Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-83-408, Forwards Analysis Supporting Conclusion That 830128 Proposed Changes to Tech Specs Re Shutdown Margin & Moderator Temp Coefficient Limits Involve NSHC + (20:24:38, 8 January 2025)
- ML17214A313 + (20:24:40, 8 January 2025)
- ML17214A314 + (20:24:40, 8 January 2025)
- ML17214A311 + (20:24:41, 8 January 2025)
- L-83-403, Advises That 830714 Meeting Re Reactor Vessel Internals & Insp Results Per Plant Recovery Program Rescheduled for 830721.Followup Documentation Will Be Submitted by 830728 + (20:24:42, 8 January 2025)
- ML17214A308 + (20:24:44, 8 January 2025)
- ML17214A307 + (20:24:45, 8 January 2025)
- L-83-385, Application for Amend to License NPF-16,revising License Condition 2.C.7 Re Natural Circulation Cooldown & Boron Mixing Test.Safety Evaluation Encl + (20:24:46, 8 January 2025)
- ML17214A304 + (20:24:48, 8 January 2025)
- ML17214A295 + (20:24:50, 8 January 2025)
- ML17214A292 + (20:24:54, 8 January 2025)
- ML17214A291 + (20:24:56, 8 January 2025)
- ML17214A290 + (20:24:57, 8 January 2025)
- ML17214A289 + (20:24:58, 8 January 2025)
- ML17214A288 + (20:24:59, 8 January 2025)
- L-83-396, Forwards Class II & III Amend Fees for 830606 & 17 Applications Re Turbine Overspeed Protection & Steam Generator Pressure/Temp Limits,Respectively + (20:25:00, 8 January 2025)
- ML17214A283 + (20:25:02, 8 January 2025)
- ML17214A282 + (20:25:03, 8 January 2025)
- L-83-391, Submits Editorial Changes to Ser,Suppl 2,Section 9.5.1,Item 3 Re Control Room Fire Detection Coverage.Strategically Replacing Key Sections of lay-in Files Will Allow Flow of Combustion Where Detectors Installed + (20:25:04, 8 January 2025)
- TAC:47015 + (20:25:06, 8 January 2025)
- ML17214A278 + (20:25:06, 8 January 2025)
- NRC 2017-0037, High Frequency Seismic Evaluation Confirmation Report + (20:25:08, 8 January 2025)
- L-83-106, Forwards Description of C-E Owners Group Program for Resolving TMI Item II.K.3.5 Automatic Trip of Reactor Coolant Pumps & Generic Ltr 83-10B.Program Scheduled for Completion by End of 1983 + (20:25:09, 8 January 2025)
- L-83-383, Forwards St Lucie Units 1 & 2,Turkey Point Units 3 & 4 Detailed Control Room Design Reviews Program Plan, Per Util 830415 Commitment Re Suppl 1 to NUREG-0737 + (20:25:10, 8 January 2025)
- L-83-376, Submits Addl Info Supporting 830216 Request for Amend to License DPR-67 Revising Surveillance Requirements of 125-volt Dc Batteries in Conjunction W/Sys Mods,In Response to NRC Request.Unit 1 Dc Sys Modified Identically to Unit 2 + (20:25:12, 8 January 2025)
- L-83-382, Discusses Use of C-E Windsor Simulator in Requalification Training to Prevent & Mitigate Voiding During Natural Circulation Cooldown Per 830426 Request.Simulator Does Not Have Capability to Model Upper Head Voiding + (20:25:14, 8 January 2025)
- L-83-375, Forwards Safety Analysis of 830606 Proposed Change to Tech Specs Requesting That Weekly Testing of Valves Involved in Turbine Overspeed Protection Be Extended to Monthly Schedule & Westinghouse Ltr Inadvertently Omitted from + (20:25:17, 8 January 2025)
- ML17214A263 + (20:25:17, 8 January 2025)
- L-83-374, Informs That Intake Structure Crane Fully Complies W/Guideline 7 of NUREG-0612, Crane Design, Based on Franklin Research Ctr & Dresser Industries Studies + (20:25:19, 8 January 2025)
- L-83-370, Responds to NRC Re Date for Submittal of Beta Dose Analysis Used in Equipment Qualification Methodology. Reanalysis Will Be Submitted by 830715 + (20:25:21, 8 January 2025)
- ML17214A259 + (20:25:23, 8 January 2025)
- L-83-367, Comments on Plant Recovery Program Re Reactor Vessel Internals & Thermal Shield (Gamma Heating Effect of Removal of Thermal Shield).Gamma Heating Slight Benefit to Vessel Integrity + (20:25:24, 8 January 2025)
- L-83-369, Forwards Assessment of Safety Impacts of Removal of Thermal Shield from Facility,Per 830419 Commitment.Assessment Addresses Cycle 6 Reload Safety Analysis of Plant Recovery Program + (20:25:26, 8 January 2025)
- ML17214A253 + (20:25:28, 8 January 2025)
- ML17214A252 + (20:25:29, 8 January 2025)
- ML17214A251 + (20:25:30, 8 January 2025)
- ML17214A250 + (20:25:31, 8 January 2025)
- ML17214A248 + (20:25:33, 8 January 2025)
- ML17214A247 + (20:25:34, 8 January 2025)
- ML17214A245 + (20:25:35, 8 January 2025)
- ML17214A243 + (20:25:36, 8 January 2025)
- ML17214A241 + (20:25:37, 8 January 2025)
- L-83-365, Forwards Addl Info Supporting Proposed License Amend Request on PORV Indication,Per 830615 & 16 Ltrs.Chronology of PORV Events,Current Status & Addl Info on Significant Hazards Consideration Encl + (20:25:38, 8 January 2025)
- ML17214A234 + (20:25:40, 8 January 2025)
- ML17214A232 + (20:25:41, 8 January 2025)
- L-83-362, Application to Amend License NPF-16,allowing Use of Alternate Means of Detecting PORV Position Indication + (20:25:42, 8 January 2025)
- L-83-363, Forwards Corrected Tech Spec Table 3.3-10 Re Accident Monitoring Instrumentation Submitted in 830615 Application to Amend License.Superscript Re Min Channel Operability Should Have Two Astericks Instead of Three + (20:25:44, 8 January 2025)
- L-83-361, Notifies That Vendor Safety Analysis to Support Installation of Mods to Auxiliary Feedwater Sys,Returned to Vendor for Reanalysis + (20:25:45, 8 January 2025)
- ML17214A214 + (20:25:48, 8 January 2025)
- ML17214A208 + (20:25:48, 8 January 2025)
- ML17214A207 + (20:25:49, 8 January 2025)