Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- (Res) Tom Boyce + ((Res) Tom Boyce)
- (Schwartzman) Jennifer Holzman + ((Schwartzman) Jennifer Holzman)
- EPID:L-2021-LLE-0056 + ((Songs), Independent Spent Fuel Storage Installation (ISFSI) - Request for Exemption from 10 CFR 72.106(b))
- EPID:L-2023-LLE-0016 + ((TMI-2), Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E)
- EPID:L-2023-LLE-0091 + ((TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation)
- EPID:L-2022-DPR-0002 + ((TMl-2) - License Amendment Request - Three Mile Island, Unit 2, Decommissioning Technical Specifications, Response to Questions)
- EPID:L-2023-SPR-0004 + ((U)Submission for Approval of the Standard Practice and Procedures Plan (Sppp) and Transportation Plan for Global Laser Enrichment Headquarters)
- EPID:L-2020-LLR-0141 + ((VCSNS) Unit 1 - Alternative Requests RR-4-25 for Elimination of Reactor Pressure Vessel Threads in Flange Examination for the Remainder of the Fourth 10-Year ISI Interval)
- EPID:L-2020-LRO-0084 + ((VCSNS) Unit 1 - Special Report (Spr) 2020002 - Steam Generator Tube Inspection Report)
- EPID:L-2020-LLR-0077 + ((Vcsns), Unit 1 - Alternative Requests RR-4-19 and RR-4-21, Use of a Performance Based Testing Frequency for Check Valves as Alternatives to the Requirements of the American Society of Mechanical Engineers)
- EPID:L-2017-LLA-0348 + ((Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change)
- EPID:L-2018-LLA-0267 + ((Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2)
- EPID:L-2023-LLA-0157 + ((Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension)
- EPID:L-2021-LLA-0094 + ((Vcsns), Unit 1 - Proposed Amendment to Relocate Unit Staff Qualification from Technical Specifications to Quality Assurance Program Description (QAPD))
- EPID:L-2022-LLR-0033 + ((Vcsns), Unit 1, Potential Condition Prohibited by Technical Specification 3.8.1.1)
- EPID:L-2024-LLE-0003 + ((Vnc) Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation)
- EPID:L-2019-LLA-0230 + ((Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements)
- EPID:L-2019-LLA-0203 + ((Waterford 3) - Revision to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual)
- 10 CFR 50.76, . Licensee'S Change of Status; Financial Qualifications + (. Licensee's change of status; financial qualifications)
- EPID:L-2023-LLL-0013 + (0 to Updated Final Safety Analysis Report)
- EPID:L-2018-LRM-0021 + (04/10/2018 Public Teleconference Meeting Slides MPS3 C Charging Pump)
- EPID:L-2022-SPR-0003 + (09-14-2021 Ltr: Exemption Request for NFS NRC-Observed Force-on-Force Exercise)
- EPID:L-2021-EPR-0003 + (09-17-2021 Ltr: Exemption Request for NFS Biennial Emergency Preparedness Exercise)
- EPID:L-2017-PMP-0010 + (1 OF 3, LER 16-004-01 for Columbia Generating Station Regarding Automatic Scram Due to Off-site Load Reject)
- EPID:L-2018-LLL-0008 + (1 OF 4, LER 17-002-00 for Beaver Valley Power Station, Unit No. 1 Regarding Inadequate Emergency Diesel Generator (EOG) Tornado Missile Protection Identified Due to Non-conforming Design Conditions)
- EPID:L-2020-LRO-0062 + (1 RE22 Inspection Summary Report for Steam Generator Tubing)
- EPID:L-2020-LLA-0006 + (1 to Updated Safety Analysis Report, Chapter 8, Electric Power)
- EPID:L-2020-LLA-0198 + (1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan)
- EPID:L-2021-RNW-0010 + (1. Spec Application for Renewal of CoC 9036)
- EPID:L-2017-LLA-0103 + (1/18/2018 Summary of Public Meeting with Southern Nuclear Operating Company Issues Associated with the Safety Review of Licensing Actions for Vogtle Electric Generating Plant Units 3 and 4)
- NRC Generic Letter 84-22, 10 CFR 20.408 Termination Reports - Format + (10 CFR 20.408 Termination Reports - Format)
- NRC Generic Letter 85-08, 10 CFR 20.408 Termination Reports - Format + (10 CFR 20.408 Termination Reports - Format)
- EPID:L-2020-LLE-0127 + (10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report)
- NRC Generic Letter 95-08, 10 CFR 50.54(p) Process for Changes to Security Plans Without Prior NRC Approval + (10 CFR 50.54(p) Process for Changes to Security Plans Without Prior NRC Approval)
- EPID:L-2023-LLR-0035 + (10 CFR 50.55a Relief Request RC3-02)
- EPID:L-2021-LLR-0046 + (10 CFR 50.55a Relief Request RI5-02, Revision 3, and RRS-01, Revision 1)
- EPID:L-2021-LLR-0044 + (10 CFR 50.55a Relief Request RS-01, Revision 0)
- EPID:L-2023-LLR-0021 + (10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations)
- EPID:L-2021-LLR-0081 + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-02 (LMT-21-049))
- EPID:L-2021-LLR-0060 + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval PR-04 (L-MT-21-013))
- EPID:L-2023-LLR-0036 + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Inspection (ISI) Interval, RR-002 (L-MT-23-024))
- EPID:L-2021-LLR-0063 + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval VR-05 (L-MT-21-041))
- EPID:L-2021-LLR-0020 + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051))
- EPID:L-2021-LLR-0021 + (10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-22 (L-MT-21-051))
- EPID:L-2020-LLR-0151 + (10 CFR 50.55a Request No. RR-018, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
- EPID:L-2020-LLR-0050 + (10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections)
- EPID:L-2023-LLR-0010 + (10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened)
- EPID:L-2021-LLR-0005 + (10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension)
- EPID:L-2022-LLR-0005 + (10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements)
- EPID:L-2021-LLR-0010 + (10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension)
- EPID:L-2021-LLR-0009 + (10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension)