Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Name" with value "Submittal of Revision 26 to the Updated Final Safety Analysis Report". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • EPID:L-2019-LLR-0028  + (Submittal of Relief Request (19-ON-001) to Utilize Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress)
  • EPID:L-2021-LLR-0085  + (Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations)
  • EPID:L-2022-LLR-0066  + (Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations)
  • EPID:L-2020-LLR-0135  + (Submittal of Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements)
  • EPID:L-2020-LLR-0099  + (Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements)
  • EPID:L-2018-LLR-0053  + (Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval)
  • EPID:L-2018-LLA-0571  + (Submittal of Relief Request RR-18-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements)
  • EPID:L-2023-LLR-0042  + (Submittal of Relief Request RR-A25 for Extended License Period)
  • EPID:L-2020-LLR-0072  + (Submittal of Relief Request RR-A42 for Inservice Inspection Impracticality During the Third Ten-Year Inservi?E Inspection Interval)
  • EPID:L-2024-LLR-0037  + (Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements)
  • EPID:L-2020-LLR-0000  + (Submittal of Relief Request for Revision to RV-03 Associated with Fifth Inservice Testing Interval)
  • EPID:L-2022-LLR-0017  + (Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval)
  • EPID:L-2018-LLR-0391  + (Submittal of Relief Requests Associated with the Fifth Inservice Inspection (ISI) Interval)
  • EPID:L-2018-LLR-0088  + (Submittal of Relief Requests Associated with the Fifth and Fourth Lnservice Inspection Intervals)
  • EPID:L-2020-RNW-0009  + (Submittal of Renewal Application for the TN-32 Dry Storage Cask - CoC 1021)
  • EPID:L-2023-LLE-0048  + (Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55)
  • EPID:L-2023-LLE-0022  + (Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements)
  • EPID:L-2018-JLD-0153  + (Submittal of Request for Extension of Seismic Probabilistic Risk Assessment)
  • EPID:L-2017-LLA-0397  + (Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material)
  • EPID:L-2017-LLR-0155  + (Submittal of Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces: Attachment 1, Relief Request)
  • EPID:L-2017-LLR-0131  + (Submittal of Revised October 2016 Discharge Monitoring Report)
  • EPID:L-2017-LLR-0137  + (Submittal of Revised October 2016 Discharge Monitoring Report)
  • EPID:L-2020-LLR-0161  + (Submittal of Revised Relief Request RR-A39 for the Fourth Ten-Year Inservice Inspection Interval)
  • EPID:L-2019-LLR-0098  + (Submittal of Revised Valve Relief Request VRR-004 for the Inservice Testing Program Fourth 10-Year Interval)
  • EPID:L-2022-SPR-0009  + (Submittal of Revision 2 to the Standard Practice and Procedures Plan (Sppp) for Global Laser Enrichment LLC (Gle) Approval Requested)