Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2020-LLA-0006 + (1 to Updated Safety Analysis Report, Chapter 8, Electric Power)
- EPID:L-2020-LLA-0198 + (1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan)
- EPID:L-2021-RNW-0010 + (1. Spec Application for Renewal of CoC 9036)
- EPID:L-2017-LLA-0103 + (1/18/2018 Summary of Public Meeting with Southern Nuclear Operating Company Issues Associated with the Safety Review of Licensing Actions for Vogtle Electric Generating Plant Units 3 and 4)
- NRC Generic Letter 84-22, 10 CFR 20.408 Termination Reports - Format + (10 CFR 20.408 Termination Reports - Format)
- NRC Generic Letter 85-08, 10 CFR 20.408 Termination Reports - Format + (10 CFR 20.408 Termination Reports - Format)
- EPID:L-2020-LLE-0127 + (10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report)
- NRC Generic Letter 95-08, 10 CFR 50.54(p) Process for Changes to Security Plans Without Prior NRC Approval + (10 CFR 50.54(p) Process for Changes to Security Plans Without Prior NRC Approval)
- EPID:L-2023-LLR-0035 + (10 CFR 50.55a Relief Request RC3-02)
- EPID:L-2021-LLR-0046 + (10 CFR 50.55a Relief Request RI5-02, Revision 3, and RRS-01, Revision 1)
- EPID:L-2021-LLR-0044 + (10 CFR 50.55a Relief Request RS-01, Revision 0)
- EPID:L-2023-LLR-0021 + (10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations)
- EPID:L-2021-LLR-0081 + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-02 (LMT-21-049))
- EPID:L-2021-LLR-0060 + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval PR-04 (L-MT-21-013))
- EPID:L-2023-LLR-0036 + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Inspection (ISI) Interval, RR-002 (L-MT-23-024))
- EPID:L-2021-LLR-0063 + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-05 (L-MT-21-041))
- EPID:L-2021-LLR-0020 + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051))
- EPID:L-2021-LLR-0021 + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051))
- EPID:L-2020-LLR-0151 + (10 CFR 50.55a Request No. RR-018, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
- EPID:L-2020-LLR-0050 + (10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections)
- EPID:L-2023-LLR-0010 + (10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened)
- EPID:L-2021-LLR-0005 + (10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension)
- EPID:L-2022-LLR-0005 + (10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements)
- EPID:L-2021-LLR-0010 + (10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension)
- EPID:L-2021-LLR-0009 + (10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension)
- EPID:L-2021-LLR-0007 + (10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension)
- EPID:L-2024-LLR-0014 + (10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval)
- EPID:L-2017-LLR-0130 + (10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2))
- EPID:L-2020-LLR-0002 + (10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval)
- EPID:L-2020-LLR-0022 + (10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval)
- EPID:L-2019-LLR-0055 + (10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2)
- EPID:L-2021-LLR-0096 + (10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing)
- EPID:L-2018-LLR-0092 + (10 CFR 50.55a Requests in Support of the Fourth 10-Year In-Service Testing Interval)
- EPID:L-2024-LLR-0005 + (10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval)
- EPID:L-2023-LLR-0033 + (10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record)
- EPID:L-2023-LLR-0064 + (10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09)
- EPID:L-2020-LLR-0006 + (10 CFR 50.55a(z)(1) Request Vr 05: Request for Approval of an Alternative for Pressure Isolation Valve Testing)
- EPID:L-2023-LLR-0051 + (10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval)
- 10 CFR 50.69 Implementation Inspection (Limerick 2020) + (10 CFR 50.69 Implementation)
- IP 37060, 10 CFR 50.69 Risk-Informed Category and Treatment of Structures, Systems, and Components + (10 CFR 50.69 Risk-Informed Category and Treatment of Structures, Systems, and Components)
- EPID:L-2021-LLA-0128 + (10 CFR 50.90 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System)
- 10 CFR 100.11, 100.11 Determination of Exclusion Area, Low Population Zone, and Population Center Distance + (100.11 Determination of exclusion area, low population zone, and population center distance)
- EPID:L-2021-LLR-0061 + (10CFR50.55a Request Associated with the Sixth Inservice Testing Ten-Year Interval (L-MT-21-039))
- EPID:L-2022-DPS-0002 + (11-17-2022 PA Shpo Clarification of September Letter Re Id of Historic Properties_2021PR03278.006)
- EPID:L-2022-LLA-0180 + (11-30-2022 Letter from BWXT NOG-L: Request to Amend License SNM-42 in Accordance with the Revised Fundamental Nuclear Material Control Plan (FNMCP))
- EPID:L-2019-LLA-0008 + (12/17/2019 E-mail from S. Sinha to R. Guzman - Proposed License Conditions for License Amendment Request 10 CFR 50.69)
- EPID:L-2022-LRO-0064 + (180-Day Steam Generator Tube Inspection Report)
- EPID:L-2021-LRM-0017 + (2 to Updated Final Safety Analysis Report, Chapter 3, Design Criteria - Structures, Components, Equipment and Systems)
- EPID:L-2022-LLA-0055 + (2 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems)
- EPID:L-2021-DFA-0006 + (2 to Updated Safety Analysis Report, Section 4, Figures 4.2-1 to 4.6-9)
- EPID:L-2020-TOP-0011 + (2-20-20_Public_Meeting_NEI_Wireless_Presentation)