Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 10 CFR 2.1208, Process and Schedule for a Hearing Consisting of Written Presentations + (Process and schedule for a hearing consisting of written presentations)
- 10 CFR 2.1207, Process and Schedule for Submissions and Presentations In an Oral Hearing + (Process and schedule for submissions and presentations in an oral hearing)
- 10 CFR 74.53, Process Monitoring + (Process monitoring)
- 10 CFR 25.19 + (Processing applications)
- 10 CFR 95.17, Processing Facility Clearance + (Processing facility clearance)
- 10 CFR 9.43, Processing of Requests for a Waiver Or Reduction of Fees + (Processing of requests for a waiver or reduction of fees)
- Management Directive Volume 11, Procurement + (Procurement)
- 10 CFR 50 Appendix B Criterion IV, Procurement Document Control + (Procurement Document Control)
- 10 CFR 21.31 + (Procurement Documents)
- 10 CFR 71.109, Procurement Document Control + (Procurement document control)
- 10 CFR 72.148, Procurement Document Control + (Procurement document control)
- 10 CFR 51.105, Public Hearings In Proceedings for Issuance of Construction Permits Or Early Site Permits; Limited Work Authorizations + (Production and Utilization Facilities)
- 10 CFR 2.707, Production of Documents and Things; Entry Upon Land for Inspections and Other Purposes + (Production of documents and things; entry upon land for inspections and other purposes)
- 10 CFR 9.200, Scope of Subpart + (Production or Disclosure in Response to Subpoenas or Demands of Courts or Other Authorities)
- 10 CFR 9.201, Production Or Disclosure Prohibited Unless Approved by Appropriate Nrc Official + (Production or disclosure prohibited unless approved by appropriate NRC official)
- 10 CFR 26.21, Fitness-For-Duty Program + (Program Elements)
- 10 CFR 1.42, Office of Nuclear Material Safety and Safeguards + (Program Offices)
- 10 CFR 4.549, Program Accessibility: Discrimination Prohibited + (Program accessibility: Discrimination prohibited)
- 10 CFR 4.550, Program Accessibility: Existing Facilities + (Program accessibility: Existing facilities)
- 10 CFR 4.551, Program Accessibility: New Construction and Alterations + (Program accessibility: New construction and alterations)
- Programmatic Oversight and Regional Support Branch + (Programmatic Oversight and Regional Support Branch)
- 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications + (Prohibited by Technical Specifications)
- 10 CFR 4.335, Prohibition Against Intimidation Or Retaliation + (Prohibition against intimidation or retaliation)
- 10 CFR 2.111, Prohibition of Sex Discrimination + (Prohibition of sex discrimination)
- 10 CFR 73.24, Prohibitions + (Prohibitions)
- Reactor Projects Region 1 Branch 5 + (Projects Branch 5)
- Promethium + (Promethium)
- 10 CFR 140.15, Proof of Financial Protection + (Proof of financial protection)
- EPID:L-2025-LLR-0048 + (Propoosed Inservice Alternative FNP-ISI-ALT-05-13 for Reactor Vessel Bottom Head Inspection)
- 10 CFR 51.88, Proposals for Legislation + (Legislative Environmental Impact Statements--Proposals for Legislation)
- EPID:L-2021-LLA-0192 + (Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation)
- EPID:L-2023-LLR-0004 + (Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspections (Relief Request RR-ENG-4-06))
- EPID:L-2017-LLR-0142 + (Proposed Alternative - Relief Request Number RR 5-6, Alternative to the Reexamination Frequency for a Relevant Condition - Foreign Material in Reactor Vessel)
- EPID:L-2025-LLA-0002 + (Proposed Alternative ANO1-ISI-24-02 and ANO2-ISI-24-02 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds)
- EPID:L-2022-LLR-0085 + (Proposed Alternative Associated with a Weld Overlay Repair to the Torus)
- EPID:L-2021-LLR-0153 + (Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting)
- EPID:L-2021-LLR-0080 + (Proposed Alternative Concerning Pressure Testing of ASME Section XI Class 2 Portions of the Auxiliary Feedwater System)
- EPID:L-2018-LLR-0070 + (Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure)
- EPID:L-2017-LLR-0075 + (Proposed Alternative RR-V-11 Regarding Main Steam Safety Relief Valve Testing Requirements)
- EPID:L-2018-LLR-0054 + (Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing)
- EPID:L-2019-LLR-0014 + (Proposed Alternative Request IR-3-39, Alternative to ASME Code, Section XI, IWA-4221(C), to Permit Two Fillet Welds Not in Compliance with the Construction Code to Remain in Service)
- EPID:L-2019-LLR-0033 + (Proposed Alternative Request IR-4-01 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography)
- EPID:L-2018-LLR-0078 + (Proposed Alternative Request P-06 for 'C' Charging Pump Test)
- EPID:L-2019-LLR-0120 + (Proposed Alternative Request RR-05-05, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements)
- EPID:L-2024-LLR-0035 + (Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements)
- EPID:L-2018-LLR-0084 + (Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination)
- EPID:L-2019-LLR-0054 + (Proposed Alternative Request for Reactor Vessel Inspections to Meet Code Requirements for Two ISI Intervals)
- EPID:L-2019-LLR-0031 + (Proposed Alternative Requests RR-05-01 and RR-05-02 for the Fifth 10-Year Inservice Inspection Interval)
- EPID:L-2020-LLR-0158 + (Proposed Alternative Requests RR-05-04 and IR-4-02, Use of Alternative Pressure/Flow Testing Requirements for Service Water System Supply Piping)
- EPID:L-2018-LLR-0060 + (Proposed Alternative Requests S1-15-ISl-04 and S2-15-ISl-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55a(z)(1))
- EPID:L-2018-LLR-0131 + (Proposed Alternative Requirements for the Repair and Examination of Reactor Pressure Vessel Head Penetration Nozzles for the Fourth Lnservice Inspection Interval in Accordance with 10 CFR 50.55a(z)(1))