Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RS-14-014, Attachment 1: Kld TR-633, Rev. 0, LaSalle County Generating Station Development of Evacuation Time Estimates, Cover Through Page 5-21 + (21:08:00, 9 July 2018)
- RS-14-014, LaSalle, Units 1 & 2 and Quad Cities, Units 1 & 2, 10 CFR 50, Appendix E - Evacuation Time Estimate Analysis Information + (21:08:05, 9 July 2018)
- RA-14-042, Oyster Creek Nuclear Generating Station, Unit 1 - Annual Radiological Environmental Operating Report for 2013 + (21:15:02, 9 July 2018)
- RA-14-042, Oyster Creek Nuclear Generating Station - Submittal of Annual Radiological Environmental Operating Report for 2013 + (21:15:06, 9 July 2018)
- NRC-14-0035, LRA-SD-2541-02B, Rev. G, Hydraulic and Pneumatic Systems Railroad Airlock Doors Reactor Building + (21:15:54, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-V-2002-1, Rev. K, Flow Diagram South Auxiliary Steam Boiler P6100B002 + (21:16:02, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-N-2059, Revision Q, Diesel Generator Ventilation RHR Complex Division 2 + (21:16:08, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-N-2058, Rev. R, Diesel Generator Ventilation RHR Complex Division 2 + (21:16:12, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-N-2057, Revision R, Diesel Generator Ventilation RHR Complex Division I + (21:16:15, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-N-2053, Rev. Ah, P&ID RHR Service Water System Division Ii RHR Complex + (21:16:32, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-N-2052, Rev. AD, P&ID RHR Service Water System Division I RHR Complex + (21:16:43, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-N-2056, Revision Q, Diesel Generator Ventilation RHR Complex Division I + (21:16:47, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-N-2054, Revision V, System Diagram Service Water, Makeup, Decant and Overflow Systems Divisions 1 and 2 RHR Complex + (21:16:53, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-N-2047, Rev. Ag, Diesel Generator System Division Ii RHR Complex + (21:17:24, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-N-2050, Rev. N, Equipment Drains & Floor Drains Division I & Ii RHR Complex + (21:17:29, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-N-2049, Rev. at, Diesel Fuel Oil System & Lube Oil System Division Ii RHR Complex + (21:17:33, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-N-2048, Rev. Aj, Diesel Fuel Oil System & Lube Oil System Division I RHR Complex + (21:17:36, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-N-2046, Rev. AC, Diesel Generator System Division I RHR Complex + (21:17:40, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-5730-7, Rev. F, Emergency Breathing Air System Functional Operating Sketch + (21:17:44, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-5715-4, Rev. E, Standby Feedwater Lube Oil System Turbine Building Functional Operating Sketch + (21:17:47, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-5709-2, Rev. F, RCIC Turbine Lube Oil/Control Oil Functional Operating Sketch + (21:17:51, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-5708-2, Rev. L, HPCI Turbine Lube Oil/Control Oil Functional Operating Sketch + (21:17:54, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-5702-2, Rev. L, Functional Operating Sketch Reactor Recirculation MG Sets a & B Lube Oil/Control Oil + (21:17:59, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-5358-1, Rev. 0, Reactor Building Closed Cooling Water + (21:18:02, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-5357, Rev. Bl, Emergency Equipment Cooling Water System Division Ii + (21:18:06, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-5449, Rev. T, Diagram Control Rod Drive Hydraulic System Reactor Building (Part 2 of 2) + (21:18:10, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-5444, Rev. Bp, Emergency Equipment Cooling Water Division L + (21:18:13, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-5358, Rev. Ae, Reactor Building Closed Cooling Water + (21:18:17, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-5083, Rev. T, Piping & Instrument Diagram Standby Feedwater System + (21:18:21, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-5007, Rev. Z, Diagram Primary Containment Pneumatic Supply System + (21:18:24, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-4615, Rev. Af, Diagram Interruptible and Non-Interruptible Control Air + (21:18:28, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-4325, Rev. AA, System Diagram - Water, Side & Misc. Chiller Inst. Control Center A/C System Reactor Bldg + (21:18:33, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-3445, Rev. AO, Diagram Nitrogen Inerting and Supply System + (21:18:50, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-3445-1, Rev. M, Diagram Nitrogen Inerting and Supply System + (21:18:53, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-3045, Rev. R, Diagram Main Steam Isolation Valve Leakage Control System + (21:18:59, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2985, Rev. an, Diagram Drips and Drains from Steam Lines and Main Turbine + (21:19:02, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-4127, Rev. W, Reactor Drywell Cooling System Flow Diagram (P&Id) + (21:19:06, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-4100, Rev. Am, Diagram Torus Water Management System + (21:19:09, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2985-1, Rev. P, Diagram Drips and Drains from Steam Lines and Main Turbine + (21:20:20, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2847, Rev Z, System Diagram Control Center Air Conditioning Air Side Reactor Building + (21:20:23, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2833, Rev Ah, Reactor Recirculation System Nuclear Boiler System + (21:20:26, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2751, Rev. R, Diagram - Air Flow for Control Center Air Conditioning System + (21:20:30, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2740, Rev. AV, Diagram Potable Water System + (21:23:04, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2709, Rev. U, Diagram Standy Bas Treatment and Primary Containment Purge System Reactor Building + (21:23:07, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2707, Revision N, Flow Diagram Reactor & Auxiliary Building Ventilation System + (21:23:10, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2707-1, Rev. C, Flow Diagram Reactor & Auxiliary Building Ventilation System + (21:23:13, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2678, Rev. Am, Diagram Demineralized Service Water Risers for Turbine, Radwaste and Reactor Buildings + (21:23:17, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2535, Rev. H, Diagram Floor Drains All Floors Turbine Building + (21:23:20, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2224, Rev. Y, Diagram Floor Drains All Floors Auxiliary and Reactor Buildings + (21:23:23, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2223, Rev. W, Diagram Equipment Drains All Floors Auxiliary and Reactor Buildings + (21:23:26, 9 July 2018)
- NRC-14-0035, Drawing LRA-M-2534, Rev. G, Diagram Equipment Drains All Floors Turbine Building + (21:23:29, 9 July 2018)