Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20049A088 + (ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Second Period of the Third 10-Year Inspection Interval)
- EPID:L-2020-LLR-0028 + (ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Second Period of the Third 10-Year Inspection Interval)
- EPID:L-2020-LLR-0027 + (ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Second Period of the Third 10-Year Inspection Interval)
- ML062090375 + (ASME Section XI Inservice Inspection Program Relief Request CMP-007 Regenerative and Residual Heat Exchangers)
- ML042240246 + (ASME Section XI Inservice Inspection Program Reactor Pressure Vessel Weld Examination Relief Requests Revised Relief Requests SR-031 and SR-036)
- ML18212A219 + (ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the First Period of the Fifth 10-Year Inservice Inspection Interval Response to Request for Additional Information)
- ML15216A363 + (ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval)
- ML15216A359 + (ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval)
- ML20268A225 + (ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Third Period of the Fourth 10-Year Inspection Interval)
- EPID:L-2020-LLR-0130 + (ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Third Period of the Fourth 10-Year Inspection Interval)
- DCL-08-103, ASME Section XI Inservice Inspection Program Relief Request NDE-Leak Path for the Unit 1, Fifteenth Refueling Outage, Third Ten-Year Inspection Interval to Allow Use of the Rules of the NRC First Revised Order, EA-03-009 + (ASME Section XI Inservice Inspection Program Relief Request NDE-Leak Path for the Unit 1, Fifteenth Refueling Outage, Third Ten-Year Inspection Interval to Allow Use of the Rules of the NRC First Revised Order, EA-03-009)
- ML12319A278 + (ASME Section XI Inservice Inspection Program Relief Request N1-I4-LMT-001 - Fourth Interval Period 1 Limited Examinations)
- ML091280687 + (ASME Section XI Inservice Inspection Program Proposed Alternative to Code Requirements - SPT-008 Request for Additional Information)
- ML22138A436 + (ASME Section XI Inservice Inspection Program Plan - Fourth 10-Year Inspection Interval, Revision 1)
- DCL-08-040, ASME Section XI Inservice Inspection Program Relief Request NDE-SBR for the Third Ten-Year Interval Inservice Inspection to Allow Use of Alternate Requirements for Snubber Inspection Frequency + (ASME Section XI Inservice Inspection Program Relief Request NDE-SBR for the Third Ten-Year Interval Inservice Inspection to Allow Use of Alternate Requirements for Snubber Inspection Frequency)
- ML13102A034 + (ASME Section XI Inservice Inspection Program Request for Alternative to ASME Code Steam Generator Nozzle-to-Vessel Weld Examination Requirements Alternative Request N2-14-LMT-001)
- ML14202A615 + (ASME Section XI Inservice Inspection Program Request for Alternative REP-SI: Proposed Alternative to Requirements for Repair/Replacement Activities for Certain Safety Injection Pump Welded Attachments)
- ML14202A614 + (ASME Section XI Inservice Inspection Program Request for Alternative REP-SI: Proposed Alternative to Requirements for Repair/Replacement Activities for Certain Safety Injection Pump Welded Attachments)
- ML050180495 + (ASME Section XI Inservice Inspection Program, End of Intervals System Pressure Testing)
- ML22115A175 + (ASME Section XI Inservice Inspection Program - Relief Request N2-14-LMT-004 - Fourth Interval Third Period Limited Examinations - Response to Request for Additional Information)
- ML053470475 + (ASME Section XI Inservice Inspection Program Partial Examination Relief Requests for the Third Ten Year Reactor Vessel Examinations)
- ML20121A119 + (ASME Section XI Inservice Inspection Program Relief Request N1-14-LMT-003, Fourth Interval Third Period Limited Examinations)
- EPID:L-2020-LLR-0071 + (ASME Section XI Inservice Inspection Program Relief Request N1-14-LMT-003, Fourth Interval Third Period Limited Examinations)
