- 05000237/LER-1978-031, /03L-0 for Dresden, Unit 2 Re PS-2-1430-1466C Failed to Operate + (16:18:34, 8 January 2025)
- 05000237/LER-1978-032, /03L-0 for Dresden, Unit 2 Re During Steady State Operation, Torus to Drywell Vacuum Breaker 2-1601-33E & F Were Found Inoperable During Routine Operability Surveillance + (16:18:36, 8 January 2025)
- 05000237/LER-1980-024, /03L-0 for Dresden, Unit 2 Re Drywell Oxygen Concentration Indication Failed Downscale in Violation of Tech. Spec. 3.7.A.6.d + (16:18:38, 8 January 2025)
- 05000237/LER-1978-035, /01T-0 for Dresden, Unit 2 Re During pre-installation Corrosion Inspection of Recently Purchased Spent Fuel Storage Racks, Cracks Through Weld Metal in Aluminum Channel to Base Plate Fillet Welds Were Found in 8 of 18 Racks + (16:18:39, 8 January 2025)
- 05000237/LER-1977-047, /01T-0 for Dresden, Unit 2 Re During Refuel Outage 3 Cracks Were Found on CRD Return Nozzle Thermal Sleeve + (16:18:41, 8 January 2025)
- 05000237/LER-1977-039, /03L-0 for Dresden, Unit 2 Re a Gasket Failure Was Found on Torus Drain Flange 313A Which Degraded the Primary Containment Boundary + (16:18:43, 8 January 2025)
- 05000237/LER-1977-041, /03L-0 for Dresden, Unit 2 Re APRM 5 Was Found to Ino on 12 Instead of 11 LPRMs Bypassed as Required by T.S. 3.1.1 + (16:18:44, 8 January 2025)
- 05000237/LER-1977-045, /01T-0 for Dresden, Unit 2 Re While Preforming Leak Rate Testing Procedure Dts 1600-1, Measured Leakage for Reactor Feed Check Valves 2-220-58B&62B Were 1149 and 195 Scfh + (16:18:46, 8 January 2025)
- 05000237/LER-1977-046, /03L-0 for Dresden, Unit 2 Re Two Snubbers 26 and 28 Drywell Were Found to Have Less than the Required Amount for Fluid, Thus Questioning Their Operability + (16:18:48, 8 January 2025)
- 05000237/LER-1977-043, /03L-0 for Dresden, Unit 2 Re Drywell Hi Pressure Switch PS2-1501-62A Tripped at 42.9 H20 Increasing Pressure + (16:18:49, 8 January 2025)
- 05000237/LER-1977-044, /03L-0 for Dresden, Unit 2 Re Conditions Leading to Operations in a Degraded Mode Permitted by a Limiting Condition for Operation + (16:18:51, 8 January 2025)
- 05000237/LER-1977-049, /01T-0 for Dresden, Unit 2 Re Discovery During Plant Life of Conditions Not Specifically Considered in the Safety Analysis Report or Technical Specifications That Require Corrective Measures to Prevent the Existence of Unsafe C + (16:18:52, 8 January 2025)
- 05000237/LER-1977-050, /03L-0 for Dresden, Unit 2 Re Local Leak Rate Test of Drywell Personnel Air Lock During Refueling + (16:18:54, 8 January 2025)
- 05000237/LER-1977-057, /01T-0 for Dresden, Unit 2 Re While in Refuel Mode During Refueling, CRD D-2 Select Switch Allowed Two Drives to Be Simultaneously Selected Defeating the Refuel Mode one-rod-permissive, Contrary to T.S. 3.10.D.1 + (16:18:56, 8 January 2025)
- 05000237/LER-1977-058, /01T-0 for Dresden, Unit 2 Re During Refueling Tests Required by LLRT Procedure Dts 1600-1, Torus Air Sample Line Isolation Valves 8501-1A and 1B Had Through Leakage in Excess of Single Valve Ad Penetration Limits + (16:18:57, 8 January 2025)
