Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Bruce Heida + (Bruce Heida)
- Bruce Jones + (Bruce Jones)
- Bruce Lin + (Bruce Lin)
- Bruce Musico + (Bruce Musico)
- Bruce Watson + (Bruce Watson)
- Bruno Caballero + (Bruno Caballero)
- Brunswick + (Brunswick)
- Bryan Bergeon + (Bryan Bergeon)
- Bryan Edwards + (Bryan Edwards)
- Bryan Ford + (Bryan Ford)
- Bryan Hanson + (Bryan Hanson)
- Bryan Leonard + (Bryan Leonard)
- Bryan Parker + (Bryan Parker)
- Bryant Musse + (Bryant Musse)
- Bryce Lehman + (Bryce Lehman)
- Buffalo Forge + (Buffalo Forge)
- Bugey + (Bugey)
- 10 CFR 2.325, Burden of Proof + (Burden of proof)
- 10 CFR 2.1117, Burden of Proof + (Burden of proof)
- 10 CFR 4.315, Burden of Proof + (Burden of proof)
- Bureau of Environmental Radiation Protection + (Bureau of Environmental Radiation Protection)
- Buren Michael Van + (Buren Michael Van)
- EPID:L-2018-LRM-0084 + (Bwrvip/Asme Relief Request Discussion December 19, 2018)
- Byron + (Byron)
- Byron - Jackson / Borg - Warner + (Byron - Jackson / Borg - Warner)
- C Graves + (C Graves)
- C700 + (C700)
- 10 CFR 76 + (CERTIFICATION OF GASEOUS DIFFUSION PLANTS)
- 05000470 + (CESSAR-DC)
- EPID:L-2019-LLR-0066 + (CFR 50.55a Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 in Accordance with 10 CFR 50.55a(z)(2))
- EPID:L-2024-LLR-0032 + (CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair)
- EPID:L-2020-LLR-0119 + (CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval)
- EPID:L-2022-LLR-0043 + (CFR 50.55a Request I4R-09 for the Fourth Inservice Inspection Program Interval, Relief from Examination of Reactor Vessel Flange Threads)
- EPID:L-2020-LLR-0053 + (CFR 50.55a Request Number 2-TYP-4-RV-07 for Bottom Mounted Instrumentation Penetration Examinations)
- EPID:L-2023-LLR-0026 + (CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components)
- EPID:L-2023-LLR-0066 + (CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency)
- EPID:L-2020-LLR-0052 + (CFR 50.55a Request Number: VRR4, Revision 0, Containment Isolation Valve Test Frequency)
- EPID:L-2020-LLR-0049 + (CFR 50.55a Request Number: VRR5, Revision 0, Relief Valve Test Frequency)
- EPID:L-2023-LLR-0008 + (CFR 50.55a Request RP-5 Regarding Inservice Pump Testing)
- EPID:L-2023-LLR-0002 + (CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program)
- EPID:L-2018-LLR-0099 + (CFR 50.55a Request for Alternative HNP-ISI-ALT-05-04 Implementation of BWRVIP Documents in Lieu of Certain 8-N-1 and 8-N-2 Examinations)
- EPID:L-2018-LLR-0023 + (CFR 50.55a Requests No. 1-RR-5-9 Associated with the Firth Ten-Year Interval for the In-service Inspection Program)
- EPID:L-2023-LLR-0007 + (CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv))
- EPID:L-2021-LLR-0072 + (CFR 50.55a Requests RP-1, RP-2, RP-3, and RP-4 Regarding Inservice Pump and Valve Testing)
- EPID:L-2021-LLA-0033 + (CH-TRAMPAC R6 - February 2021)
- TSTF-507 + (CLIIP Traveler to Increase Standardization)
- TAC:MD9433 + (TSTF-6)
- Category:Letter type:CNL + (CNL)
- EPID:L-2025-LLE-0007 + (CNL-25-013 SQN U2 Request for Exemption from Part 26 Work Hours)
- Category:Letter type:CNRO + (CNRO)