Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Pickering + (Pickering)
- Piedmont Hospital + (Piedmont Hospital)
- Pierre Bowery + (Pierre Bowery)
- Pierre Saverot + (Pierre Saverot)
- Pilgrim + (Pilgrim)
- Pilgrim Watch + (Pilgrim Watch)
- NRC Generic Letter 88-09, Pilot Testing of Fundamentals Examination + (Pilot Testing of Fundamentals Examination)
- NRC Generic Letter 89-05, Pilot Testing of the Fundamentals Examination + (Pilot Testing of the Fundamentals Examination)
- NRC Generic Letter 79-14, Pipe Crack Study Group – Enclosing NUREG-0531 and Notice + (Pipe Crack Study Group – Enclosing NUREG-0531 and Notice)
- NRC Bulletin 79-02, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts + (Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts)
- Piping Plover + (Piping Plover)
- Piping and NDE Branch + (Piping and NDE Branch)
- EPID:L-2020-LLE-0016 + (Planned Actions Re Requirements for Work Hour Controls During Coronavirus Disease 2019 (COVID-19) Public Health Emergency)
- NRC Generic Letter 89-17, Planned Administrative Changes to the NRC Operator Licensing Written Examination Process + (Planned Administrative Changes to the NRC Operator Licensing Written Examination Process)
- 10 CFR 20.1206 + (Planned special exposures)
- Plant Licensing Branch I + (Plant Licensing Branch 1)
- Plant Licensing Branch II + (Plant Licensing Branch II)
- Plant Licensing Branch III + (Plant Licensing Branch III)
- NRC/NRR/ADRO/DORL + (Plant Licensing Branch III-2)
- Plant Licensing Branch IV + (Plant Licensing Branch IV)
- NRC Generic Letter 88-18, Plant Record Storage on Optical Disks + (Plant Record Storage on Optical Disks)
- EPID:L-2017-LLA-0428 + (Plant Shutdown Required by Technical Specifications due to Inoperable Steam Flow Transmitters, LER 16-007-01 for Joseph M. Farley, Unit 1, Regarding Plant Shutdown Required by Technical Specifications due to Inoperable Steam Flow Transmitters)
- Plant Support Branch 1 + (Plant Support Branch 1)
- NRC/RGN-III/DRS/PSB + (Plant Support Branch II)
- Plant Support Branch Region IV + (Plant Support Branch Region IV)
- Plant Support Branch-1 (Region IV) + (Plant Support Branch-1)
- Plant Systems Branch + (Plant Systems Branch)
- 10 CFR 76.68, Plant Changes + (Plant changes)
- EPID:L-2018-LLA-0273 + (Plant, Units 1 and 2 -Proprietary Request for Additional Information)
- Platinum + (Platinum)
- Plum Brook + (Plum Brook)
- Plutonium + (Plutonium)
- Point Beach + (Point Beach)
- Point Lepreau + (Point Lepreau)
- 10 CFR 7.1, Policy + (Policy)
- 10 CFR 10.4, Policy + (Policy)
- 10 CFR 11.5, Policy + (Policy)
- 10 CFR 81.11, Policy + (Policy)
- NRC Generic Letter 86-04, Policy Statement On Engineering Expertise on Shift + (Policy Statement On Engineering Expertise on Shift)
- NRC Generic Letter 87-15, Policy Statement on Deferred Plants + (Policy Statement on Deferred Plants)
- Policy and Oversight Branch + (Policy and Oversight Branch)
- Polonium + (Polonium)
- Poojah Ganesh + (Poojah Ganesh)
- 10 CFR 36.63, Pool Water Purity + (Pool water purity)
- EPID:L-2023-LLE-0085 + (Portland General Electric Company - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation)
- Portsmouth Gaseous Diffusion Plant + (Portsmouth)
- 10 CFR 35.60, Possession, Use, and Calibration of Instruments Used to Measure the Activity of Unsealed Byproduct Material + (General Technical Requirements)
- EPID:L-2020-LLM-0003 + (Post Shutdown Decommissioning Activities Report Including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant)
- NRC Generic Letter 80-90, Post TMI Requirements, NUREG-0737 + (Post TMI Requirements, NUREG-0737)
- 10 CFR 76.70, Post Issuance + (Post issuance)
- 10 CFR 4.75, Post Termination Proceedings + (Post termination proceedings)