Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-2005-141, 10 CFR 50.55a Request for Mechanical Clamping Device Used as Piping Pressure Boundary + (10 CFR 50.55a Request for Mechanical Clamping Device Used as Piping Pressure Boundary)
- ML062360200 + (10 CFR 50.55a Request for Relief from ASME Section XI Repair and Replacement Requirements: Proposed Alternatives for Application of Structural Weld Overlays to Pressurizer Nozzle Welds)
- ML062350116 + (10 CFR 50.55a Request for Relief from ASME Section XI Repair and Replacement Requirements: Proposed Alternatives for Application of Structural Weld Overlays to Pressurizer Nozzle Welds)
- NLS2025023, 10 CFR 50.55a Request for Sixth and Seventh Twelve-Year Inservice Inspection Intervals + (10 CFR 50.55a Request for Sixth and Seventh Twelve-Year Inservice Inspection Intervals)
- NL-04-1475, 10 CFR 50.55a Request for an Alternative Alignment of IWE / Iwl Inspection Program Interval with Corresponding Plant ISI Program Intervals + (10 CFR 50.55a Request for an Alternative Alignment of IWE / Iwl Inspection Program Interval with Corresponding Plant ISI Program Intervals)
- L-19-145, 10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval + (10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval)
- EPID:L-2020-LLR-0002 + (10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval)
- L-17-183, 10 CFR 50.55a Request to Apply Alternative Examination Requirements to Certain ASME Section Xl Class 1 Components (Request IR-056. Revision 2) + (10 CFR 50.55a Request to Apply Alternative Examination Requirements to Certain ASME Section Xl Class 1 Components (Request IR-056. Revision 2))
- ET 16-0006, 10 CFR 50.55a Request to Use ASME Code Cade N-789-2 for the Fourth Inservice Inspection Program Interval + (10 CFR 50.55a Request to Use ASME Code Cade N-789-2 for the Fourth Inservice Inspection Program Interval)
- NRC 2012-0088, 10 CFR 50.55a Request, Relief Request 1 -RR-4 Re-Examination of the Unit 1 Reactor Pressure Vessel Indication on the a Lnlet Nozzle Weld Fifth Ten-Year Inservice Inspection Program Interval + (10 CFR 50.55a Request, Relief Request 1 -RR-4 Re-Examination of the Unit 1 Reactor Pressure Vessel Indication on the a Lnlet Nozzle Weld Fifth Ten-Year Inservice Inspection Program Interval)
- NRC 2013-0072, 10 CFR 50.55a Request, Relief Request RR-4L2 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval, Response to Request for Additional Infomation + (10 CFR 50.55a Request, Relief Request RR-4L2 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval, Response to Request for Additional Infomation)
- NRC 2013-0105, 10 CFR 50.55a Request, Relief Request RR-5 Examination of the Pressurizer Surge Nozzle Inner Corner Region Fifth Ten-Year Inservice Inspection Program Interval + (10 CFR 50.55a Request, Relief Request RR-5 Examination of the Pressurizer Surge Nozzle Inner Corner Region Fifth Ten-Year Inservice Inspection Program Interval)
- NRC-2006-0078, 10 CFR 50.55a Request, Resubmittal of Relief Request 15, Fourth Ten-Year Interval Inservice Inspection (ISI) Program + (10 CFR 50.55a Request, Resubmittal of Relief Request 15, Fourth Ten-Year Interval Inservice Inspection (ISI) Program)
- NRC 2015-0034, 10 CFR 50.55a Request, Withdrawal of Relief Request 2-RR-7 Re-Categorization of Steam Generator Nozzle to Safe-End Welds + (10 CFR 50.55a Request, Withdrawal of Relief Request 2-RR-7 Re-Categorization of Steam Generator Nozzle to Safe-End Welds)
- NRC 2013-0073, 10 CFR 50.55a Request. Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval Response to Request for Additional Information + (10 CFR 50.55a Request. Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval Response to Request for Additional Information)
