Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 10 CFR 2.702, Subpoenas + (Subpoenas)
- 10 CFR 13.23, Subpoenas for Attendance At Hearing + (Subpoenas for attendance at hearing)
- EPID:L-2022-SLR-0000 + (Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2)
- EPID:L-2018-TOP-0019 + (Subsequent License Renewal Application Safety Review Request for Additional Information (RAI) Set 5 Response 4.3.5-2 Revision)
- EPID:L-2020-SLR-0002 + (Subsequent License Renewal Application on Aging Management - Request for Additional Information (Rai), Set 4 Response)
- 10 CFR 26.187, Substance Abuse Expert + (Substance abuse expert)
- EPID:L-2020-DSR-0000 + (Subsurface Soil FSS Dose)
- 10 CFR 39.45, Subsurface Tracer Studies + (Subsurface tracer studies)
- Sudha Hebbar + (Sudha Hebbar)
- Sue Abreu + (Sue Abreu)
- Sue Bogle + (Sue Bogle)
- 10 CFR 14.57 + (Suit against United States exclusive remedy)
- 10 CFR 26.419, Suitability and Fitness Evaluations + (Suitability and fitness evaluations)
- 10 CFR 26.63, Suitable Inquiry + (Suitable inquiry)
- Sujata Goetz + (Sujata Goetz)
- Sujit Samaddar + (Sujit Samaddar)
- Sulfur + (Sulfer)
- Suman Subhash + (Suman Subhash)
- EPID:L-2022-LRM-0083 + (Summary - Tn Topical Report - Closed Meeting)
- 10 CFR 2.1205, Summary Disposition + (Summary disposition)
- EPID:L-2018-LLO-0003 + (Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate)
- EPID:L-2020-LLR-0159 + (Summary of 10-15-20 Public Meeting with Southern Nuclear Operating Company)
- EPID:L-2018-LRO-0022 + (Summary of 7/17/2018 Public Meeting in Forked River, Nj, to Receive Public Comments on Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate)
- EPID:L-2023-LRM-0027 + (Summary of April 26, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned License Amendment Request Related to Turbine Control System and Reactor Protection System Circuitry)
- EPID:L-2021-LRM-0037 + (Summary of April 8, 2021, Teleconference with Entergy Operations, Inc. to Discuss Forthcoming LAR Concerning Reactor Coolant System Primary Activity and Primary-to-Secondary Leak Rate)
- NRC Generic Letter 80-38, Summary of Certain Non-Power Reactor Physical Protection Requirements + (Summary of Certain Non-Power Reactor Physical Protection Requirements)
- EPID:L-2018-TOP-0026 + (Summary of Closed Meeting Meeting Westinghouse Electric Company to Discuss Future Submittal of WCAP-18240-P, Westinghouse Thermal Design Procedure (Wtdp))
- EPID:L-2023-LRM-0104 + (Summary of December 11, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned Exemption Request Related to Turbine Control System and Reactor Protection System Circuitry)
- EPID:L-2021-LRM-0119 + (Summary of December 13, 2021 Meeting with LES to Discuss Exemption for DN30 Package)
- EPID:L-2022-LLA-0093 + (Summary of December 13, 2022 Meeting with Framatome)
- EPID:L-2018-LRM-0081 + (Summary of December 4, 2018, Public Meeting with DTE Electric Company)
- EPID:L-2022-LRM-0086 + (Summary of December 8, 2022, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Proposed License Amendment Request to Revise TS 3.7.11 Control Room Area Chilled Water System (Cracws))
- EPID:L-2021-NEW-0009 + (Summary of February 10, 2022, Meeting with NNSA-Partial Rsis for the HI-STAR Pbt Package)
- EPID:L-2025-LRM-0018 + (Summary of February 19, 2025, Meeting with Constellation Energy Generation, LLC Regarding Plan to Submit Emergency Plan Amendment at Three Mile Island Nuclear Station, Unit 1)
- EPID:L-2023-LRM-0110 + (Summary of January 17, 2024, Partially Closed Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for the Entergy Fleet Regarding Implementation of an Online Monitoring Methodology)
- EPID:L-2020-LRM-0003 + (Summary of January 27, 2020, Public Meeting with Tennessee Valley Authority Regarding the Future Submittal of Steam Generator Tube Inspection Related License Amendment Request)
- EPID:L-2023-LLA-0090 + (Summary of July 31, 2023 Meeting for the Model No. Brr Package)
- EPID:L-2019-LRM-0040 + (Summary of July 9, 2019 Public Meeting with Industrial Nuclear Company, Inc to Discuss the Model No. IR-100ST)
- EPID:L-2023-LRM-0035 + (Summary of June 1, 2023, Pre-Application Teleconference with Nebraska Public Power District to Discuss Relief Request for Drywell Inspections Performed During Refueling Outage 32)
- EPID:L-2017-LNE-0007 + (Summary of June 7, 2018, Meeting with U.S. Department of Energy to Discuss the Proposed Responses to the Request for Additional Information Regarding the Renewal of the Three Mile Island Unit 2 ISFSI)
- EPID:L-2023-LRM-0015 + (Summary of March 28, 2023, Presubmittal Meeting with Vistra Operations Company LLC to Discuss Proposed LAR to Take Exception to RG 1.81, Rev. 1, Shared Emergency and Shutdown Electric Systems for Multi-Unit Nuclear Power Plants,)
- EPID:L-2023-LRM-0013 + (Summary of March 7, 2023, Meeting with Nextera Energy Seabrook, LLC Regarding Planned Submittal of License Amendment Request to Revise Emergency Action Level Due to Modification to Containment Fire Detection Equipment)
- EPID:L-2022-LLA-0137 + (Summary of May 2, 2023, Meeting Duke Energy to Discuss an H. B. Robinson Steam Electric Plant, Unit No. 2 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High)
- EPID:L-2022-LRM-0035 + (Summary of May 3, 2022, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for ANO, Units 1 & 2 Regarding Proposed Revision to Emergency Plan and On-Shift Staff Analysis)
- NRC Generic Letter 79-55, Summary of Meeting Held on October 12, 1979 to Discuss Responses to IE Bulletins 79-05C and 79-06C and HPI Termination Criteria + (Summary of Meeting Held on October 12, 1979 to Discuss Responses to IE Bulletins 79-05C and 79-06C and HPI Termination Criteria)
- EPID:L-2022-PMP-0005 + (Summary of Meeting on January 24, 2024, with TRISO-X LLC)
- EPID:L-2021-LRM-0104 + (Summary of Meeting with Arizona Public Service Company to Discuss Relief Request No. 68 for Certain ASME Code Piping for Palo Verde Nuclear Generating Station, Units 1, 2, and 3)
- NRC Generic Letter 79-49, Summary of Meetings Held on 9/18-20/79 to Discuss Potential Unreviewed Safety Question on Systems Interaction for B&W Pl + (Summary of Meetings Held on 9/18-20/79 to Discuss Potential Unreviewed Safety Question on Systems Interaction for B&W Pl)
- NRC Generic Letter 80-41, Summary of Meetings Held on April 22 & 23, 1980 with Representatives of the Mark I Owners Group + (Summary of Meetings Held on April 22 & 23, 1980 with Representatives of the Mark I Owners Group)
- EPID:L-2018-TOP-0031 + (Summary of November 21, 2019, Closed Meeting on Hf Controls Amendment 4 Open Items)
- EPID:L-2022-LRM-0088 + (Summary of November 21, 2022, Presubmittal Meeting with Florida Power and Light on St. Lucie License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components)