- NRC-14-0035, Drawing LRA-M-2006, Rev. Be, Condensate Storage and Transfer System Diagram + (21:26:44, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2010, Rev. Cx, Diagram General Service Water + (21:26:48, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2010-1, Rev. 0, Diagram General Service Water + (21:26:51, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2008, Rev. Bb, Diagram Turbine Building Closed Cooling Water System + (21:26:55, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2005-1, Rev. Ai, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air Vents System + (21:27:08, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2004-1, Rev.Af, Diagram Condensate System + (21:27:12, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2003, Rev. an, Diagram Main Turbine Extraction Steam System + (21:27:15, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2002, Rev. Bp, Main and Reheat Steam System + (21:27:19, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2004, Rev. Ax, Diagram Condensate System + (21:27:23, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2745-04, Rev. a, Control Diagram TB, Second Floor Decon Room and I&C Hot Shop Exhaust Fan + (21:27:26, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2346-08, Rev. F, Instrument Flow Diagram Icfd 167/1 Turbine Flange Heating System + (21:27:30, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2346-05, Rev. W, Instrument Flow Diagram Turbine Generator Seal Oil Systems + (21:27:34, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2336-26, Rev. AB, Instrument Flow Diagram Icfd 165/1 Turine Lubrication Oil System + (21:27:37, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2679-01, Rev. Bh, Primary Containment Monitoring System + (21:27:41, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2649-1, Rev. P, Standby Gas Treatment System Diagram Instrumentation & Controls + (21:27:45, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2400-26, Rev. H, Post Accident Sampling System P&Id. Sheet 2 + (21:27:49, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2400-25, Rev. H, Post Accident Sampling System P&Id. Sheet 1 + (21:27:53, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2400-10, Rev. H, Sample Line Tie-in and Return Diagram Post Accident Sampling System + (21:27:56, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2336-06, Rev. Ae, Instrument Flow Diagram Icfd 168 Turbine Low Press Exhaust Spray Cooling System + (21:28:05, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2156-02, Rev K, Instrument Diagram Reactor Protection System + (21:28:09, 9 July 2018)
- NRC-14-0035, Drawing LRA-E-001-0, Rev. 0, SBO Offsite Power Recover Paths + (21:28:13, 9 July 2018)
- NRC-14-0035, Drawging LRA-I-2336-05, Rev.U, Instrument Flow Diagram Icfd 166 Turbine Gland Steam Sealing System + (21:28:17, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2181-06, Rev. N, Diagram Process Radiation Monitoring Subsystems + (21:28:21, 9 July 2018)
- NRC-14-0035, Drawing LRA-I-2181-04, Rev. J, System Diagram - Process Radiation Monitoring System (Gulf Supplied Equipment) + (21:28:25, 9 July 2018)
- NRC-14-0035, Fermi 2 LRA Drawing List + (21:28:33, 9 July 2018)
- NL-14-0659, Enclosure 4: Hatch Offsite Dose Calculation Manual - Version 23 + (21:29:35, 9 July 2018)
- NL-14-0659, Enclosure 3: Vogtle Annual Radioactive Effluent Release Report for 2013 + (21:29:49, 9 July 2018)
- NL-14-0659, Enclosure 2: Farley Annual Radioactive Effluent Release Report for 2013 + (21:29:56, 9 July 2018)
- NL-14-0659, Enclosure 1: Hatch Annual Radioactive Effluent Release Report for 2013 + (21:30:03, 9 July 2018)
- NL-14-0659, Edwin I. Hatch, Units 1 & 2, Joseph M. Farley, Units 1 & 2, Vogtle, Units 1 & 2, Southern Nuclear Operating Company'S Submittal of Annual Radioactive Effluent Release Reports and Offsite Dose Calculation Manuals for 2013 + (21:30:07, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Technical Requirements Manual + (22:13:08, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 20 + (22:13:14, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Appendix a + (22:13:28, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 17.0, Quality Assurance + (22:13:33, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 16.0, Technical Specifications + (22:13:36, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 15.0, Accident Analyses + (22:13:48, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 14.0, Initial Test Program + (22:13:53, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 13.0, Conduct of Operations + (22:14:06, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 11.0, Radioactive Waste Management + (22:14:13, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 10.0, Steam and Power Conversion + (22:14:24, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 9.0, Figure 9.1-1 Through Figure 9.4-1 + (22:14:28, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 9.0, Auxiliary Systems + (22:14:39, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 8.0, Electric Power + (22:14:47, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 6.0, Engineered Safety Features + (22:15:24, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 5.0, Reactor Coolant System and Connected Systems + (22:15:32, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 4.0, Reactor + (22:17:55, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 2.0, Figures 2.1-1 Through Figure 2.5-19., Sheet 39 + (22:18:24, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 2.0, Site Characteristics + (22:19:17, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 1.0, Introduction and General Description of Plant + (22:19:22, 9 July 2018)
- RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Table of Contents and List of Effective Pages + (22:19:32, 9 July 2018)
- DCL-14-028, Areva Calculation No. 32-9219792-000, Diablo Canyon Unit 2 Pressurizer Spray Nozzle Weld Overlay Residual Stress Analysis. + (22:51:58, 9 July 2018)