Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2020-LRM-0042 + (NRC Slides Final WBN-1 TS 3.3.3 LAR)
- NRC Generic Letter 83-32, NRC Staff Recommendations Regarding Operator Action for Reactor Trip and ATWS + (NRC Staff Recommendations Regarding Operator Action for Reactor Trip and ATWS)
- NRC Generic Letter 89-23, NRC Staff Responses to Questions Pertaining to Implementation of 10 CFR Part 26 + (NRC Staff Responses to Questions Pertaining to Implementation of 10 CFR Part 26)
- NRC Generic Letter 79-23, NRC Staff Review of Responses to I&E Bulletin 79-08 + (NRC Staff Review of Responses to I&E Bulletin 79-08)
- NRC Generic Letter 79-19, NRC Staff Review of Responses to I&E Bulletins 79-06 and 79-06a + (NRC Staff Review of Responses to I&E Bulletins 79-06 and 79-06a)
- NRC Generic Letter 83-18, NRC Staff Review of the BWR Owners' Group (BWROG) Control Room Survey Program + (NRC Staff Review of the BWR Owners' Group (BWROG) Control Room Survey Program)
- EPID:L-2019-LRM-0044 + (NRC Staff Slides for 11/21/19 Public Meeting with Holtec International - Nrc'S Topical Report Review Process)
- EPID:L-2021-LRM-0027 + (NRC Staff Slides: Feb 23, 2021 Pre-submission Meeting for San Onofre Nuclear Generating Station (SONGS))
- NRC Generic Letter 95-01, NRC Staff Technical Position on Fire Protection for Fuel Cycle Facilities + (NRC Staff Technical Position on Fire Protection for Fuel Cycle Facilities)
- NRC Generic Letter 84-01, NRC Use Of The Terms "Important To Safety" and "Safety Related" + (NRC Use Of The Terms "Important To Safety" and "Safety Related")
- NRC Generic Letter 81-39, NRC Volume Reduction Policy + (NRC Volume Reduction Policy)
- NRC Generic Letter 92-05, NRC Workshop on the Systematic Assessment of Licensee Performance (SALP) Program + (NRC Workshop on the Systematic Assessment of Licensee Performance (SALP) Program)
- 10 CFR 51.104, Nrc Proceeding Using Public Hearings; Consideration of Environmental Impact Statement + (NRC proceeding using public hearings; consideration of environmental impact statement)
- 10 CFR 2.810, Nrc Size Standards + (NRC size standards)
- 10 CFR 9.68, Nrc Statement of Explanation + (NRC statement of explanation)
- 10 CFR 81.10, Authority + (NRC-Owned Inventions--Patents and Applications)
- EPID:L-2019-LLA-0200 + (NRR E-mail Capture - (External_Sender) Action - Request for Comments on the Proposed Issuance of Amendments to Technical Specifications for Fermi 2 Nuclear Power Plant)
- EPID:L-2025-LLA-0028 + (NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise TS SRs 3.8.1.2 and 3.8.1.5 for Diesel Generator Loading License Amendment Request (LAR) (L-2025-LLA-0028))
- EPID:L-2023-LLA-0092 + (NRR E-mail Capture - (External_Sender) Fermi 2 - Request for Additional Information for License Amendment Request Regarding Risk-Informed ECCS Strainer Performance Evaluation (DRAFT)(L-2023-LLA-0092))
- EPID:L-2019-LRM-0019 + (NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods)
- EPID:L-2021-LLA-0016 + (NRR E-mail Capture - (External_Sender) IEMA Response: State Consultation - LaSalle 1 and 2: License Amendment Request Re; Revision of Technical Specifications to Incorporate GNF CRDA Methodology)
- EPID:L-2019-LLR-0094 + (NRR E-mail Capture - (External_Sender) Regarding 09/16/2019 IPEC Weekly Sturgeon Monitoring Report)
- EPID:L-2019-LLA-0141 + (NRR E-mail Capture - (External_Sender) Request for State Comments - Regarding Proposed Amendment to Revise the Catawba, Unit 1, Technical Specification (TS) 3.4.3, RCS Pressure and Temperature (P/T) Limits - State Response)
- EPID:L-2019-LLA-0191 + (NRR E-mail Capture - (External_Sender) State Notification of Amendments to Catawba Nuclear Station, Units 1 & 2: Revise TS 3.0.5)
- EPID:L-2018-LLR-0121 + (NRR E-mail Capture - (External_Sender) VCS Relief Request)
- NRC Generic Letter 80-01, NUREG-0630 "Cladding, Swelling and Rupture - Models for LOCA Analysis" + (NUREG-0630 "Cladding, Swelling and Rupture - Models for LOCA Analysis")
- NRC Generic Letter 81-16, NUREG-0737 Item I.C.1 SER on Abnormal Transient Operating Guidelines (ATOG) + (NUREG-0737 Item I.C.1 SER on Abnormal Transient Operating Guidelines (ATOG))
- NRC Generic Letter 82-16, NUREG-0737 Technical Specifications + (NUREG-0737 Technical Specifications)
- NRC Generic Letter 83-37, NUREG-0737 Technical Specifications + (NUREG-0737 Technical Specifications)
- NRC Generic Letter 83-36, NUREG-0737 Technical Specifications + (NUREG-0737 Technical Specifications)
- NRC Generic Letter 83-02, NUREG-0737 Technical Specifications + (NUREG-0737 Technical Specifications)
- NRC Generic Letter 81-32, NUREG-0737, Item II.K.3.44-Evaluation of Anticipated Transients Combined with Single Failure + (NUREG-0737, Item II.K.3.44-Evaluation of Anticipated Transients Combined with Single Failure)
- NRC Generic Letter 82-26, NUREG-0744, REV. 1 - Pressure Vessel Material Fracture Toughness + (NUREG-0744, REV. 1 - Pressure Vessel Material Fracture Toughness)
- NRC Generic Letter 83-38, NUREG-0965, "NRC Inventory of Dams" + (NUREG-0965, "NRC Inventory of Dams")
- EPID:L-2019-JLD-0013 + (NUREG/CR-7245 State-of-the-Art Reactor Consequence Analyses (Soarca) Project Sequoyah Integrated Deterministic and Uncertainty Analyses)
- Naber Anita Ghosh + (Naber Anita Ghosh)
- EPID:L-2021-LLA-0000 + (Nac'S Request for a Revision to Certificate of Compliance No. 9356 for the NAC Magnatran Transportation Package)
- Nader Mamish + (Nader Mamish)
- Nadim Khan + (Nadim Khan)
- Nadine Aridi + (Nadine Aridi)
- Nadiyah Morgan + (Nadiyah Morgan)
- Nadja Isakovic + (Nadja Isakovic)
- Naeem Iqbal + (Naeem Iqbal)
- Nageswara Karipineni + (Nageswara Karipineni)
- Name:General Signal Corporation + (General Signal Corporation)
- Nan Chien + (Nan Chien)
- Nancy Belmore + (Nancy Belmore)
- Nancy Fragoyannis + (Nancy Fragoyannis)
- Nancy Hebron-Isreal + (Nancy Hebron-Isreal)
- Nancy Koester + (Nancy Koester)
- Nancy Kranstuber + (Nancy Kranstuber)
- Nancy Salgado + (Nancy Salgado)
- Nancyturner Boyd + (Nancyturner Boyd)
- Nandini Sharma + (Nandini Sharma)