Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-14-0035, Drawing LRA-M-4100, Rev. Am, Diagram Torus Water Management System + (21:19:09, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2985-1, Rev. P, Diagram Drips and Drains from Steam Lines and Main Turbine + (21:20:20, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2847, Rev Z, System Diagram Control Center Air Conditioning Air Side Reactor Building + (21:20:23, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2833, Rev Ah, Reactor Recirculation System Nuclear Boiler System + (21:20:26, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2751, Rev. R, Diagram - Air Flow for Control Center Air Conditioning System + (21:20:30, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2740, Rev. AV, Diagram Potable Water System + (21:23:04, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2709, Rev. U, Diagram Standy Bas Treatment and Primary Containment Purge System Reactor Building + (21:23:07, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2707, Revision N, Flow Diagram Reactor & Auxiliary Building Ventilation System + (21:23:10, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2707-1, Rev. C, Flow Diagram Reactor & Auxiliary Building Ventilation System + (21:23:13, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2678, Rev. Am, Diagram Demineralized Service Water Risers for Turbine, Radwaste and Reactor Buildings + (21:23:17, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2535, Rev. H, Diagram Floor Drains All Floors Turbine Building + (21:23:20, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2224, Rev. Y, Diagram Floor Drains All Floors Auxiliary and Reactor Buildings + (21:23:23, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2223, Rev. W, Diagram Equipment Drains All Floors Auxiliary and Reactor Buildings + (21:23:26, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2534, Rev. G, Diagram Equipment Drains All Floors Turbine Building + (21:23:29, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2271, Rev. AD, Heating Flow Diagram for Turbine - Radwaste & Reactor Building + (21:23:32, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2240, Rev. at, Flow and Refrigeration Diagram Turbine House Ventilation + (21:23:36, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2090, Rev. AL, System Diagram Nuclear Boiler System + (21:23:44, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2087, Rev. S, Diagram (Post LOCA) Combustible Gas Control System + (21:23:47, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2085, Rev. U, Diagram Station Air Risers in Reactor & Auxiliary Buildings + (21:23:50, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2084, Rev. Bj, Diagram Residual Heat Removal (RHR) Div 1 + (21:23:53, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2083, Rev. Bp, Diagram Residual Heating Removal (RHR) Div 2 + (21:23:56, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2082, Rev. AA, Diagram Standby Liquid Control System + (21:24:00, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2081, Rev. AV, Diagram Control Rod Drive Hydraulic System Reactor Building (Part 1 of 2) + (21:24:03, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2048, Rev. Ai, Diagram Fuel Pool Cooling & Cleanup System + (21:24:06, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2047, Rev. AC, System Diagram Reactor Water Cleanup Filter Demineralizers + (21:24:09, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2089, Rev. Bg, System Diagram Nuclear Boiler System + (21:24:12, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2088, Rev. U, Diagram Reactor Water Cleanup Phase Separators + (21:24:15, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2046, Rev. Bh, Diagram Reactor Water Cleanup Reactor Building + (21:24:19, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2045, Rev Aq, Diagram Reactor Core Isolation Cooling (RCIC) System Barometric Condenser + (21:24:22, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2044, Rev. BC, Diagram Reactor Core Isolation Cooling System + (21:24:25, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2040, Rev. Aq, Floor Drain Collector System Diagram Radwaste System + (21:24:35, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2038, Rev. a, Diagram OLNC Mitigation Monitoring System + (21:24:40, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2035, Rev. Bk, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building + (21:24:49, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2034, Rev. AO, Diagram Core Spray System C.S.S. Reactor Building + (21:24:52, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2032, Rev. Bq, Sump Pump Diagram Radwaste System + (21:24:55, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2032-1, Rev. Aj, Sump Pump Diagram Radwaste System + (21:25:03, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2043, Rev. Ag, Diagram High Pressure Coolant Injection System Barometric Cndr (HPCI) Reactor Building + (21:25:09, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2042, Rev. an, Diagram Lube Oil Purification, Transfer & Waste System & Cleaning and Decon System + (21:25:12, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2017-2, Rev. an, Diagram Off-Gas Process System Vacuum System - Sheet 2 Activity Reduction Chain + (21:25:29, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2017-1A, Rev. G, Diagram Off-Gas Process System and Vacuum System Sheet 1A Vaccuum System and Reccombiner Chains + (21:25:33, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2017-1, Rev. Bf, Diagram Off-Gas Process System and Vacuum System-Sheet 1 Vacuum System and Recombiner Chains + (21:25:36, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2015, Rev. Cd, Diagram Station and Control Air + (21:25:40, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2012, Rev. 0, Passive Zinc Injection System (P&Id) + (21:25:44, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2011, Rev. Ak, Diagram Condensate Polishing Demineralizer System. Sh 1 of 2 + (21:25:48, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2011-1, Rev. R, Diagram Condensate Polishing Demineralizer System. Sh 2 of 2 + (21:25:52, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2031, Rev. Ak, Sump Pump Diagram Sheet 1 Radwaste System + (21:25:56, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2023, Rev. Be, Diagram Feedwater System + (21:26:06, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2020, Rev. C, Supplemental Cooling Chilled Water System Diagram + (21:26:10, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2005, Rev. Be, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air Vents System + (21:26:32, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2008-1, Rev. AB, Diagram Turbine Building Closed Cooling Water System + (21:26:36, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2007, Rev. Bw, Diagram Circulating Water System + (21:26:40, 9 July 2018)