- 05000237/LER-1977-059, /03L-0 for Dresden, Unit 2 Re During Normal Operation, Surveillance Program Review Revealed Violation of T.S. 1.0.CC.b Maximum Combined Interval Time by 6.5 Days for HPCI Monthly Valve and Pump Operability + (16:19:02, 8 January 2025)
- 05000237/LER-1977-051, /03L-0 for Dresden, Units 2 and 3 Re During Surveillance, Diesel Tripped Resulting in Operation of Unit 3 in Degraded Mode Permitted by T.S. 3.9.B.2 + (16:19:06, 8 January 2025)
- 05000237/LER-1978-042, /03L-0 for Dresden, Unit 2 Re During Weekly Turbine Control Vlv Exercising 3 Control Vlv Failed to Fast Close at the 10% Vlv Position + (16:19:08, 8 January 2025)
- 05000237/LER-1977-056, /03X-2 for Dresden, Unit 2 Re While Unit Was Shut Down for Refueling, Service Water Samples Were Taken at All Containment Cooling Heat Exchangers + (16:19:10, 8 January 2025)
- ML17252B496 + (16:19:11, 8 January 2025)
- 05000237/LER-1978-044 + (16:19:12, 8 January 2025)
- 05000237/LER-1978-043, /03L-0 for Dresden, Unit 2 Re During Unit start-up, While Pulling CRDs to Criticality on Sequence a the RWM Malfunctioned Causing Rod Insert and Withdraw Blocks + (16:19:13, 8 January 2025)
- 05000237/LER-1978-045, /03L-0 for Dresden, Unit 2 Re While Performing Monthly Surv. Dis 1400-3, Auto Blow-down Permissive Sw. Ps 2-1430-1466D Tripped at 120 Psig + (16:19:15, 8 January 2025)
- 05000237/LER-1978-028, /01X-1 for Dresden, Units 2 and 3 Re NRC Request for Immediate Actions to Be Taken to Mitigate the Potential for a Spurious Closure of a Recirculation Loop Suction Valve with a LOCA Occurring Between the Loop Discharge and Suct + (16:19:17, 8 January 2025)
- 05000237/LER-1978-046, /03L-0 for Dresden, Unit 2 Re Drywell Inspection Was Made After Observing Increased Leakage Into Equipment and Floor Drain Sumps + (16:19:18, 8 January 2025)
- 05000237/LER-1978-047, /03L-0 for Dresden, Unit 2 Re During Shutdown While Performing Monthly Sblc Tank Boron Concentration Surv., the Volume/Concentration Parameters of Sblc Tank Were Found Outside Tech. Spec. Limits + (16:19:22, 8 January 2025)
- ML17252B488 + (16:19:23, 8 January 2025)
- 05000237/LER-1976-064, For Dresden, Unit 2 Re Reportable Occurrence Report Submitted with Technical Specifications, Section 6.6.B. Without Enclosures + (16:19:24, 8 January 2025)
- 05000237/LER-1976-062, Re Upon Completion of Routine Diesel Generator Surveillance Testing, Control Switch Was Placed in the Stop Position, Generator Output Subsequently Became Erratic, Generator Voltage Began Oscillating + (16:19:32, 8 January 2025)
- 05000237/LER-1976-061, Re During Testing of HPCI Test Return Line, Which Was Suspected to Be Leaking, Was Found That Contamination Demineralized Water Was in Fact Leaking from the Underground Pipe Into the Storm Sewer + (16:19:34, 8 January 2025)
- 05000237/LER-1976-060, Re Discovery of Water Leakage in Diesel Generator Room Led Identification of Small Hole in HPCI Test Return Line at Condensate Storage Tank + (16:19:35, 8 January 2025)
- 05000237/LER-1976-058, Re During Pump Operability Testing, Core Spray System Test Valve Failed to Close Against Pump Pressure + (16:19:38, 8 January 2025)
