Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Name" with value "Request for Additional Information License Amendment Request 18-04 Csa". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • EPID:L2020  + (Request for Additional Information Regarding Steam Generator Tube Inspection Reports (EPIDs L2020-LRO-0055, L-2020-LRO-0082, and L2020-LRO-0083))
  • EPID:L-2017-TOP-0067  + (Request for Additional Information Regarding Topical Report ANP-10346P, Revision 0, ATWS-I Analysis Methodology for BWRs Using RAMONA5-FA)
  • EPID:L-2023-LRO-0058  + (Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports)
  • EPID:L-2018-LLA-0139  + (Request for Additional Information for License Amendment Request for Global Nuclear Fuel-Americas (Enterprise Project Identification L-2018-LLA-0139))
  • EPID:L-2017-TOP-0064  + (Request for Additional Information for Westinghouse Electric Company Topical Report WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate Method for Subcritical Reactivity Measurement)
  • NRC Generic Letter 80-15, Request for Additional Management and Technical Resources Information  + (Request for Additional Management and Technical Resources Information)
  • EPID:L-2021-LLA-0204  + (Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Waste)
  • EPID:L-2017-LLR-0126  + (Request for Alternative (VEGP 3 & 4-PSI/ISI-ALT-9))
  • EPID:L-2021-LLR-0049  + (Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval)
  • EPID:L-2018-LLR-0126  + (Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2))
  • EPID:L-2022-LLR-0079  + (Request for Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds)
  • EPID:L-2021-LLR-0041  + (Request for Alternative Requirements for ASME Section III Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16))
  • EPID:L-2021-LLR-0004  + (Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals)
  • EPID:L-2023-LLR-0028  + (Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037))
  • EPID:L-2018-LLR-0027  + (Request for Alternative from Volumetric/Surface Examination Frequency Requirement of ASME Code Case N-729-4, Request Number Isir 04-5, Revision 1)
  • EPID:L-2018-LLR-0388  + (Request for Alternative in Accordance with 10 CFR 50.55a(g)(5)(iii) Proposed Alternative to CFR 50.55a Examination Requirements for Third Interval Volumetric Exams (RBS-ISI-021))
  • EPID:L-2018-LLR-0042  + (Request for Alternative in Accordance with 10 CFR 50.55a (g)(5)(iii) Proposed Alternative to 10 CFR 50.55a Examination Requirements for Pressure Retaining Welds in Control Rod Housings (RR-RBS-ISI-016))
  • EPID:L-2019-LLR-0119  + (Request for Alternative in Accordance with 10 CFR 50.55a (z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period)
  • EPID:L-2020-LLR-0150  + (Request for Alternative to 10 CFR 50.55a(g)(6)(ii)(D) Examination Requirements - Relief Request ANO2-ISI-022)
  • EPID:L-2020-LLR-0036  + (Request for Alternative to Defect Removal Prior to Performing Repair/Replacement Activities on Low Pressure Service Water (LPSW) System Piping)
  • EPID:L-2024-LLA-0081  + (Request for Alternative to Extend First Containment Inservice Inspection Interval)
  • EPID:L-2024-LLR-0081  + (Request for Alternative to Extend First Containment Inservice Inspection Interval)
  • EPID:L-2021-LLR-0019  + (Request for Alternative, 21-ISI-1 Alternative Repair and Examination for Mid Canopy Seal Weld Replacement)
  • EPID:L-2021-LLR-0059  + (Request for Alternative, 21-ISI-2, Alternative Inspection for Upper Head Injection J-groove Welds)
  • EPID:L-2022-LLR-0008  + (Request for Alternative, BFN-21-ISI-02, Alternative to American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section XI, Paragraph IWB-2420(b) and the Use of Case N-526)