Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Name" with value "Revise the 1.4 Examples to Match the CEOG Standard". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • TSTF-522  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • CAC:MF7436  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • TAC:MF2806  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • TAC:MF3243  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • TAC:MF4110  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • TAC:MF3242  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • TAC:MF0477  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • TAC:MF0460  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • TAC:ME9906  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • CAC:MF6608  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • TAC:MF5504  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • CAC:MF5331  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • CAC:MF9818  + (Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month)
  • TSTF-038  + (Revise Visual Surveillance of Batteries to Specify Inspection is for Performance Degradation)
  • TSTF-426  + (Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C)
  • CAC:ME9555  + (Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C)
  • TAC:MF7061  + (Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C)
  • CAC:MF9932  + (Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C)
  • TAC:ME0136  + (Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C)
  • TAC:MF4471  + (Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C)
  • TAC:MF3154  + (Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C)
  • TAC:MF4631  + (Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C)
  • TSTF-301  + (Revise the 1 Hour Completion Time for Administrative Check of RCIC Operability)
  • TSTF-031  + (Revise the 1.3 Examples to Match the BWR Standard)
  • TSTF-050  + (Revise the 1.3 Examples to Match the CEOG Standard)
  • TSTF-049  + (Revise the 1.4 Examples to Match the CEOG Standard)
  • TSTF-026  + (Revise the Action for Minimum Temperature for Criticality to Match the Applicability)
  • TSTF-025  + (Revise the Actions Terminology Regarding Qptr to Match the Actions Being Taken)
  • TSTF-291  + (Revise the Applicability for the Intermediate Range Neutron Flux Specification)
  • TSTF-293  + (Revise the Bases of the Source Range Neutron Flux Spec to Correctly Describe Required Actions)
  • TSTF-092  + (Revise the Containment Purge and Exhaust SR to Exempt Valves That Are Locked, Sealed or Secured)
  • TSTF-010  + (Revise the Control Rod Lcos Applicability from Mode 2 to Mode 2 with Keff>= 1.0)
  • TSTF-268  + (Revise the Frequency of SR 3. 7.5.5, Afw/Efw Flow Path Verification)
  • TSTF-565  + (Revise the LCO 3.0.2 and LCO 3.0.3 Bases)
  • TSTF-165  + (Revise the LCO 3.0.5 Bases to Refer to Testing and Not SRS)
  • TSTF-600  + (Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency)
  • TSTF-008  + (Revise the SR 3.0.1 Bases to Allow Credit for Unplanned Events to Meet Any Surveillance)
  • TSTF-042  + (Revise the Wording of SR 3.0.2 to Be Consistent with the Other Nuregs)
  • NRC Generic Letter 97-02, Revised Contents of the Monthly Operating Report  + (Revised Contents of the Monthly Operating Report)
  • NRC Generic Letter 78-37, Revised Meeting Schedule & Locations for Upgraded Guard Qualifications  + (Revised Meeting Schedule & Locations for Upgraded Guard Qualifications)
  • EPID:L-2018-JLD-0015  + (Revised Mitigating Strategies Assessment for Flooding Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
  • EPID:L-2021-LLR-0000  + (Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping)
  • EPID:L-2024-LLL-0006  + (Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules)
  • EPID:L-2024-LLL-0002  + (Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules)
  • NRC Generic Letter 81-36, Revised Schedule for Completion of TMI Action Plan Item II.D.1, Relief and Safety Valve Testing  + (Revised Schedule for Completion of TMI Action Plan Item II.D.1, Relief and Safety Valve Testing)
  • EPID:L-2021-LRO-0031  + (Revised Transcript for Public Meeting Held on July 29, 2021, in Tarrytown, Ny, Regarding Indian Point Energy Center Post-Shutdown Decommissioning Activities Report)
  • TSTF-504  + (Revised the MSIV and Mfiv Specifications to Provide Actions for Actuator Trains)
  • EPID:L-2023-LRO-0051  + (Revision 22 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description)
  • EPID:L-2019-LRO-0013  + (Revision 32 to Updated Safety Analysis Report, Chapter 4, Reactor, Public)
  • EPID:L-2021-LLA-0173  + (Revision 35 to Updated Safety Analysis Report, Cover Letter and Information on Enclosures)
  • EPID:L-2021-LLA-0206  + (Revision No 72 of Certificate of Compliance No 9225 for the Model No NAC-LWT Transportation Package)