- SBK-L-09193, 10 CFR 50.55a Request: PR-1, Containment Building Spray Pump Testing on Recirculation Flow Path for the Third 10-Year Interval + (10 CFR 50.55a Request: PR-1, Containment Building Spray Pump Testing on Recirculation Flow Path for the Third 10-Year Interval)
- SBK-L-09194, 10 CFR 50.55a Request: PR-2, Increase of Vibration Alert Range Absolute Limit to 3.50 Ips for All Containment Building Spray Pump Bearings for the Third 10-Year Interval + (10 CFR 50.55a Request: PR-2, Increase of Vibration Alert Range Absolute Limit to 3.50 Ips for All Containment Building Spray Pump Bearings for the Third 10-Year Interval)
- ULNRC-06569, 10 CFR 50.55a Request: Proposed Alternative to ASME Section XI Requirement for Containment Tendon Inspection (Relief Request CC-01) + (10 CFR 50.55a Request: Proposed Alternative to ASME Section XI Requirement for Containment Tendon Inspection (Relief Request CC-01))
- ML13123A095 + (10 CFR 50.55a Request: Proposed Alternative to ASME Section XI Requirements for Leakage Testing of Reactor Pressure Vessel Head Flange Leakoff Lines (Relief Request 13R-14))
- L-MT-20-004, 10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval + (10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval)
- EPID:L-2020-LLR-0022 + (10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval)
- L-PI-14-080, 10 CFR 50.55a Requests 1-RR-4-9, 2-RR-4-9 and 2-RR-4-10 Associated with the Fourth Ten-Year Interval for the Inservice Inspection Program + (10 CFR 50.55a Requests 1-RR-4-9, 2-RR-4-9 and 2-RR-4-10 Associated with the Fourth Ten-Year Interval for the Inservice Inspection Program)
- L-PI-14-095, 10 CFR 50.55a Requests 1-RR-5-7 and 2-RR-5-7 Associated with the Fifth Ten-Year Interval for the Inservice Inspection Program + (10 CFR 50.55a Requests 1-RR-5-7 and 2-RR-5-7 Associated with the Fifth Ten-Year Interval for the Inservice Inspection Program)
- B18810, 10 CFR 50.55a Requests Approval for Third Ten Year Interval of in Service Testing Program, Revised V-6 10 CFR 50.55a Request + (10 CFR 50.55a Requests Approval for Third Ten Year Interval of in Service Testing Program, Revised V-6 10 CFR 50.55a Request)
- L-PI-19-002, 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2 + (10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2)
- EPID:L-2019-LLR-0055 + (10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2)
- L-21-259, 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing + (10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing)
- EPID:L-2021-LLR-0096 + (10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing)
- L-13-067, 10 CFR 50.55a Requests RP-1, RP-1A, RP-3, RP-5, RP-6 and RV-1 Regarding Inservice Pump and Valve Testing + (10 CFR 50.55a Requests RP-1, RP-1A, RP-3, RP-5, RP-6 and RV-1 Regarding Inservice Pump and Valve Testing)
- L-PI-14-015, 10 CFR 50.55a Requests RR-01, RR-03. RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Inservice Test Program + (10 CFR 50.55a Requests RR-01, RR-03. RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Inservice Test Program)
- NRC 2014-0022, 10 CFR 50.55a Requests Relief Requests RR-8 and RR-9 Fifth Ten-Year Inservice Inspection Program Interval + (10 CFR 50.55a Requests Relief Requests RR-8 and RR-9 Fifth Ten-Year Inservice Inspection Program Interval)
- L-09-020, 10 CFR 50.55a Requests for Alternative Dissimilar Metal Weld Repair Methods for Reactor Vessel Nozzles, Reactor Coolant Pump Nozzles, and Reactor Coolant Piping + (10 CFR 50.55a Requests for Alternative Dissimilar Metal Weld Repair Methods for Reactor Vessel Nozzles, Reactor Coolant Pump Nozzles, and Reactor Coolant Piping)
