Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 50.59 Inspection (Indian Point 2020) + (50.59)
- 50.59 Inspection (Limerick 2020) + (50.59)
- 50.59 Inspection (McGuire 2019) + (50.59)
- 50.59 Inspection (North Anna 2020) + (50.59)
- 50.59 Inspection (Palisades 2019) + (50.59)
- 50.59 Inspection (Palo Verde 2020) + (50.59)
- 50.59 Inspection (Peach Bottom 2019) + (50.59)
- 50.59 Inspection (Perry 2019) + (50.59)
- 50.59 Inspection (Prairie Island 2020) + (50.59)
- 50.59 Inspection (River Bend 2021) + (50.59)
- 50.59 Inspection (Saint Lucie 2021) + (50.59)
- 50.59 Inspection (Saint Lucie 2020) + (50.59)
- 50.59 Inspection (Salem 2021) + (50.59)
- 50.59 Inspection (Seabrook 2021) + (50.59)
- 50.59 Inspection (Sequoyah 2021) + (50.59)
- 50.59 Inspection (Summer 2019) + (50.59)
- 50.59 Inspection (Turkey Point 2021) + (50.59)
- 50.59 Inspection (Waterford 2021) + (50.59)
- 50.59 Inspection (Watts Bar 2021) + (50.59)
- 50.59 Inspection (South Texas 2020) + (50.59)
- 50.59 Inspection (Cook 2020) + (50.59)
- ML18222A218 + (50.59 Analysis for Solar Rev. 0. 06/20/2018 Final)
- L-PI-13-094, 50.59 Evaluation Summary Report + (50.59 Evaluation Summary Report)
- L-PI-09-123, 50.59 Evaluation Summary Report + (50.59 Evaluation Summary Report)
- L-PI-05-105, 50.59 Evaluation Summary Report + (50.59 Evaluation Summary Report)
- ML19086A087 + (50.59 Info Request)
- ML19086A088 + (50.59 Information Request)
- ML20304A284 + (50.59 Inspection 2nd Request for Information)
- ML21267A278 + (50.59 Inspection Information Request)
- ML22010A073 + (50.59 Inspection Information Request)
- ML19108A278 + (50.59 Inspection Information Request and Notification Email)
- LR-N10-0306, 50.59 Review Coversheet Form for Hope Creek Unit 1 DCP 80102144, Revise Dose Analysis Calculations & Update UFSAR to Remove 120 Second Isolation Time for PCIVs + (50.59 Review Coversheet Form for Hope Creek Unit 1 DCP 80102144, Revise Dose Analysis Calculations & Update UFSAR to Remove 120 Second Isolation Time for PCIVs)
- ML061010562 + (50.59 Review, Temporary Configuration Change EC 358522, Addition of Temporary Storage Capacity for the Liquid Radwaste System)
- NL-19-079, 50.59(d)(2) Summary Report of Changes, Tests and Experiments + (50.59(d)(2) Summary Report of Changes, Tests and Experiments)
- 05000410/FIN-2016001-02 + (50.65(a)(4) Risk Evaluation Not Properly Performed Prior to Residual Heat Removal Heat Exchanger Testing)
- ML23087A249 + (50.69 Acceptance Email)
- ML19298C972 + (50.69 Apla SE Input L-2018-LLA-0482)
- ML19072A029 + (50.69 LAR RAIs)
- ML16305A280 + (50.69 Seismic PRA Incorporation)
- ML23270B928 + (50.72 Aug 9 2023 Public Meeting Slides)
- ENS 40205 + (50.72 Non-Emergency - Accident Mitigation)
- ML23184A095 + (50.72 Proposed Rule: Reporting Requirements for Nonemergency Events at Nuclear Power Plants)
- ML23220A236 + (50.72 Rulemaking Update)
- ML23219A138 + (50.72 Rulemaking Update)
- ML18320A250 + (50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting)
- ML20266H793 + (50/70 IR Inlet. Actual Drawing NUMBER:D-SK 5770 716)
- ML20265F308 + (500 Block Main Street Grand Junction Colorado.Sheet 1 of 1)
- ML20265E100 + (500 Block of Main St.Grand Junction,Co.Sheet 1 of 1)
- 05000275/FIN-2008005-01 + (500 Kv Offsite power Source Compliance With General Design Criterion 17)
- ML20054L539 + (500 Kv Switchyard Voltage)
- ML20265D214 + (500 Kv Transmission Line. Sheet 1 of 2)