Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2020-LRM-0089 + (Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a)
- EPID:L-2024-LRM-0102 + (Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program)
- EPID:L-2020-LRM-0002 + (Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation)
- 10 CFR 26.65, Pre-Access Drug and Alcohol Testing + (Pre-access drug and alcohol testing)
- 10 CFR 5.545, Pre-Employment Inquiries + (Pre-employment inquiries)
- 10 CFR 2.1010, Pre-License Application Presiding Officer + (Pre-license application presiding officer)
- EPID:L-2023-LRM-0080 + (Pre-planning Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Integrated Technical Specification Conversion, 24-Month Fuel Cycle and Revise Safety Release Valve Setpoint to 1130 Psig)
- EPID:L-2022-LRM-0110 + (Pre-submittal Meeting - Request for Alternative to ASME OM Code ISTC-3630 - PIV Leakage (L-2022-LRM-0010))
- EPID:L-2020-LRM-0047 + (Pre-submittal Meeting for Inservice Testing (IST) Program Request for Relief from Increased Frequency Testing of Residual Heat Removal (RHR) Pump 1B-B Meeting Slides)
- EPID:L-2021-LRM-0038 + (Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves)
- EPID:L-2024-LLA-0013 + (Pre-submittal Meeting with Holtec for Palisades Nuclear Plant Power Operations Technical Specifications (Presentation))
- EPID:L-2023-LRM-0033 + (Pre-submittal Meeting with PSEG to Discuss the Amendment to Reduce Sites Exclusion Area Boundary)
- EPID:L-2020-LRM-0098 + (Pre-submittal Teleconference Regarding Proposed Licensing Approach to Install the General Electric Numac Wide Range Neutron Monitoring System for Hope Creek Generating Station)
- 10 CFR 63.15, Site Characterization + (Licenses)
- 10 CFR 20.1901 + (Precautionary Procedures)
- 10 CFR 63.111, Performance Objectives for the Geologic Repository Operations Area Through Permanent Closure + (Preclosure Performance Objectives)
- 10 CFR 63.201, Purpose and Scope + (Preclosure Public Health and Environmental Standards)
- 10 CFR 63.112, Requirements for Preclosure Safety Analysis of the Geologic Repository Operations Area + (Preclosure Safety Analysis)
- 10 CFR 60.136, Preclosure Controlled Area + (Preclosure Controlled Area)
- 10 CFR 63.204, Preclosure Standard + (Preclosure standard)
- TSTF-406 + (Predicting END-OF-CYCLE Mtc and Deleting Need for END-OF-CYCLE Mtc Verifiation (NPSD-911-A))
- CAC:MF7269 + (Predicting END-OF-CYCLE Mtc and Deleting Need for END-OF-CYCLE Mtc Verifiation (NPSD-911-A))
- TAC:MF3143 + (Predicting END-OF-CYCLE Mtc and Deleting Need for END-OF-CYCLE Mtc Verifiation (NPSD-911-A))
- 10 CFR 9.28, Predisclosure Notification Procedures for Information Containing Trade Secrets Or Confidential Commercial Or Financial Information + (Predisclosure notification procedures for information containing trade secrets or confidential commercial or financial information)
- 10 CFR 4.125, Preemployment Inquiries + (Preemployment inquiries)
- 10 CFR 5.305, Preference In Admission + (Preference in admission)
- 10 CFR 2.329, Prehearing Conference + (Prehearing conference)
- 10 CFR 2.1404, Prehearing Conference + (Prehearing conference)
- 10 CFR 13.19, Prehearing Conferences + (Prehearing conferences)
- 10 CFR 10.27, Prehearing Proceedings + (Prehearing proceedings)
- NRC Generic Letter 80-80, Preliminary Clarification of TMI Action Plan Requirements + (Preliminary Clarification of TMI Action Plan Requirements)
- NRC Generic Letter 80-81, Preliminary Clarification of TMI Action Plan Requirements - Addendum to 9/5/80 Letter + (Preliminary Clarification of TMI Action Plan Requirements - Addendum to 9/5/80 Letter)
- 10 CFR 51.20, Criteria for and Identification of Licensing and Regulatory Actions Requiring Environmental Impact Statements + (Preliminary Procedures)
- 10 CFR 71.85, Preliminary Determinations + (Preliminary determinations)
- Prema Chandrathil + (Prema Chandrathil)
- 10 CFR 51.34, Preparation of Finding of No Significant Impact + (Preparation of finding of no significant impact)
- 10 CFR 26.93, Preparing for Alcohol Testing + (Preparing for alcohol testing)
- 10 CFR 26.105, Preparing for Urine Collection + (Preparing for urine collection)
- 10 CFR 26.89, Preparing to Collect Specimens for Testing + (Preparing to collect specimens for testing)
- 10 CFR 26.117, Preparing Urine Specimens for Storage and Shipping + (Preparing urine specimens for storage and shipping)
- 10 CFR 37.75, Preplanning and Coordination of Shipment of Category 1 Or Category 2 Quantities of Radioactive Material + (Preplanning and coordination of shipment of category 1 or category 2 quantities of radioactive material)
- 10 CFR 13.6, Prerequisities for Issuing a Complaint + (Prerequisities for issuing a complaint)
- 10 CFR 19.14 + (Presence of representatives of licensees and regulated entities, and workers during inspections)
- EPID:L-2020-LLA-0164 + (Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020)
- EPID:L-2022-LRM-0048 + (Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis)
- EPID:L-2021-LRM-0099 + (Presentation Information for Second Pre-Application Meeting Regarding Use of Framatome Fuel at Callaway Plant)
- EPID:L-2022-LRM-0013 + (Presentation Information for Third Pre-Application Meeting Regarding Use of Framatome Fuel)
- EPID:L-2019-LRM-0004 + (Presentation Material for 1/22/19 Pre-Submittal Meeting Fillet Weld Preheat Alternative Request)
- EPID:L-2018-LRM-0063 + (Presentation Material for the Measurement Uncertainty Recovery and Spent Fuel Pool Criticality Analysis Pre-Submittal Meeting)
- EPID:L-2020-LRM-0048 + (Presentation Slides - Technical Justification for the Ghent Version 2 Probe Qualification and Probability of Detection - May 26, 2020 (Non-Proprietary Version))
- EPID:L-2019-LRM-0038 + (Presentation Slides for 9/12/19 Public Meeting)
- EPID:L-2023-LLR-0017 + (Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative)