Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RIS 2017-05, Administration of 10 CFR Part 72 Certificate of Compliance Corrections and Revisions +
- RIS 2016-05, Embedded Digital Devices in Safety-Related Systems +
- RIS 2015-05, Withdrawn NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations +
- RIS 2013-05, NRC Position in the Relationship Between General Design Criteria and Technical Specification Operability +
- RIS 2010-05, Applicability of 10 CFR Part 21 Requirements to Applicants for Standard Design Certifications +
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) The Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium In Situ Recovery ... +
- RIS 2008-05, Updated NRC Regulatory Issue Summary 2008-05, Revision 1: Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal +
- RIS 2005-05, Regulatory Issues Regarding Criticality Analyses for Spent Fuel Pools and Independent Spent Fuel Storage Installations +
- RIS 2004-05, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power +
- RIS 2001-05, Guidance On Submitting Documents To The NRC By Electronic Information Exchange Or On Cd Rom +
- RIS 2000-05, Resolution of Generic Safety Issue 165, Spring-Actuated Safety and Relief Valve Reliability +
- RIS 2001-05, Guidance on Submitting Documents to the NRC by Electronic Information Exchange or on Cd Rom +
- RIS 2018-05, Supplier Oversight Issues Identified During Recent NRC Vendor Inspections +
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) the Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium in Situ Recovery . +
- RIS 2007-05, Status and Plans for Implementation of NRC Regulatory Authority for Certain Naturally-Occurring and Accelerator-Produced Radioactive Material +
- RIS 2006-05, Withdrawal of Transportation Safeguards Advisories SA-01-01 Rev 1 and SA-03-02 +
- RIS 2003-05, Issuance of Orders Imposing Additional Physical Protection Measures for Independent Spent Fuel Storage Installations Using Dry Storage +
- RIS 2002-05, NRC Approval of Boiling Water Reactor Pressure Vessel Integrated Surveillance Program +
- RIS 2014-05, Withdrawn NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations +