Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RIS 1999-04, Sources of Information Previously Published in the AEOD Annual Report +
- RIS 2016-04, Clarification of 10 CFR 50.46 Reporting Requirements and Recent Issues Identified with Guidance Not Approved for Use +
- RIS 2015-04, Withdrawal of Administrative Letter 93-01 +
- RIS 2014-04, National Source Tracking System Long-Term Storage Indicator +
- RIS 2013-04, Content Specification And Shielding Evaluations For Type B Transportation Packages +
- RIS 2012-04, Notice of Revision to the Criteria for Identifying Materials Licensees for Discussion at the Agency Action Review Meeting +
- RIS 2010-04, Monitoring the Status of Regulated Activities During a Pandemic +
- RIS 2008-04, Discontinuation of Two Performance Indicators Associated with the Security Reactor Oversight Process +
- RIS 2004-04, Use of Code Cases N-588, N-640, and N-641 in Developing Pressure-Temperature Operating Limits +
- RIS 2003-04, Withdrawn NRC Regulatory Issue Summary 2003-004 Use of Effective Dose Equivalent in Place of Deep Dose Equivalent in Dose Assessments +
- RIS 2002-04, Results of the Pilot Test of the Proposed Changes to The Unplanned Scrams Performance Indicatolr and Thescrams with Loss of Normal Heat Removal Performance Indicator +
- RIS 2001-04, Issuance of Updated Guidance on the Transfer of Ownership or Control of Licensed Activities (NUREG-1556, Vol. 15) +
- RIS 2000-04, Withdrawn NRC Regulatory Issue Summary 2000-004: Operating Reactor Licensing Action Estimates +
- RIS 1999-04, SOURCES OF INFORMATION PREVIOUSLY PUBLISHED IN THE AEOD ANNUAL REPORT +
- RIS 2017-04, Clarification on the Implementation of Compensatory Measures for Protective Strategy Deficiencies or Degraded or Inoperable Security Systems, Equipment, or Components +
- RIS 2013-04, Content Specification and Shielding Evaluations for Type B Transportation Packages +
- RIS 2002-04, Results of the Pilot Test of the Proposed Changes to the Unplanned Scrams Performance Indicatolr and Thescrams with Loss of Normal Heat Removal Performance Indicator +
- RIS 2006-04, Draft RAI on Meteorology for Full-Scope AST Application +
- RIS 2011-04, Withdrawn NRC Regulatory Issue Summary 2011-004 Preparation and Scheduling of Operator Licensing Examinations +
- RIS 2009-04, Steam Generator Tube Inspection Requirements +
- RIS 2007-04, PII Submitted to the NRC +
- RIS 2025-04, Interactions Between the NRC and the NRC Stakeholders During a Lapse of Agency Appropriations +