFLOOD Program,Task 4.7-CONSTITUTIVE Correlations for Shear and Heat Transfer for the BWR Version of Trac)
  • ML20054E845  + (BWR REFILL-RELOAD Program Task 4.4 - 30 Sstf Description Document)
  • ML20080R790  + (BWR REFILL-RELOAD Program Task 4.7 - Model Development Basic Models for the BWR Version of Trac)
  • ML20138Q249  + (BWR Reactor Facilities Design & Layout - Students Manual)
  • ML20247H629  + (BWR Reactor Water Cleanup Sys Flexible Wedge Gate Isolation Valve Qualification & High Energy Flow Interruption Test, Interim Analysis & Data Rept, Vols I & Ii,Technical Rept)
  • ML19332C788  + (BWR Reactor Water Cleanup System Flexible Wedge Gate Isolation Valve Qualification and High Energy Flow Interruption Test.Analysis and Conclusions)
  • ML19332C791  + (BWR Reactor Water Cleanup System Flexible Wedge Gate Isolation Valve Qualification and High Energy Flow Interruption Test.Data Report)
  • ML19332C772  + (BWR Reactor Water Cleanup System Flexible Wedge Gate Isolation Valve Qualification and High Energy Flow Interruption Test.Review of Issues Associated with BWR Containment Isolation Valve Closure)
  • ML20005B163  + (BWR Refill - Reflood Program, Progress Rept for May 1981)
  • ML19318B524  + (BWR Refill - Reflood Program, Tenth Monthly Rept May 1980)
  • ML20031E609  + (BWR Refill Reflood Program Task 4.7 - Model Development Task Plan)
  • ML20032E993  + (BWR Refill Reflood Program, 24th Monthly Progress Rept for Aug-Sept 1981)
  • ML20039H137  + (BWR Refill Reflood Program, 25th Informal Monthly Progress Rept for Oct 1981)
  • ML20040C487  + (BWR Refill Reflood Program, Monthly Progress Rept for Nov 1981)
  • ML19323H220  + (BWR Refill-Reflood Program Progress, Monthly Ltr for Apr 1980)
  • ML20052A027  + (BWR Refill-Reflood Program, Informal Monthly Progress Rept for Feb 1982)
  • ML19210D888  + (BWR Refill-Reflood Program, Interim Rept for Oct 1979)
  • ML19323A136  + (BWR Refill-Reflood Program, Monthly Ltr for Feb 1980)
  • ML19347B477  + (BWR Refill-Reflood Program, Monthly Progress Rept for Aug 1980)
  • ML20148Q406  + (BWR Refill-Reflood Program, Monthly Progress Rept for Jul 1980)
  • ML20031G103  + (BWR Refill-Reflood Program, Monthly Progress Rept for June 1981)
  • ML20125C218  + (BWR Refill-Reflood Program, Monthly Progress Rept for Nov 1979)
  • ML19254D536  + (BWR Refill-Reflood Program, Monthly Progress Rept for Sept 1979)
  • ML19341A152  + (BWR Refill-Reflood Program, Monthly Progress Rept for Sept 1980)
  • ML19296C138  + (BWR Refill-Reflood Program, Progress Rept for Dec 1979)
  • ML20002C785  + (BWR Refill-Reflood Program, Sixtieth Monthly Progress Rept for Oct 1980)
  • ML19341B411  + (BWR Refill-Reload Program, Monthly Progress Rept for June 1980)
  • ML20009H187  + (BWR Refill/Reflood Program Task 4.4 - Ccfl/Refill Sys Effects Tests (30 Degree Sector) Experimental Task Plan)
  • ML20011A166  + (BWR Refill/Reflood Program Task 4.4-CCFL/REFILL System Effects Test (30 Degree Sector) Experimental Task Plan. Addendum A-SSTF Ccfl/Refill Shakedown Plan)
  • ML19249D537  + (BWR Refill/Reflood Program, Monthly Ltr Rept for Aug 1979)
  • ML19341A343  + (BWR Refill/Reflood Program, Monthly Progress Rept for Nov 1980)
  • ML072110442  + (BWR Sample Problem Loss of Inventory)
  • ML19338G607  + (BWR Scram Discharge Sys)
  • ML20027A863  + (BWR Scram Discharge Vol Long-Term Mod,Quad Cities Station, Units 1 & 2, Technical Evaluation Rept)
  • ML20244B663  + (BWR Scram Discharge Vol Long-Term Mods, Technical Evaluation Rept)