- NLS2105025, 10 CFR 50.55a Requests for Fifth Ten-Year Inservice Inspection Interval + (10 CFR 50.55a Requests for Fifth Ten-Year Inservice Inspection Interval)
- NLS2006015, 10 CFR 50.55a Requests for Fourth Ten-Year Inservice Inspection Interval + (10 CFR 50.55a Requests for Fourth Ten-Year Inservice Inspection Interval)
- ULNRC-05271, 10 CFR 50.55a Requests for Relief from ASME Section XI Inservice Inspection Requirements for Third 10-Year Inspection Interval + (10 CFR 50.55a Requests for Relief from ASME Section XI Inservice Inspection Requirements for Third 10-Year Inspection Interval)
- ML24296B190 + (10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program)
- L-10-246, 10 CFR 50.55a Requests in Support of the Third 10-Year In-Service Inspection Interval + (10 CFR 50.55a Requests in Support of the Third 10-Year In-Service Inspection Interval)
- L-18-104, 10 CFR 50.55a Requests in Support of the Fourth 10-Year In-Service Testing Interval + (10 CFR 50.55a Requests in Support of the Fourth 10-Year In-Service Testing Interval)
- EPID:L-2018-LLR-0092 + (10 CFR 50.55a Requests in Support of the Fourth 10-Year In-Service Testing Interval)
- NRC 2007-0020, 10 CFR 50.55a Requests, Relief Requests RR-18, RR-19 and RR-20 Associated with Examination of the Reactor Pressure Vessels Fourth Ten-Year Inservice Inspection Program Interval + (10 CFR 50.55a Requests, Relief Requests RR-18, RR-19 and RR-20 Associated with Examination of the Reactor Pressure Vessels Fourth Ten-Year Inservice Inspection Program Interval)
- L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval + (10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval)
- EPID:L-2024-LLR-0005 + (10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval)
- ULNRC-06034, 10 CFR 50.55a(a)(3) Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fourth 120-Month Inservice Testing Interval + (10 CFR 50.55a(a)(3) Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fourth 120-Month Inservice Testing Interval)
- ML043230554 + (10 CFR 50.55a(a)(3)(i) Request for Alternative to a 10 CFR 50.55a(c) Reactor Coolant Pressure Boundary ASME Section III Code Case 1361-2 Parameter (ISI Relief Request 30))
- ML062760306 + (10 CFR 50.55a(a)(3)(i) Request for Authorization to Utilize Code Case N-513-2; ISI-3-26)
- ULNRC-06160, 10 CFR 50.55a(g)(4)(ii) Inservice Inspection Interval ASME OM Code Dynamic Restraint (Snubbers) Testing Requirements for Fourth 120-Month Inservice Inspection Interval + (10 CFR 50.55a(g)(4)(ii) Inservice Inspection Interval ASME OM Code Dynamic Restraint (Snubbers) Testing Requirements for Fourth 120-Month Inservice Inspection Interval)
- RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record + (10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record)
- EPID:L-2023-LLR-0033 + (10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record)
- L-MT-20-002, 10 CFR 50.55a(z)(1) Request RR-015: Proposed Alternative for Examination of ASME Section XI, Examination Category B-G-1, Item Number B6.40, Threads in Flange + (10 CFR 50.55a(z)(1) Request RR-015: Proposed Alternative for Examination of ASME Section XI, Examination Category B-G-1, Item Number B6.40, Threads in Flange)
- L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 + (10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09)
- EPID:L-2023-LLR-0064 + (10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09)
- L-MT-20-001, 10 CFR 50.55a(z)(1) Request Vr 05: Request for Approval of an Alternative for Pressure Isolation Valve Testing + (10 CFR 50.55a(z)(1) Request Vr 05: Request for Approval of an Alternative for Pressure Isolation Valve Testing)