Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2018-RNW-0026 + (Package: Revision No. 5 of Certificate of Compliance No. 9226 for the Model No. GA-4 Package)
- EPID:L-2018-LLA-0024 + (Package: Revision No. 6 Certificate of Compliance No. 9289, for the Model No. WE-1 Transportation Package)
- EPID:L-2019-RNW-0007 + (Package: Revision No. 7 of Certificate of Compliance No. 9289, for the Model No. WE-1 Transportation Package)
- EPID:L-2018-LLA-0026 + (Package: Revision No. 9 of Certificate of Compliance No. 9319, for the Model Nos. MAP-12 and MAP-13 Transportation Packages)
- EPID:L-2018-LLA-0113 + (Package: Revision No. 9 of Certificate of Compliance No. 9314 for the Model No. 976 Series Transportation Packages)
- EPID:L-2018-LLA-0023 + (Package: Revision No. 9 of Certificate of Compliance No. 9252 for the Model No. 51032-2 Transportation Package)
- EPID:L-2017-LLA-0059 + (Package: Second Request for Additional Information for the Review of the Model No. HI-STAR Atb 1T Package)
- EPID:L-2019-LRM-0051 + (Package: Summary of August 20, 2019 Meeting with Holtec International)
- EPID:L-2018-LRM-0090 + (Package: Summary of December 17, 2018 Public Meeting with General Electric Hitachi to Discuss Shipping Accident Tolerant Fuel in the Model No. 2000 Package)
- EPID:L-2018-LRM-0005 + (Package: Summary of February 8, 2018, Public Meeting with DAHER-TLI)
- EPID:L-2018-LLA-0001 + (Package: Summary of January 23, 2018, Meeting with Holtec International)
- EPID:L-2019-LRM-0029 + (Package: Summary of July 30, 2019 Meeting with Tn Americas LLC)
- EPID:L-2019-LRM-0039 + (Package: Summary of July 30, 2019 Public Meeting with Robatel Technologies, LLC to Discuss a New Type B Non-Fissile Package)
- EPID:L-2018-LRM-0134 + (Package: Summary of June 19, 2018, Public Meeting with Industrial Nuclear Company to Discuss the Planned Payloads and to Present Testing Results for the New Ten Hole Source Changer Package)
- EPID:L-2019-LRM-0028 + (Package: Summary of June 5, 2019 Public Meeting with Global Nuclear Fuels to Discuss Amending the Model No. New Powder Container Certificate of Compliance)
- EPID:L-2019-LRM-0006 + (Package: Summary of March 19, 2019, Meeting with Holtec International)
- EPID:L-2018-LLA-0284 + (Package: Summary of October 29, 2018, Public Meeting with Tn Americas LLC to Discuss Pre-Application of Amendment No. 2 to Nuhoms Eos Spent Fuel Storage Systems)
- EPID:L-2017-LLA-0028 + (Package: User Need for Rulemaking for the Holtec Hi-Storm 100 Cask System, Amendment No. 12)
- EPID:L-2018-LLA-0157 + (Package:Certificate of Compliance No. 9328, Revision No. 7, for the Model No. TN-55 Transportation Package)
- Paducah Gaseous Diffusion Plant + (Paducah Gaseous Diffusion Plant)
- Paige Rosado + (Paige Rosado)
- Palisades + (Palisades)
- Palladium + (Palladium)
- Palo Verde + (Palo Verde)
- Paluel + (Paluel)
- Pam Wong + (Pam Wong)
- Pamela Baker + (Pamela Baker)
- Pamela Bush + (Pamela Bush)
- Pamela Davis-Ghavami + (Pamela Davis-Ghavami)
- Pamela Kruger + (Pamela Kruger)
- Pamela Lee + (Pamela Lee)
- Pamela Longmire + (Pamela Longmire)
- Pamela Menefee-Buzdygon + (Pamela Menefee-Buzdygon)
- Pamela Noto + (Pamela Noto)
- Pamela Shea + (Pamela Shea)
- 10 CFR 1.13, Advisory Committee On Reactor Safeguards + (Panels, Boards, and Committees)
- Paragon Energy Solutions + (Paragon Energy Solutions)
- AMETEK + (AMETEK)
- Parker Hannifin + (Parker Hannifin)
- Parr + (Parr)
- EPID:L-2020-LLA-0052 + (Part 10 - Quality Assurance Program Description (Rev. 4) - Part 10 - Quality Assurance Program Description)
- EPID:L-2020-LLA-0080 + (Part 21 Notification Re Failure Analysis Concluded That Overvoltage Conditions Caused Overheating and the Subsequent Failures of Starter Coils Contained in Spectrum Technologies Buckets)
- EPID:L-2020-LLE-0065 + (Part 55 Exemption Request for Power Reactors (COVID-19) (Redacted))
- EPID:L-2020-LLE-0066 + (Part 55 Exemption Request for Power Reactors (COVID-19) (Redacted))
- EPID:L-2018-FPR-0000 + (Partial Acceptance of Urenco USA Annual Update to Decommissioning Funding Plan with Safety Evaluation Report Enclosed)
- EPID:L-2019-LLE-0028 + (Partial Exemption from Record Retention Requirements of 10 CFR 50.71(c), 10 CFR 50.59(d)(3), and 10 CFR 50 Appendix B)
- 10 CFR 2.606, Partial Decision On Site Suitability Issues In Construction Permit Proceeding + (Partial decision on site suitability issues in construction permit proceeding)
- 10 CFR 2.1321, Participation and Schedule for Submission In a Hearing Consisting of Written Comments + (Participation and schedule for submission in a hearing consisting of written comments)
- 10 CFR 2.1322, Participation and Schedule for Submissions In an Oral Hearing + (Participation and schedule for submissions in an oral hearing)
- 10 CFR 63.61, Provision of Information + (Participation by State Government, Affected Units of Local Government, and Affected Indian Tribes)