Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2022-SPR-0009 + (Submittal of Revision 2 to the Standard Practice and Procedures Plan (Sppp) for Global Laser Enrichment LLC (Gle) Approval Requested)
- EPID:L-2018-LLA-0110 + (Submittal of Revision 26 to the Updated Final Safety Analysis Report)
- EPID:L-2022-LLR-0059 + (Submittal of Sixth Inservice Inspection Interval Relief Request I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements)
- EPID:L-2017-LRM-0044 + (Submittal of Slides for SNC Non-Public Meeting on November 14, 2017)
- EPID:L-2019-LLE-0009 + (Submittal of Spent Fuel Management Plan)
- EPID:L-2018-LRO-0033 + (Submittal of Steam Generator Tube Inspection Report)
- EPID:L-2019-LLA-0238 + (Submittal of Supplement to Nac'S Request for a Revision to Certificate of Compliance No. 9356 for the NAC Magnatran Transportation Package)
- EPID:L-2022-LLR-0056 + (Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10)
- EPID:L-2022-LLR-0042 + (Submittal of Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual)
- EPID:L-2019-LLR-0048 + (Submittal of Valve Relief Requests for the Inservice Testing Program Fourth 10-Year Interval)
- EPID:L-2024-LLA-0158 + (Submittal of an Amendment Request for the NAC International Magnastor Cask System Amendment No. 14)
- EPID:L-2019-LLR-0026 + (Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Fourth Ten-year Interval)
- EPID:L-2025-LLR-0005 + (Submittal of the Inservice Testing Program Alternative Requests and Relief Requests for Pumps and Valves - Sixth Ten-Year Interval)
- EPID:L-2019-LLR-0016 + (Submittal of the Snubber Program Relief Request RR-S1 for the Fourth 10-Year Interval)
- EPID:L-2019-LRO-0067 + (Submittal to NRC Vessels & Internals Integrity Branch of Plant-Specific Evaluation of the Core Support Barrel Spring 2018 Inspection Results)
- 10 CFR 2.2, Subparts + (Subparts)
- 10 CFR 4.2, Subparts + (Subparts)
- 10 CFR 51.2, Subparts + (Subparts)
- 10 CFR 2.702, Subpoenas + (Subpoenas)
- 10 CFR 13.23, Subpoenas for Attendance At Hearing + (Subpoenas for attendance at hearing)
- EPID:L-2022-SLR-0000 + (Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2)
- EPID:L-2018-TOP-0019 + (Subsequent License Renewal Application Safety Review Request for Additional Information (RAI) Set 5 Response 4.3.5-2 Revision)
- EPID:L-2020-SLR-0002 + (Subsequent License Renewal Application on Aging Management - Request for Additional Information (Rai), Set 4 Response)
- 10 CFR 26.187, Substance Abuse Expert + (Substance abuse expert)
- EPID:L-2020-DSR-0000 + (Subsurface Soil FSS Dose)
- 10 CFR 39.45, Subsurface Tracer Studies + (Subsurface tracer studies)
- Sudha Hebbar + (Sudha Hebbar)
- Sue Abreu + (Sue Abreu)
- Sue Bogle + (Sue Bogle)
- 10 CFR 14.57 + (Suit against United States exclusive remedy)
- 10 CFR 26.419, Suitability and Fitness Evaluations + (Suitability and fitness evaluations)
- 10 CFR 26.63, Suitable Inquiry + (Suitable inquiry)
- Sujata Goetz + (Sujata Goetz)
- Sujit Samaddar + (Sujit Samaddar)
- Sulfur + (Sulfer)
- Suman Subhash + (Suman Subhash)
- EPID:L-2022-LRM-0083 + (Summary - Tn Topical Report - Closed Meeting)
- 10 CFR 2.1205, Summary Disposition + (Summary disposition)
- EPID:L-2018-LLO-0003 + (Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate)
- EPID:L-2020-LLR-0159 + (Summary of 10-15-20 Public Meeting with Southern Nuclear Operating Company)
- EPID:L-2018-LRO-0022 + (Summary of 7/17/2018 Public Meeting in Forked River, Nj, to Receive Public Comments on Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate)
- EPID:L-2023-LRM-0027 + (Summary of April 26, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned License Amendment Request Related to Turbine Control System and Reactor Protection System Circuitry)
- EPID:L-2021-LRM-0037 + (Summary of April 8, 2021, Teleconference with Entergy Operations, Inc. to Discuss Forthcoming LAR Concerning Reactor Coolant System Primary Activity and Primary-to-Secondary Leak Rate)
- NRC Generic Letter 80-38, Summary of Certain Non-Power Reactor Physical Protection Requirements + (Summary of Certain Non-Power Reactor Physical Protection Requirements)
- EPID:L-2018-TOP-0026 + (Summary of Closed Meeting Meeting Westinghouse Electric Company to Discuss Future Submittal of WCAP-18240-P, Westinghouse Thermal Design Procedure (Wtdp))
- EPID:L-2023-LRM-0104 + (Summary of December 11, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned Exemption Request Related to Turbine Control System and Reactor Protection System Circuitry)
- EPID:L-2021-LRM-0119 + (Summary of December 13, 2021 Meeting with LES to Discuss Exemption for DN30 Package)
- EPID:L-2022-LLA-0093 + (Summary of December 13, 2022 Meeting with Framatome)
- EPID:L-2018-LRM-0081 + (Summary of December 4, 2018, Public Meeting with DTE Electric Company)
- EPID:L-2022-LRM-0086 + (Summary of December 8, 2022, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Proposed License Amendment Request to Revise TS 3.7.11 Control Room Area Chilled Water System (Cracws))
- EPID:L-2021-NEW-0009 + (Summary of February 10, 2022, Meeting with NNSA-Partial Rsis for the HI-STAR Pbt Package)