Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16124A778 +
- ML13329A858 +
- ML11174A282 +
- ML102780323 +
- ML101370689 +
- ML101370392 +
- ML091400677 +
- ML082550270 +
- ML18194A587 +
- ML18194A622 +
- ML061770277 +
- ML060190072 +
- ML18334A137 +
- ML18334A130 +
- ML19329E887 +
- RS-11-137, Supplemental Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate +
- ML003778114 +
- ML18227D920 +
- ML20042E830 +
- ML20087D624 +
- ML20078B798 +
- ML20135E410 +
- ML20135B012 +
- ML20140E659 +
- ML20140E502 +
- ML20135E396 +
- ML20204F167 +
- ML20311A550 +
- ML20246A340 +
- ML20236N268 +
- ML20216H063 +
- ML20309A607 +
- ML20215A152 +
- ML21118B036 +
- ST-HL-AE-2128, Forwards Portion of Bechtel Engineering Corp Calculation EC-5000,voltage Regulation Study Per FSAR Question 430.20N & SER (NUREG-0781),Section 8.3.1,Page 8-6 +
- ML20211M545 +
- ML20054A570 +
- ML20085M515 +
- ML20023C116 +
- ML20024E430 +
- ML19276E737 +
- ML19210E111 +
- ML19211A050 +
- ML19171A057 +
- RS-18-142, Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended +
- ML18037A499 +
- IR 05000410/1989012 +
- SBK-L-09118, Attachment 5, WCAP-17071-NP, H: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F), Non-Proprietary +
- RS-09-071, WCAP-17072-NP, Revision 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model D5), Attachment 9 +
- ML052990145 +