Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Category:Letter type:NOC + (NOC)
- 10 CFR 4 + (NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE FROM THE COMMISSION)
- 10 CFR 5 + (NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE)
- NOV Followup Inspection (Arkansas Nuclear 2019) + (NOV Followup)
- NOV Followup Inspection (Browns Ferry 2019) + (NOV Followup)
- NOV Followup Inspection (Grand Gulf 2019) + (NOV Followup)
- NOV Followup Inspection (River Bend 2019) + (NOV Followup)
- NOV Followup Inspection (Sequoyah 2019) + (NOV Followup)
- NOV Followup Inspection (Waterford 2019) + (NOV Followup)
- NOV Followup Inspection (Watts Bar 2019) + (NOV Followup)
- EPID:L-2018-SPR-0003 + (NRC Approval of Amendment 1 to Update Gle SNM-2019 Standard Practice Procedures Plan (Sppp) Rev. 17)
- EPID:L-2019-DFA-0011 + (NRC Approval of Decommission Cost Estimate Amount for GNF-A Triennial Update)
- EPID:L-2018-DDP-0000 + (NRC Approval of Decommissioning Plan for the American Centrifuge Lead Cascade Facility (Enterprise Project Identifier L-2018-DDP-0000))
- EPID:L-2021-LLL-0019 + (NRC Extension of the Gle Iato from May 1 - Nov 1, 2022)
- NRC Headquarters + (NRC Headquarters)
- 10 CFR 10.25, Nrc Hearing Counsel + (NRC Hearing Counsel)
- MD 8.3, NRC Incident Investigation Program + (NRC Incident Investigation Program)
- Management Directive Volume 9, NRC Organization and Functions + (NRC Organization and Functions)
- NRC Generic Letter 88-01, NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping + (NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping)
- NRC Generic Letter 88-11, NRC Position on Radiation Embrittlement of Reactor Vessel Materials and Its Impact on Plant Operations + (NRC Position on Radiation Embrittlement of Reactor Vessel Materials and Its Impact on Plant Operations)
- NRC Generic Letter 83-33, NRC Positions on Certain Requirements of Appendix R to 10 CFR 50 + (NRC Positions on Certain Requirements of Appendix R to 10 CFR 50)
- EPID:L-2023-LRM-0083 + (NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides)
- EPID:L-2024-DFR-0000 + (NRC Presentation on Reviews of Final Status Survey Reports Given at the March 27, 2024, Public Meeting with OPPD on Fort Calhoun Station Unit 1 Submittal of Phase I Final Status Surveys – (License No. DPR-40, Docket No. 50-285))
- 10 CFR 9.60, Acknowledgement of Requests + (NRC Procedures for Processing Requests)
- NRC Generic Letter 93-02, NRC Public Workshop on Commercial Grade Procurement and Dedication + (NRC Public Workshop on Commercial Grade Procurement and Dedication)
- NRC Region 1 + (NRC Region 1)
- NRC Region 4 + (NRC Region 4)
- 10 CFR 1.47, Nrc Regional Offices + (NRC Regional Offices)
- 10 CFR 1.51, Description and Custody of Nrc Seal + (NRC Seal and Flag)
- EPID:L-2020-LRM-0042 + (NRC Slides Final WBN-1 TS 3.3.3 LAR)
- NRC Generic Letter 83-32, NRC Staff Recommendations Regarding Operator Action for Reactor Trip and ATWS + (NRC Staff Recommendations Regarding Operator Action for Reactor Trip and ATWS)
- NRC Generic Letter 89-23, NRC Staff Responses to Questions Pertaining to Implementation of 10 CFR Part 26 + (NRC Staff Responses to Questions Pertaining to Implementation of 10 CFR Part 26)
- NRC Generic Letter 79-23, NRC Staff Review of Responses to I&E Bulletin 79-08 + (NRC Staff Review of Responses to I&E Bulletin 79-08)
- NRC Generic Letter 79-19, NRC Staff Review of Responses to I&E Bulletins 79-06 and 79-06a + (NRC Staff Review of Responses to I&E Bulletins 79-06 and 79-06a)
- NRC Generic Letter 83-18, NRC Staff Review of the BWR Owners' Group (BWROG) Control Room Survey Program + (NRC Staff Review of the BWR Owners' Group (BWROG) Control Room Survey Program)
- EPID:L-2019-LRM-0044 + (NRC Staff Slides for 11/21/19 Public Meeting with Holtec International - Nrc'S Topical Report Review Process)
- EPID:L-2021-LRM-0027 + (NRC Staff Slides: Feb 23, 2021 Pre-submission Meeting for San Onofre Nuclear Generating Station (SONGS))
- NRC Generic Letter 95-01, NRC Staff Technical Position on Fire Protection for Fuel Cycle Facilities + (NRC Staff Technical Position on Fire Protection for Fuel Cycle Facilities)
- NRC Generic Letter 84-01, NRC Use Of The Terms "Important To Safety" and "Safety Related" + (NRC Use Of The Terms "Important To Safety" and "Safety Related")
- NRC Generic Letter 81-39, NRC Volume Reduction Policy + (NRC Volume Reduction Policy)
- NRC Generic Letter 92-05, NRC Workshop on the Systematic Assessment of Licensee Performance (SALP) Program + (NRC Workshop on the Systematic Assessment of Licensee Performance (SALP) Program)
- 10 CFR 51.104, Nrc Proceeding Using Public Hearings; Consideration of Environmental Impact Statement + (NRC proceeding using public hearings; consideration of environmental impact statement)
- 10 CFR 2.810, Nrc Size Standards + (NRC size standards)
- 10 CFR 9.68, Nrc Statement of Explanation + (NRC statement of explanation)
- 10 CFR 81.10, Authority + (NRC-Owned Inventions--Patents and Applications)
- EPID:L-2019-LLA-0200 + (NRR E-mail Capture - (External_Sender) Action - Request for Comments on the Proposed Issuance of Amendments to Technical Specifications for Fermi 2 Nuclear Power Plant)
- EPID:L-2025-LLA-0028 + (NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise TS SRs 3.8.1.2 and 3.8.1.5 for Diesel Generator Loading License Amendment Request (LAR) (L-2025-LLA-0028))
- EPID:L-2023-LLA-0092 + (NRR E-mail Capture - (External_Sender) Fermi 2 - Request for Additional Information for License Amendment Request Regarding Risk-Informed ECCS Strainer Performance Evaluation (DRAFT)(L-2023-LLA-0092))
- EPID:L-2019-LRM-0019 + (NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods)
- EPID:L-2021-LLA-0016 + (NRR E-mail Capture - (External_Sender) IEMA Response: State Consultation - LaSalle 1 and 2: License Amendment Request Re; Revision of Technical Specifications to Incorporate GNF CRDA Methodology)
- EPID:L-2019-LLR-0094 + (NRR E-mail Capture - (External_Sender) Regarding 09/16/2019 IPEC Weekly Sturgeon Monitoring Report)