- DCL-06-099, ASME Section XI Inservice Inspection Program Relief Requests NDE-SLH U2 and NDE-LSL U2 + (ASME Section XI Inservice Inspection Program Relief Requests NDE-SLH U2 and NDE-LSL U2)
- DCL-10-051, ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R16 to Allow Use of Alternate Sizing Qualification Criteria + (ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R16 to Allow Use of Alternate Sizing Qualification Criteria)
- DCL-07-038, ASME Section XI Inservice Inspection Program Relief Request REP-1 U2 + (ASME Section XI Inservice Inspection Program Relief Request REP-1 U2)
- ML051020102 + (ASME Section XI Inservice Inspection Program Relief Requests)
- DCL-15-086, ASME Section XI Inservice Inspection Program Request for Relief PRS-3 + (ASME Section XI Inservice Inspection Program Request for Relief PRS-3)
- ML020580398 + (ASME Section XI Inservice Inspection Program, Relief Request Partial 1)
- ML051530248 + (ASME Section XI Inservice Inspection Relief Request Main Steam Line Branch Connection Weldolets)
- DCL-17-017, ASME Section XI Inservice Inspection Relief Requests NDE-RPV 10 Year 2R19 + (ASME Section XI Inservice Inspection Relief Requests NDE-RPV 10 Year 2R19)
- ML18234A133 + (ASME Section XI Inservice Program Relief Requests N1-15-CMP-001 and N2-15-CMP-001 Proposed Alternative - Use of Paut in Lieu of RT)
- EPID:L-2018-LLR-0113 + (ASME Section XI Inservice Program Relief Requests N1-15-CMP-001 and N2-15-CMP-001 Proposed Alternative - Use of Paut in Lieu of Rt)
- NRC 2002-0016, ASME Section XI Inservice Testing Program Fourth Interval Relief Requests VRR-1 and PRR-1 + (ASME Section XI Inservice Testing Program Fourth Interval Relief Requests VRR-1 and PRR-1)
- ML19329A285 + (ASME Section XI Inservice Testing Program: Request for Alternative to Requirement of ASME OM Code Relief Request P-9)
- EPID:L-2019-LLR-0106 + (ASME Section XI Inservice Testing Program: Request for Alternative to Requirement of ASME OM Code Relief Request P-9)
- ML020090100 + (ASME Section XI Inservice Testing Program Relief Requests G-1)
- ML20140A239 + (ASME Section XI Inservicee Inspection Program Proposed Inservice Inspection Alternative N1-15-NDE-002)
- EPID:L-2020-LLR-0075 + (ASME Section XI Inservicee Inspection Program Proposed Inservice Inspection Alternative N1-15-NDE-002)
- ML20087M172 + (ASME Section XI Inspervice Inspection Program Proposed Inservice Inspection Alternative N1-15-NDE-004)
- ML20094Q176 + (ASME Section XI Isi/Nde & Augmented Nondestructive Exam Programs, SSP-6.10,rev 2)
- ML20094Q184 + (ASME Section XI Isi/Nde Program Units 1 & 2, Rev 0 to 0-SI-DXI-000-114.2)
- ML18100A277 + (ASME Section XI Non-Mandatory Appendix R Risk-Informed Inspection Requirements for Piping)
- ML20087D624 + (ASME Section XI Pump & Valve Program Inservice Inspection, for Crystal River Unit 3)
- ML060460040 + (ASME Section XI Relief Request Addendum to Specify Process Temperature Monitoring Techniques for Repair and Examination of Unacceptable Indications in Welded Nozzles)
- ML051010196 + (ASME Section XI Relief Request Alternative Acceptance Criteria for Surface Examinations)
- L-2003-063, ASME Section XI Relief Request No. 33, Alternative Requirements for Implementation of Appendix Viii, Supplement 10 + (ASME Section XI Relief Request No. 33, Alternative Requirements for Implementation of Appendix Viii, Supplement 10)
- L-2003-019, ASME Section XI Relief Request Nos. 30 & 31, FPL Response to NRC Comment on Relief Request 30 & 31 + (ASME Section XI Relief Request Nos. 30 & 31, FPL Response to NRC Comment on Relief Request 30 & 31)
- L-2002-087, ASME Section XI Relief Request Nos. 30 & 31, Associated with Reactor Vessel Closure Head Repair, Additional Information + (ASME Section XI Relief Request Nos. 30 & 31, Associated with Reactor Vessel Closure Head Repair, Additional Information)
- ML021640649 + (ASME Section XI Relief Request R17, Revision 1 Response to Request for Additional Information)
- ML17090A110 + (ASME Section XI Relief Request RR-04-25)