Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Enertech + (Enertech)
- 10 CFR 21.61 + (Enforcement)
- 10 CFR 20.2401 + (Enforcement)
- 10 CFR 30.61 + (Enforcement)
- 10 CFR 73.80, Violations + (Enforcement)
- 10 CFR 4.231, Responsibility of Applicants and Recipients + (Enforcement)
- 10 CFR 9.90, Violations + (Enforcement)
- 10 CFR 35.4001, Violations + (Enforcement)
- 10 CFR 36.91, Violations + (Enforcement)
- 10 CFR 39.101, Violations + (Enforcement)
- 10 CFR 40.81, Violations + (Enforcement)
- 10 CFR 50.110, Violations + (Enforcement)
- 10 CFR 52.301, Violations + (Enforcement)
- 10 CFR 55.71, Violations + (Enforcement)
- 10 CFR 70.91, Violations + (Enforcement)
- 10 CFR 74.81, Inspections + (Enforcement)
- 10 CFR 75.51, Violations + (Enforcement)
- 10 CFR 76.131, Violations + (Enforcement)
- 10 CFR 150.30, Violations + (Enforcement)
- 10 CFR 170.41, Failure by Applicant Or Licensee to Pay Prescribed Fees + (Enforcement)
- 10 CFR 171.23, Enforcement + (Enforcement)
- Enforcement Discretion Followup Inspection (Brunswick 2019) + (Enforcement Discretion Followup)
- Enforcement Discretion Followup Inspection (Peach Bottom 2019) + (Enforcement Discretion Followup)
- EGM 15-02, Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance + (Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance)
- EGM 12-01, Enforcement Guidance Memorandum 12-001 Dispositioning Noncompliance with Administrative Controls Technical Specifications programmatic Requirements that Extend Test Frequencies and Allow Performance of Missed Tests + (Enforcement Guidance Memorandum 12-001 Dispositioning Noncompliance with Administrative Controls Technical Specifications programmatic Requirements that Extend Test Frequencies and Allow Performance of Missed Tests)
- 10 CFR 4.501, Purpose + (Enforcement of Nondiscrimination on the Basis of Disability in Programs or Activities Conducted by the U.S. Nuclear Regulatory Commission)
- 10 CFR 4.233, Enforcement Procedures + (Enforcement procedures)
- 10 CFR 5.605, Enforcement Procedures + (Enforcement procedures)
- Engineering Branch 3 + (Engineering Branch 3)
- NRC Generic Letter 81-22, Engineering Evaluation of the H.B. Robinson Reactor Coolant System Leak on 1/29/81 + (Engineering Evaluation of the H.B. Robinson Reactor Coolant System Leak on 1/29/81)
- Engineering Region 1 Branch 1 + (Engineering Region 1 Branch 1)
- Engineering Region 1 Branch 2 + (Engineering Region 1 Branch 2)
- Engineering Region 1 Branch 3 + (Engineering Region 1 Branch 3)
- Enrique Villar + (Enrique Villar)
- Entergy Headquarters + (Entergy Headquarters)
- 10 CFR 36.67, Entering and Leaving the Radiation Room + (Entering and leaving the radiation room)
- 10 CFR 2.1020, Entry Upon Land for Inspection + (Entry upon land for inspection)
- EPID:L-2023-LLA-0042 + (Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2023-LLA-0042) (Package))
- EPID:L-2018-LLE-0019 + (Environmental Assessment and Finding of No Significant Impact Related to Exemption Request for a Physical Barrier Requirement)
- EPID:L-2017-FPR-0015 + (Environmental Assessment and Finding of No Significant Impact and NRC Financial Analysis for Exelon Generation Company Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) for Clinton Power Station Unit 1 ISFSI)
- EPID:L-2020-LLA-0159 + (Environmental Assessment and Finding of No Significant Impact; Issuance)
- EPID:L-2020-LLE-0207 + (Environmental Assessment and Finding of No Significant Impact for Exelon Corporation, LLC Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Braidwood ISFSI)
- EPID:L-2017-FPR-0040 + (Environmental Assessment and Finding of No Significant Impact for Maine Yankee Atomic Power Company'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(B) and 10 CFR 72.30(C) for Maine Yankee ISFSI)
- EPID:L-2022-LLA-0013 + (Environmental Assessment and Fonsi for Emergency Plan)
- EPID:L-2020-LLO-0006 + (Environmental Assessment for NRC Review of Waste Control Specialists Llc., Request Dated 08/30/2018)
- Environmental Coalition on Nuclear Power + (Environmental Coalition on Nuclear Power)
- 10 CFR 51.70, Draft Environmental Impact Statement-General + (Environmental Impact Statements)
- NRC Generic Letter 79-70, Environmental Monitoring for Direct Radiation + (Environmental Monitoring for Direct Radiation)
- Environmental Protection Agency + (Environmental Protection Agency)
- EPID:L-2021-SLE-0003 + (Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake)
- NRC Generic Letter 81-15, Environmental Qualification of Class 1E Electrical Equipment-Clarification of Staffs Handling of Proprietary Information + (Environmental Qualification of Class 1E Electrical Equipment-Clarification of Staffs Handling of Proprietary Information)
- NRC Bulletin 79-01 + (Environmental Qualification of Class IE Equipment)