- L-83-362, Application to Amend License NPF-16,allowing Use of Alternate Means of Detecting PORV Position Indication + (20:25:42, 8 January 2025)
- L-83-363, Forwards Corrected Tech Spec Table 3.3-10 Re Accident Monitoring Instrumentation Submitted in 830615 Application to Amend License.Superscript Re Min Channel Operability Should Have Two Astericks Instead of Three + (20:25:44, 8 January 2025)
- L-83-361, Notifies That Vendor Safety Analysis to Support Installation of Mods to Auxiliary Feedwater Sys,Returned to Vendor for Reanalysis + (20:25:45, 8 January 2025)
- ML17214A214 + (20:25:48, 8 January 2025)
- ML17214A208 + (20:25:48, 8 January 2025)
- ML17214A207 + (20:25:49, 8 January 2025)
- ML17214A205 + (20:25:50, 8 January 2025)
- ML17214A204 + (20:25:50, 8 January 2025)
- ML17214A186 + (20:25:51, 8 January 2025)
- L-83-342, Discusses Shift Staffing at Facilities.Util Intends to Initially Operate Unit 2 & Continue Unit 1 Operations W/Five Full Shifts of Licensed Operators on Each Unit.Planned Actions for Filling Vacant Positions Provided + (20:25:52, 8 January 2025)
- ML17214A184 + (20:25:54, 8 January 2025)
- ML17214A183 + (20:25:55, 8 January 2025)
- ML17214A182 + (20:25:56, 8 January 2025)
- ML17214A181 + (20:25:57, 8 January 2025)
- L-83-350, Forwards Revised Shift Staffing Chart Based on 830606 Notification That Seven Licensee Candidates Received Reactor Operator Licenses + (20:26:00, 8 January 2025)
- ML17214A179 + (20:26:03, 8 January 2025)
- ML17214A177 + (20:26:04, 8 January 2025)
- L-83-329, Forwards List of Equipment,Justifications for Interim Operation & Response to Request for Addl Info Re 10CFR50.49 Equipment Qualification Program + (20:26:05, 8 January 2025)
- ML17214A170 + (20:26:07, 8 January 2025)
- ML17214A168 + (20:26:11, 8 January 2025)
- L-83-355, Advises That post-reactor Trip Procedures Will Be Modified to Include Addl Criteria for post-reactor Trip Review. Procedures Will Be Available Onsite for NRC Concurrence within 60 Days Following Approval of Full Power OL + (20:26:12, 8 January 2025)
- L-83-354, Application for Mod to License Condition 2.C.7 for License NPF-16,changing Requirement from Prior to Exceeding 50% of Rated Thermal Power to Prior to Completion of Startup Testing. Mod Requested Due to Testing Delays at San Onofre + (20:26:13, 8 January 2025)
- L-83-351, Advises That Sentence in Util 810914 Response to Human Engineering Discrepancy A.I.3 Re Key Storage Stating, Remote Shutdown Panel SIS Block Keys Will Be Maintained at RAB Control Access Point, Should Be Deleted + (20:26:15, 8 January 2025)
- L-83-346, Application to Amend License DPR-67,revising Tech Specs to Extend Testing Cycle of Valves Utilized as Part of Turbine Overspeed Protection Sys.Change Based on Vendor Recommendation + (20:26:17, 8 January 2025)
- ML17214A163 + (20:26:17, 8 January 2025)
- L-83-345, Discusses Updated Submittal Dates for Reactor Vessel Internals & Thermal Shield Recovery Programs as Followup to Safety Assessment Provided at 830603 Meeting + (20:26:19, 8 January 2025)
- TAC:08083 + (20:26:21, 8 January 2025)
- ML17214A158 + (20:26:22, 8 January 2025)
- ML17214A155 + (20:26:23, 8 January 2025)
- L-83-336, Forwards Justification for Interim Operation Re Qualification of Conax Assembly Used in Inadequate Core Cooling Instrumentation.Test Exposure to Dbe/Loca Conditions Successfully Completed + (20:26:24, 8 January 2025)
- ML17214A153 + (20:26:24, 8 January 2025)
- L-83-333, Fulfills Commitment Made in Re Investigating Feasibility of Performing Demonstration Test for Loss of Ac Power.Util Developed Three Addl Preoperational Tests to Demonstrate Ability to cross-connect Diesel Generators + (20:26:26, 8 January 2025)
- ML17214A145 + (20:26:29, 8 January 2025)
- ML17214A144 + (20:26:31, 8 January 2025)
- ML17214A142 + (20:26:34, 8 January 2025)
- L-83-332, Forwards List of Resolved License Conditions for Initial criticality.Post-fuel Load Initial Test Program Initiated, Including Criticality & Low Power Testing Described in Chapter 14 to FSAR + (20:26:35, 8 January 2025)
- L-83-321, Forwards Revised FSAR Table 7.3-9 Indicating Effects ESF Actuation Sys Devices Have on Plant Operation.Table Will Be Incorporated Into Amend 14 to FSAR Scheduled for 830808 + (20:26:37, 8 January 2025)
- L-83-323, Forwards St Lucie 1 & 2 & Turkey Point 3 & 4 Detailed Control Room Design Reviews Program Plan, Fulfilling 830415 Commitment Per NUREG-0737,Suppl 1 + (20:26:38, 8 January 2025)
- L-83-326, Forwards Responses to Addl Info Requested in 830421 Safety Evaluation on Environ Qualification of safety-related Electrical Equipment + (20:26:40, 8 January 2025)
- ML17214A118 + (20:26:42, 8 January 2025)
- 05000298/LER-1917-003, Re Mispositioned Control Room Emergency Filter System Supply Fan Damper Causes Loss of Safety Function + (20:26:48, 8 January 2025)
- ML17214A115 + (20:26:50, 8 January 2025)
- ML17214A104 + (20:26:50, 8 January 2025)
- ML17214A102 + (20:26:51, 8 January 2025)
- CAC:MF9923 + (20:26:52, 8 January 2025)
- ML17214A101 + (20:26:52, 8 January 2025)
- ML17214A100 + (20:26:53, 8 January 2025)
- ML17214A092 + (20:26:54, 8 January 2025)
- ML17214A099 + (20:26:54, 8 January 2025)
- ML17214A088 + (20:26:55, 8 January 2025)
- ML17214A085 + (20:26:56, 8 January 2025)