Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 10 CFR 5.505, Employment Criteria + (Employment criteria)
- 10 CFR 4.13, Employment Practices + (Employment practices)
- EPID:L-2017-FPR-0013 + (Encl: Environmental Assessment Memo to File: Environmental Assessment & Finding of No Significant Impact for Exelon Generation Co. Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Calvert Cliffs ISFSI)
- NRC Generic Letter 78-08, Enclosing NUREG-0408 RE Mark I Containments, and Granting Exemption from GDC 50 and Enclosing Sample Notice + (Enclosing NUREG-0408 RE Mark I Containments, and Granting Exemption from GDC 50 and Enclosing Sample Notice)
- NRC Generic Letter 79-22, Enclosing NUREG-0560, "Staff Report on the Generic Assessment of Feedwater Transients in PWRs Designed by B&W + (Enclosing NUREG-0560, "Staff Report on the Generic Assessment of Feedwater Transients in PWRs Designed by B&W)
- NRC Generic Letter 79-21, Enclosing NUREG/CR 0660, "Enhancement of on Site Emergency Diesel Generator Reliability" + (Enclosing NUREG/CR 0660, "Enhancement of on Site Emergency Diesel Generator Reliability")
- NRC Generic Letter 77-06, Enclosing Questionaire Relating to Steam Generators + (Enclosing Questionaire Relating to Steam Generators)
- NRC Generic Letter 78-19, Enclosing Sandia Report SAND 77-0777, "Barrier Technology Handbook" + (Enclosing Sandia Report SAND 77-0777, "Barrier Technology Handbook")
- NRC Generic Letter 78-20, Enclosing – "A Systematic Approach to the Conceptual Design of Physical Protection Systems for Nuclear Facilities" + (Enclosing – "A Systematic Approach to the Conceptual Design of Physical Protection Systems for Nuclear Facilities")
- EPID:L-2022-NFA-0004 + (Enclosure 1 - Assessment Event Inquiry Into the Nuclear Regulatory Commission Oversight of the Auxiliary Feedwater System at Diablo Canyon Nuclear)
- EPID:L-2020-LLL-0009 + (Enclosure 1 - Columbia Fuel Fabrication Facility Evaluation in Support of 10 CFR 20.2003 Request for Alternate Waste Disposal)
- EPID:L-2020-SPR-0009 + (Enclosure 1 - LA-3605-0001, License Application for the American Centrifuge Plant)
- EPID:L-2023-LRM-0109 + (Enclosure 1: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 12)
- EPID:L-2017-LLA-0408 + (Enclosure 2 - NET-28091-003-01NP, Rev. 0, Criticality Safety Analysis for the Indian Point Unit 2 Spent Fuel Pool with No Absorber Panel Credit)
- EPID:L-2018-LRM-0016 + (Enclosure 2 - Technical Support Center Loss of Coolant Accident Radiological Analysis)
- EPID:L-2023-LLR-0000 + (Enclosure 2: Relief Request ANO2-RR-23-001)
- EPID:L-2016-LLA-0007 + (Enclosure 3 - Licensees Presentation-Seabrook Station, License Amendment Request 16-03 ASR Structural Evaluation Methodology)
- EPID:L-2023-DOT-0005 + (Enclosure 3-1, Summary of Changes to the Safety Analysis Report for the Japanese Certificate of Competent Authority Model No. JMS-87Y-18.5T, Revision 1 (J/2044/B(U)F))
- EPID:L-2018-RNW-0002 + (Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version))
- EPID:L-2023-LLA-0139 + (Enclosure 4: Nedo 32740, Revision 5, General Electric Nuclear Test Reactor Safety Report (Public))
- EPID:L-2020-LLA-0081 + (Enclosure 7 - LTR-SCS-19-50, Revision 0, D.C. Cook Unit 1 Low Temperature Overpressure Protection System (Ltops) Analysis for 48 EFPY, Dated March 5, 2020, Attachment 2 Only (Non-Proprietary))
- EPID:L-2021-LLE-0022 + (Enclosure a - Evaluation Attachment 2 - Proposed Updated Final Safety Analysis Report Tables and Figures, Part 2 of 2)
- EPID:L-2022-LRO-0142 + (End of Cycle 21 Steam Generator Tube Inspection Report)
- EPID:L-2017-LRO-0022 + (End of Cycle 24 In-service and Steam Generator In-service Inspection Summary Reports)
- EPID:L-2018-LRO-0003 + (End of Cycle 25 In-service and Steam Generator In-service Inspection Summary Reports)
- EPID:L-2022-LRO-0141 + (End of Cycle 27 (M2R27) Steam Generator Tube Inspection Report)
- EPID:L-2019-LLR-0099 + (End of Interval Relief Associated with the Third Ten-Year Inservice Inspection (ISI) Interval)
- EPID:L-2018-LLR-0103 + (End of Interval Relief Request Associated with the Fourth Ten-Year Lnservice Inspection (ISI) Interval)
- Energy Facility Site Evaluation Council + (Energy Facility Site Evaluation Council)
- 10 CFR 39.53, Energy Compensation Source + (Energy compensation source)
- EPID:L-2021-LLA-0090 + (Energysolutions - Request for Renewal of the CoC No. 9320 for the Model Midus Package/Change in Address)
- EPID:L-2022-LLA-0039 + (Energysolutions, LLC, Upcoming Request to Amend Certificate of Compliance No. 9320, Revision 5 for the Model Midus Type B Shipping Package)
- Enertech + (Enertech)
- 10 CFR 21.61 + (Enforcement)
- 10 CFR 20.2401 + (Enforcement)
- 10 CFR 30.61 + (Enforcement)
- 10 CFR 73.80, Violations + (Enforcement)
- 10 CFR 4.231, Responsibility of Applicants and Recipients + (Enforcement)
- 10 CFR 9.90, Violations + (Enforcement)
- 10 CFR 35.4001, Violations + (Enforcement)
- 10 CFR 36.91, Violations + (Enforcement)
- 10 CFR 39.101, Violations + (Enforcement)
- 10 CFR 40.81, Violations + (Enforcement)
- 10 CFR 50.110, Violations + (Enforcement)
- 10 CFR 52.301, Violations + (Enforcement)
- 10 CFR 55.71, Violations + (Enforcement)
- 10 CFR 70.91, Violations + (Enforcement)
- 10 CFR 74.81, Inspections + (Enforcement)
- 10 CFR 75.51, Violations + (Enforcement)
- 10 CFR 76.131, Violations + (Enforcement)
- 10 CFR 150.30, Violations + (Enforcement)