Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Plant Support Branch-1 (Region IV) + (Plant Support Branch-1)
- Plant Systems Branch + (Plant Systems Branch)
- 10 CFR 76.68, Plant Changes + (Plant changes)
- EPID:L-2018-LLA-0273 + (Plant, Units 1 and 2 -Proprietary Request for Additional Information)
- Platinum + (Platinum)
- Plum Brook + (Plum Brook)
- Plutonium + (Plutonium)
- Point Beach + (Point Beach)
- Point Lepreau + (Point Lepreau)
- 10 CFR 7.1, Policy + (Policy)
- 10 CFR 10.4, Policy + (Policy)
- 10 CFR 11.5, Policy + (Policy)
- 10 CFR 81.11, Policy + (Policy)
- NRC Generic Letter 86-04, Policy Statement On Engineering Expertise on Shift + (Policy Statement On Engineering Expertise on Shift)
- NRC Generic Letter 87-15, Policy Statement on Deferred Plants + (Policy Statement on Deferred Plants)
- Policy and Oversight Branch + (Policy and Oversight Branch)
- Polonium + (Polonium)
- Poojah Ganesh + (Poojah Ganesh)
- 10 CFR 36.63, Pool Water Purity + (Pool water purity)
- EPID:L-2023-LLE-0085 + (Portland General Electric Company - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation)
- Portsmouth Gaseous Diffusion Plant + (Portsmouth)
- 10 CFR 35.60, Possession, Use, and Calibration of Instruments Used to Measure the Activity of Unsealed Byproduct Material + (General Technical Requirements)
- EPID:L-2020-LLM-0003 + (Post Shutdown Decommissioning Activities Report Including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant)
- NRC Generic Letter 80-90, Post TMI Requirements, NUREG-0737 + (Post TMI Requirements, NUREG-0737)
- 10 CFR 76.70, Post Issuance + (Post issuance)
- 10 CFR 4.75, Post Termination Proceedings + (Post termination proceedings)
- EPID:L-2019-LRL-0004 + (Post-Shutdown Decommissioning Activities Report)
- EPID:L-2020-DPS-0000 + (Post-Shutdown Decommissioning Activities Report)
- EPID:L-2018-LLE-0004 + (Post-Shutdown Decommissioning Activities Report)
- NRC Generic Letter 82-10, Post-TMI Requirements + (Post-TMI Requirements)
- NRC Generic Letter 82-05, Post-TMI Requirements + (Post-TMI Requirements)
- NRC Generic Letter 81-10, Post-TMI Requirements for the Emergency Operations Facility + (Post-TMI Requirements for the Emergency Operations Facility)
- 10 CFR 61.29, Post-Closure Observation and Maintenance + (Post-closure observation and maintenance)
- 10 CFR 13.36, Post-Hearing Briefs + (Post-hearing briefs)
- 10 CFR 63.311, Individual Protection Standard After Permanent Closure + (Postclosure Individual Protection Standard)
- 10 CFR 63.114, Requirements for Performance Assessment + (Postclosure Performance Assessment)
- 10 CFR 63.113, Performance Objectives for the Geologic Repository After Permanent Closure + (Postclosure Performance Objectives)
- 10 CFR 63.301, Purpose and Scope + (Postclosure Public Health and Environmental Standards)
- 10 CFR 51.95, Postconstruction Environmental Impact Statements + (Final Environmental Impact Statements-Production and Utilization Facilities)
- 10 CFR 51.53, Postconstruction Environmental Reports + (Postconstruction environmental reports)
- 10 CFR 34.53 + (Posting)
- 10 CFR 73.75, Posting + (Posting)
- 10 CFR 160.6, Posting + (Posting)
- 10 CFR 19.11 + (Posting of notices to workers)
- 10 CFR 21.6 + (Posting requirements)
- 10 CFR 20.1902 + (Posting requirements)
- Potassium + (Potassium)
- NRC Generic Letter 04-02 + (Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactor)
- NRC Generic Letter 86-13, Potential Inconsistency Between Plant Safety Analyses and Technical Specifications + (Potential Inconsistency Between Plant Safety Analyses and Technical Specifications)
- NRC Generic Letter 79-42, Potential Unreviewed Question on Interaction Between Non-Safety Grade Systems and Safety Grade Systems + (Potential Unreviewed Question on Interaction Between Non-Safety Grade Systems and Safety Grade Systems)
- NRC Generic Letter 98-04, Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-Coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material in Containment + (Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-of-Coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material in Containment)
- NRC Generic Letter 89-22, Potential for Increased Roof Loads and Plant Area Flood Runoff Depth Due to Recent Change in Probable Maximum Precipitation Criteria Developed by the National Weather Service + (Potential for Increased Roof Loads and Plant Area Flood Runoff Depth Due to Recent Change in Probable Maximum Precipitation Criteria Developed by the National Weather Service)
- NRC Generic Letter 85-22, Potential for Loss of Post-LOCA Recirculation Capability Due to Insulation Debris Blockage + (Potential for Loss of Post-LOCA Recirculation Capability Due to Insulation Debris Blockage)