Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000335/LER-2076-028, Review of the Testing Proposed for Unit 2 Hydrogen Sampling System Isolation Valves Led to Examination of Purchase Order for the Identical Unit 1 Valves + (04:44:48, 6 January 2025)
- 05000335/LER-2076-024, During Preoperational Testing, Remotely Operated Containment Isolation Valve (Primary Makeup Water) Would Not Close Automatically + (04:44:51, 6 January 2025)
- ML18113A348 + (04:44:53, 6 January 2025)
- 05000335/LER-2076-025, During Preoperational Testing, Regulating Rod 59 Was Immovable Because Associated CEA Module Had Malfunctioned + (04:44:54, 6 January 2025)
- ML18113A341 + (04:44:56, 6 January 2025)
- ML18113A339 + (04:44:57, 6 January 2025)
- 05000335/LER-2076-026, During Power Ascension Testing, One of Four Redundant 120 Volt Ac Instrument Power Busses Was Lost Due to Malfunction of 1C Static Inverter + (04:44:59, 6 January 2025)
- CAC:MF0845 + (04:45:00, 6 January 2025)
- ML18113A335 + (04:45:00, 6 January 2025)
- ML18113A334 + (04:45:04, 6 January 2025)
- ML18113A332 + (04:45:05, 6 January 2025)
- 05000335/LER-2076-027, During Power Ascension Testing, Digital Data Processor Malfunctioned; Resulted in Loss of CEA Pulse Counting Position Indication + (04:45:07, 6 January 2025)
- 05000335/LER-2076-029, Contrary to Tech Spec 4.3.3.3.1, Required Channel Check of 2 Triaxial Accelerographs Was Not Performed within Required Time Frame + (04:45:08, 6 January 2025)
- 05000335/LER-2076-030, During Plant Startup/Heatup from Cold Iron Shutdown Conditions, Plant Experienced Over-Pressure Transient When First RCP Was Started + (04:45:10, 6 January 2025)
- 05000335/LER-2076-032, Relief Valve in Boric Acid Make-Up System Developed a Leak + (04:45:16, 6 January 2025)
- 05000335/LER-2076-035, During Power Ascension Testing, It Was Determined That Power Distribution in Core Was Not as Predicted for 80 Percent Power + (04:45:18, 6 January 2025)
- 05000335/LER-2076-033, While Pumping Water from Primary Water Tank to Spent Fuel Pool, Operations Personnel Found Refueling Water Tank Was Overflowing + (04:45:20, 6 January 2025)
- 05000335/LER-2076-034, In Order to Compensate for Errors Found in NSSS Vendors Strikin II Computer Code, Several Instrumentation and Control Setpoints Were Adjusted + (04:45:22, 6 January 2025)
- 05000335/LER-2076-036, Steam Driven Auxiliary Feedwater Pump Would Not Start Because Steam Supply Valve Would Not Open Fully + (04:45:24, 6 January 2025)
- 05000335/LER-2076-037, With Reactor Critical at 0.01 Percent Power, Control Element Assembly 50 Dropped + (04:45:29, 6 January 2025)
- 05000335/LER-2076-038, With Reactor Critical at 0.01 Percent Power, Power Supply to Digital Data Processor Was Momentarily Deenergized + (04:45:32, 6 January 2025)
- 05000335/LER-2076-039, With Reactor Critical at 0.01 Percent Power, Shield Building Access Door Was Found Open Which Is Contrary to Technical Specification 3.6.6.2 + (04:45:34, 6 January 2025)
- 05000335/LER-2076-040, During Reactor Shutdown and Cooldown, Pressurizer Level Would Drop Whenever Either Set of Shutdown Cooling System Suction Valves Was Opened + (04:45:36, 6 January 2025)
- 05000335/LER-2076-041, During Shutdown Cooling Pump Operation, Second Charging Pump Was Started to Increase Letdown Flow Rate and It Caused Reactor Coolant System Pressure to Increase + (04:45:38, 6 January 2025)
- 05000335/LER-2076-043, During Special Inspection of Steam Generators a and B to Accomplish Tack Welding of Stand Pipes for Feed Ring, 3 Stand Pipes Were Found Missing + (04:45:42, 6 January 2025)
- L-76-361, Forwards Reactor Vessel Overpressurization Issue Progress Report + (04:45:43, 6 January 2025)
- 05000335/LER-2076-042, With Reactor Shutdown for Fuel Inspection, Containment Purge Fan Was Started and Sufficient Vacuum Was Obtained to Cause Containment Vacuum Release Valve to Open + (04:45:44, 6 January 2025)
- 05000335/LER-2076-044, With 1B Diesel Generator Out of Service for Preventive Maintenance on Air Line Lubricators, 1A Diesel Generator Failed to Start During Surveillance Test + (04:45:46, 6 January 2025)
- PMNS20180515, Meeting Announcement - Category 1 Public Meeting + (04:45:50, 6 January 2025)
- 05000335/LER-2076-045, During Plant Heatup, Low Pressure Safety Injection Pumps Were Stopped When System Pressure Had Been Raised Above 250 Psia + (04:45:51, 6 January 2025)
- 05000335/LER-2076-047, Steam Driven Auxiliary Feedwater Pump Would Not Start Because Trip Solenoid Latch Failed to Engage + (04:45:55, 6 January 2025)
- 05000335/LER-2076-048, Due to Faulty Switch on Operators Console an Interrupt Signal Was Sent to Central Processing Unit Causing Digital Data Processor to Halt + (04:45:58, 6 January 2025)
- IR 05000269/2018411 + (04:45:59, 6 January 2025)
- ML18113A286 + (04:46:01, 6 January 2025)
- 05000335/LER-2077-001, During a Weekly Test of Turbine Control Valves, RCS Cold Temperature Exceeded 542 Degrees F Twice + (04:46:02, 6 January 2025)
- 05000335/LER-2077-003, During Surveillance Testing, 1A Diesel Generator Failed to Start + (04:46:05, 6 January 2025)
- 05000335/LER-2077-005, Two Main Feed Pump Discharge Valves Could Reopen After Closing on a Main Steam Isolation Signal + (04:46:07, 6 January 2025)
- ML18113A270 + (04:46:09, 6 January 2025)
- ML18113A268 + (04:46:10, 6 January 2025)
- ML18113A267 + (04:46:10, 6 January 2025)
- ML18113A259 + (04:46:15, 6 January 2025)
- 05000335/LER-2077-006, With the Plant Operating at Power, Control Element Assembly 60 Dropped, Initiating Turbine Run Back and Giving a Rod Bottomed Indication + (04:46:17, 6 January 2025)
- 05000335/LER-2077-007, During Routine Surveillance, CEA 7 Was Found to Be Inoperable. CEA 7 Is a Shutdown CEA + (04:46:19, 6 January 2025)
- NL-18-0550, Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations + (04:46:21, 6 January 2025)
- ML18113A254 + (04:46:21, 6 January 2025)
- 05000335/LER-2077-009, Digital Data Processing System Computer Went Off the Line Because of Memory Disk Content Error, Resulting in Loss of CEA Pulse Counting Position Indication + (04:46:23, 6 January 2025)
- PNP 2018-020, Offsite Dose Calculation Manual and Big Rock Point ISFSI - Attachment 2, 2017 Radioactive Effluent Release Report + (04:46:26, 6 January 2025)
- ML18113A247 + (04:46:28, 6 January 2025)
- ML18113A246 + (04:46:29, 6 January 2025)
- ML18113A245 + (04:46:30, 6 January 2025)
- ML18113A235 + (04:46:34, 6 January 2025)