- 05000237/LER-1976-059, Re Review of Quad-Cities Unusual Event Letter Led to Discovery That Dresdens Standby Gas Treatment System Deviated from Single Failure Criteria That Disabled the SBGT System + (16:19:39, 8 January 2025)
- 05000237/LER-1976-057, Re Instrument Trip Point for Isolation Was Found at 115.6 Inches H1O Dp During Routine Monthly Surveillance Testing of Reactor Water Level + (16:19:41, 8 January 2025)
- 05000237/LER-1976-055, For Dresden, Units 2 and 3 Re Following Inspection, Post-Maintenance Surveillance Test Was Performed on a Standby Gas Train. Maximum Attainable Flow Was Below the Tech Spec Limit + (16:19:42, 8 January 2025)
- 05000237/LER-1976-051, Regarding Failure of Unit 2/3 Diesel Fire Pump to Start During Routine Surveillance Testing + (16:19:44, 8 January 2025)
- 05000237/LER-1976-052, Regarding Discovery of Drywell High Pressure ECCS Initiation Switch Ps 1632A to Actuate at 2.04 PSI, Which Is Above the Technical Specification Limit + (16:19:46, 8 January 2025)
- 05000237/LER-1976-048, Regarding Discovery of the APRM Channel 5 Indication Had Dropped from 54% to 31% + (16:19:48, 8 January 2025)
- 05000237/LER-1976-049, Regarding Discovery of Core Spray Outboard Injection Valve Mo 2-1402-24B Lost Open/Closed Indication and Could Not Be Electrically Reopened + (16:19:49, 8 January 2025)
- 05000237/LER-1976-050, Regarding Discovery of the Diesel Generator Cooling Water Pump Breaker in the Tripped Condition + (16:19:51, 8 January 2025)
- 05000237/LER-1976-047, Regarding Starting Failure of LPCI Pump 2C for Use in Maintaining Torus Water Temperature Requirements + (16:19:56, 8 January 2025)
- 05000237/LER-1976-045, Regarding Discovery of Sustained High Reactor Pressure Switch 2-263-53C to Actuate 5 PSI Above the Technical Specification Limit + (16:19:57, 8 January 2025)
- 05000237/LER-1976-044, Regarding Discovery of LPCI Permissive Pressure Switch 2-263-52A to Actuate at 367 PSI, Which Is Above the Technical Specification Limit + (16:19:59, 8 January 2025)
- 05000237/LER-1976-018, Regarding Discovery of Feedwater Isolation Check Valves 2-220-58B and -62B to Exceed the 29.381 Scfh Technical Specification Limit + (16:20:01, 8 January 2025)
- 05000237/LER-1976-041, Regarding Discovery of Pressure Switch Ps 2-263-55C to Actuate at 1072 PSI, or 2 PSI Above the Technical Specification Limit + (16:20:02, 8 January 2025)
- 05000237/LER-1976-042, Regarding Discovery of Pressure Switch Ps 2-263-55A to Actuate at 1072 PSI, Which Is Above the Technical Specification Limit + (16:20:04, 8 January 2025)
- 05000237/LER-1975-051, For Dresden Unit 2 Regarding Report of Unit-2 High Torus Water Level Exceeding the Technical Specifications Limit + (16:20:05, 8 January 2025)
- 05000237/LER-1975-052, For Dresden Unit 2 Regarding a Report of Rapid Closure of Unit-2 Main Steam Isolation Valve 203-1C + (16:20:07, 8 January 2025)
- ML17252B457 + (16:20:08, 8 January 2025)
- ML17252B458 + (16:20:08, 8 January 2025)
- 05000237/LER-1975-044, A-00 for Dresden Unit 2 Supplemental Report to Letter Dated October 2, 1975, Entitled Unit-2 Diesel Generator Failure to Start + (16:20:10, 8 January 2025)