Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17214A282 + (20:25:03, 8 January 2025)
- L-83-391, Submits Editorial Changes to Ser,Suppl 2,Section 9.5.1,Item 3 Re Control Room Fire Detection Coverage.Strategically Replacing Key Sections of lay-in Files Will Allow Flow of Combustion Where Detectors Installed + (20:25:04, 8 January 2025)
- TAC:47015 + (20:25:06, 8 January 2025)
- ML17214A278 + (20:25:06, 8 January 2025)
- NRC 2017-0037, High Frequency Seismic Evaluation Confirmation Report + (20:25:08, 8 January 2025)
- L-83-106, Forwards Description of C-E Owners Group Program for Resolving TMI Item II.K.3.5 Automatic Trip of Reactor Coolant Pumps & Generic Ltr 83-10B.Program Scheduled for Completion by End of 1983 + (20:25:09, 8 January 2025)
- L-83-383, Forwards St Lucie Units 1 & 2,Turkey Point Units 3 & 4 Detailed Control Room Design Reviews Program Plan, Per Util 830415 Commitment Re Suppl 1 to NUREG-0737 + (20:25:10, 8 January 2025)
- L-83-376, Submits Addl Info Supporting 830216 Request for Amend to License DPR-67 Revising Surveillance Requirements of 125-volt Dc Batteries in Conjunction W/Sys Mods,In Response to NRC Request.Unit 1 Dc Sys Modified Identically to Unit 2 + (20:25:12, 8 January 2025)
- L-83-382, Discusses Use of C-E Windsor Simulator in Requalification Training to Prevent & Mitigate Voiding During Natural Circulation Cooldown Per 830426 Request.Simulator Does Not Have Capability to Model Upper Head Voiding + (20:25:14, 8 January 2025)
- L-83-375, Forwards Safety Analysis of 830606 Proposed Change to Tech Specs Requesting That Weekly Testing of Valves Involved in Turbine Overspeed Protection Be Extended to Monthly Schedule & Westinghouse Ltr Inadvertently Omitted from + (20:25:17, 8 January 2025)
- ML17214A263 + (20:25:17, 8 January 2025)
- L-83-374, Informs That Intake Structure Crane Fully Complies W/Guideline 7 of NUREG-0612, Crane Design, Based on Franklin Research Ctr & Dresser Industries Studies + (20:25:19, 8 January 2025)
- L-83-370, Responds to NRC Re Date for Submittal of Beta Dose Analysis Used in Equipment Qualification Methodology. Reanalysis Will Be Submitted by 830715 + (20:25:21, 8 January 2025)
- ML17214A259 + (20:25:23, 8 January 2025)
- L-83-367, Comments on Plant Recovery Program Re Reactor Vessel Internals & Thermal Shield (Gamma Heating Effect of Removal of Thermal Shield).Gamma Heating Slight Benefit to Vessel Integrity + (20:25:24, 8 January 2025)
- L-83-369, Forwards Assessment of Safety Impacts of Removal of Thermal Shield from Facility,Per 830419 Commitment.Assessment Addresses Cycle 6 Reload Safety Analysis of Plant Recovery Program + (20:25:26, 8 January 2025)
- ML17214A253 + (20:25:28, 8 January 2025)
- ML17214A252 + (20:25:29, 8 January 2025)
- ML17214A251 + (20:25:30, 8 January 2025)
- ML17214A250 + (20:25:31, 8 January 2025)
- ML17214A248 + (20:25:33, 8 January 2025)
- ML17214A247 + (20:25:34, 8 January 2025)
- ML17214A245 + (20:25:35, 8 January 2025)
- ML17214A243 + (20:25:36, 8 January 2025)
- ML17214A241 + (20:25:37, 8 January 2025)
- L-83-365, Forwards Addl Info Supporting Proposed License Amend Request on PORV Indication,Per 830615 & 16 Ltrs.Chronology of PORV Events,Current Status & Addl Info on Significant Hazards Consideration Encl + (20:25:38, 8 January 2025)
- ML17214A234 + (20:25:40, 8 January 2025)
- ML17214A232 + (20:25:41, 8 January 2025)
- L-83-362, Application to Amend License NPF-16,allowing Use of Alternate Means of Detecting PORV Position Indication + (20:25:42, 8 January 2025)
- L-83-363, Forwards Corrected Tech Spec Table 3.3-10 Re Accident Monitoring Instrumentation Submitted in 830615 Application to Amend License.Superscript Re Min Channel Operability Should Have Two Astericks Instead of Three + (20:25:44, 8 January 2025)
- L-83-361, Notifies That Vendor Safety Analysis to Support Installation of Mods to Auxiliary Feedwater Sys,Returned to Vendor for Reanalysis + (20:25:45, 8 January 2025)
- ML17214A214 + (20:25:48, 8 January 2025)
- ML17214A208 + (20:25:48, 8 January 2025)
- ML17214A207 + (20:25:49, 8 January 2025)
- ML17214A205 + (20:25:50, 8 January 2025)
- ML17214A204 + (20:25:50, 8 January 2025)
- ML17214A186 + (20:25:51, 8 January 2025)
- L-83-342, Discusses Shift Staffing at Facilities.Util Intends to Initially Operate Unit 2 & Continue Unit 1 Operations W/Five Full Shifts of Licensed Operators on Each Unit.Planned Actions for Filling Vacant Positions Provided + (20:25:52, 8 January 2025)
- ML17214A184 + (20:25:54, 8 January 2025)
- ML17214A183 + (20:25:55, 8 January 2025)
- ML17214A182 + (20:25:56, 8 January 2025)
- ML17214A181 + (20:25:57, 8 January 2025)
- L-83-350, Forwards Revised Shift Staffing Chart Based on 830606 Notification That Seven Licensee Candidates Received Reactor Operator Licenses + (20:26:00, 8 January 2025)
- ML17214A179 + (20:26:03, 8 January 2025)
- ML17214A177 + (20:26:04, 8 January 2025)
- L-83-329, Forwards List of Equipment,Justifications for Interim Operation & Response to Request for Addl Info Re 10CFR50.49 Equipment Qualification Program + (20:26:05, 8 January 2025)
- ML17214A170 + (20:26:07, 8 January 2025)
- ML17214A168 + (20:26:11, 8 January 2025)
- L-83-355, Advises That post-reactor Trip Procedures Will Be Modified to Include Addl Criteria for post-reactor Trip Review. Procedures Will Be Available Onsite for NRC Concurrence within 60 Days Following Approval of Full Power OL + (20:26:12, 8 January 2025)
- L-83-354, Application for Mod to License Condition 2.C.7 for License NPF-16,changing Requirement from Prior to Exceeding 50% of Rated Thermal Power to Prior to Completion of Startup Testing. Mod Requested Due to Testing Delays at San Onofre + (20:26:13, 8 January 2025)
- L-83-351, Advises That Sentence in Util 810914 Response to Human Engineering Discrepancy A.I.3 Re Key Storage Stating, Remote Shutdown Panel SIS Block Keys Will Be Maintained at RAB Control Access Point, Should Be Deleted + (20:26:15, 8 January 2025)