Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Name" with value "10 CFR 50.69 Implementation". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • EPID:L-2021-LLR-0060  + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval PR-04 (L-MT-21-013))
  • EPID:L-2023-LLR-0036  + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Inspection (ISI) Interval, RR-002 (L-MT-23-024))
  • EPID:L-2021-LLR-0063  + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-05 (L-MT-21-041))
  • EPID:L-2021-LLR-0020  + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051))
  • EPID:L-2021-LLR-0021  + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051))
  • EPID:L-2020-LLR-0151  + (10 CFR 50.55a Request No. RR-018, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
  • EPID:L-2020-LLR-0050  + (10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections)
  • EPID:L-2023-LLR-0010  + (10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened)
  • EPID:L-2021-LLR-0005  + (10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension)
  • EPID:L-2022-LLR-0005  + (10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements)
  • EPID:L-2021-LLR-0010  + (10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension)
  • EPID:L-2021-LLR-0009  + (10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension)
  • EPID:L-2021-LLR-0007  + (10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension)
  • EPID:L-2024-LLR-0014  + (10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval)
  • EPID:L-2017-LLR-0130  + (10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2))
  • EPID:L-2020-LLR-0002  + (10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval)
  • EPID:L-2020-LLR-0022  + (10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval)
  • EPID:L-2019-LLR-0055  + (10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2)
  • EPID:L-2021-LLR-0096  + (10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing)
  • EPID:L-2018-LLR-0092  + (10 CFR 50.55a Requests in Support of the Fourth 10-Year In-Service Testing Interval)
  • EPID:L-2024-LLR-0005  + (10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval)
  • EPID:L-2023-LLR-0033  + (10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record)
  • EPID:L-2023-LLR-0064  + (10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09)
  • EPID:L-2020-LLR-0006  + (10 CFR 50.55a(z)(1) Request Vr 05: Request for Approval of an Alternative for Pressure Isolation Valve Testing)
  • EPID:L-2023-LLR-0051  + (10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval)