Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2020-LLQ-0004 + (Proposed Revision to Operating Quality Assurance Manual (Rev. 34b))
- EPID:L-2022-LLL-0009 + (Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Support Relocation of Capsules 104 and 284)
- EPID:L-2019-LLL-0017 + (Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule)
- EPID:L-2019-LRO-0051 + (Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule)
- EPID:L-2024-LLN-0003 + (Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI)
- NRC Generic Letter 84-15, Proposed Staff Actions to Improve and Maintain Diesel Generator Reliability + (Proposed Staff Actions to Improve and Maintain Diesel Generator Reliability)
- EPID:L-2018-LLA-0048 + (Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Information)
- EPID:L-2019-LLA-0262 + (Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1)
- EPID:L-2019-LLA-0079 + (Proposed Technical Specifications Change - Administrative Controls for Permanently Defueled Condition)
- EPID:L-2024-LLR-0024 + (Proposed Use of a Subsequent ASME Code Edition and Addenda)
- 10 CFR 2.712, Proposed Findings and Conclusions + (Proposed findings and conclusions)
- EPID:L-2019-DSR-0003 + (Proprietary Document Affidavit for 50.83 Partial Site Release)
- 10 CFR 51.16, Proprietary Information + (Proprietary information)
- 10 CFR 171.17, Proration + (Proration)
- Prosanta Chowdhury + (Prosanta Chowdhury)
- Protactinium + (Protactinium)
- NRC Generic Letter 89-20, Protected Area Long-Term Housekeeping + (Protected Area Long-Term Housekeeping)
- 10 CFR 95.25, Protection of National Security Information and Restricted Data In Storage + (Protection of National Security Information and Restricted Data in storage)
- 10 CFR 71.11, Protection of Safeguards Information + (Protection of Safeguards Information)
- IP 71130.06, Protection of Safeguards Information + (Protection of Safeguards Information)
- 10 CFR 73.23, Protection of Safeguards Information-Modified Handling: Specific Requirements + (Protection of Safeguards Information-Modified Handling: Specific Requirements)
- 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements + (Protection of Safeguards Information: Performance Requirements)
- 10 CFR 73.22, Protection of Safeguards Information: Specific Requirements + (Protection of Safeguards Information: Specific Requirements)
- 10 CFR 73.54, Protection of Digital Computer and Communication Systems and Networks + (Protection of digital computer and communication systems and networks)
- 10 CFR 61.43, Protection of Individuals During Operations + (Protection of individuals during operations)
- 10 CFR 61.42, Protection of Individuals From Inadvertent Intrusion + (Protection of individuals from inadvertent intrusion)
- 10 CFR 26.37, Protection of Information + (Protection of information)
- 10 CFR 26.411, Protection of Information + (Protection of information)
- 10 CFR 37.31, Protection of Information + (Protection of information)
- 10 CFR 2.903, Protection of Restricted Data and National Security Information + (Protection of restricted data and national security information)
- 10 CFR 61.41, Protection of the General Population From Releases of Radioactivity + (Protection of the general population from releases of radioactivity)
- 10 CFR 95.27, Protection While In Use + (Protection while in use)
- EPID:L-2023-LLR-0061 + (Protective Measures Coordinator Checklist)
- Protective Strategy Evaluation Inspection (Browns Ferry 2019) + (Protective Strategy Evaluation)
- Protective Strategy Evaluation Inspection (Columbia 2019) + (Protective Strategy Evaluation)
- Protective Strategy Evaluation Inspection (Comanche Peak 2021) + (Protective Strategy Evaluation)
- Protective Strategy Evaluation Inspection (Cook 2020) + (Protective Strategy Evaluation)
- Protective Strategy Evaluation Inspection (Davis Besse 2019) + (Protective Strategy Evaluation)
- Protective Strategy Evaluation Inspection (Diablo Canyon 2020) + (Protective Strategy Evaluation)
- Protective Strategy Evaluation Inspection (Grand Gulf 2019) + (Protective Strategy Evaluation)
- Protective Strategy Evaluation Inspection (Harris 2020) + (Protective Strategy Evaluation)
- Protective Strategy Evaluation Inspection (Palo Verde 2020) + (Protective Strategy Evaluation)
- Protective Strategy Evaluation Inspection (River Bend 2020) + (Protective Strategy Evaluation)
- Protective Strategy Evaluation Inspection (Surry 2019) + (Protective Strategy Evaluation)
- Protective Strategy Evaluation Inspection (Turkey Point 2019) + (Protective Strategy Evaluation)
- Protective Strategy Evaluation Inspection (Wolf Creek 2019) + (Protective Strategy Evaluation)
- Protective Strategy and Target Set Review Inspection (Millstone 2019) + (Protective Strategy and Target Set Review)
- 10 CFR 13.24, Protective Order + (Protective order)
- 10 CFR 95.31, Protective Personnel + (Protective personnel)
- TSTF-412 + (Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable)
- CAC:MG0016 + (Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable)
- TAC:ME6360 + (Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable)
- CAC:MG0237 + (Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable)