Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18127A968 + (03:45:53, 6 January 2025)
- ML18127A969 + (03:45:53, 6 January 2025)
- ML18127A962 + (03:45:54, 6 January 2025)
- ML18127A967 + (03:45:54, 6 January 2025)
- ML18127A961 + (03:45:55, 6 January 2025)
- ML18127A960 + (03:45:55, 6 January 2025)
- ML18127A959 + (03:45:56, 6 January 2025)
- ML18127A955 + (03:45:57, 6 January 2025)
- ML18127A958 + (03:45:57, 6 January 2025)
- ML18127A947 + (03:45:58, 6 January 2025)
- ML18127A942 + (03:46:02, 6 January 2025)
- ML18127A922 + (03:46:03, 6 January 2025)
- ML18127A917 + (03:46:03, 6 January 2025)
- ML18127A911 + (03:46:04, 6 January 2025)
- ML18127A910 + (03:46:05, 6 January 2025)
- ML18127A908 + (03:46:05, 6 January 2025)
- ML18127A906 + (03:46:06, 6 January 2025)
- ML18127A905 + (03:46:07, 6 January 2025)
- ML18127A899 + (03:46:07, 6 January 2025)
- IR 05000454/2018001 + (03:46:15, 6 January 2025)
- PMNS20180533, Meeting Between the NRC Staff and the Nuclear Energy Institute + (03:46:15, 6 January 2025)
- ML18127A877 + (03:46:17, 6 January 2025)
- ML18127A838 + (03:46:18, 6 January 2025)
- ML18127A859 + (03:46:18, 6 January 2025)
- ML18127A821 + (03:46:19, 6 January 2025)
- ML18127A805 + (03:46:20, 6 January 2025)
- ML18127A792 + (03:46:21, 6 January 2025)
- ML18127A787 + (03:46:21, 6 January 2025)
- ML18127A784 + (03:46:22, 6 January 2025)
- ML18127A776 + (03:46:23, 6 January 2025)
- ML18127A745 + (03:46:23, 6 January 2025)
- ML18127A736 + (03:46:24, 6 January 2025)
- ML18127A731 + (03:46:25, 6 January 2025)
- ML18127A735 + (03:46:25, 6 January 2025)
- ML18127A730 + (03:46:26, 6 January 2025)
- ML18127A729 + (03:46:29, 6 January 2025)
- ML18127A725 + (03:46:30, 6 January 2025)
- ML18127A722 + (03:46:31, 6 January 2025)
- PMNS20180589, Upcoming Dnrl Public Meeting + (03:46:32, 6 January 2025)
- 05000335/LER-2078-007, For St. Lucie Unit 1, Technical Specification 4.3.1.1.3 RTD Response Time + (03:46:33, 6 January 2025)
- 05000335/LER-2078-008, For St. Lucie Unit 1, Due to an Administrative Error During a Procedure Revision Instructions for Documenting Surveillance of Volume in Diesel Generator Engine Mounted Fuel Tanks Were Omitted + (03:46:36, 6 January 2025)
- 05000335/LER-2078-009, For St. Lucie Unit 1, During PWR Operation Digital Data Processing System Malfunctioned. Apparent Momentary Memory Failure Caused Ddps to Halt + (03:46:38, 6 January 2025)
- ML18127A672 + (03:46:39, 6 January 2025)
- 05000335/LER-2078-010, For St. Lucie Unit 1, One Channel of Steam Generator Low Pressure Measurement for the Main Steam Isolation Signal Failed Requiring Action in Accordance with Technical Specification 3.3.2.1.B + (03:46:41, 6 January 2025)
- 05000335/LER-2078-013, For St. Lucie Unit 1, on 03/28/78 Concerning During Shutdown for Refueling, Dose Equivalent Iodine Exceeded Technical Specification 3.4.8 + (03:46:43, 6 January 2025)
- 05000335/LER-2078-011, For St. Lucie Unit 1, When Upper Guide Structure Was Removed (Refueling Shutdown), 3 (of 45) Incore Instrument Thimbles Remained in the Core + (03:46:45, 6 January 2025)
- 05000335/LER-2078-012, For St. Lucie Unit 1, on 04/16/78 Concerning Eddy Current Testing Performed on Fuel Assembly CEA Guide Tubes at Unit 1 Showed Near in Guide Tubes Where Tips of Fully Withdrawn CEAs Were Located + (03:46:47, 6 January 2025)
- 05000335/LER-2078-014, For St. Lucie Unit 1,On 04/20/78 Concerning During Local Leak Rate Testing, It Was Found That Total Leak Rate Was 807,400 Sccm Which Exceeds Specification of 544,786 (Technical Specification 3.6.1.2.B.) + (03:46:49, 6 January 2025)
- 05000335/LER-2078-015, For St. Lucie Unit 1, on 04/23/78 Concerning Operator Blew Down 1B Bamt Level Instrument to Prevent Sensing Line Blockage, Causing Instrument to Fail High + (03:46:50, 6 January 2025)
- 05000335/LER-2078-016, For St. Lucie Unit 1, on 05/26/78 Concerning Containment Pressure-High Trip Setpoint (Table 2.2-1) Appeared to Be in Error During the Refueling Outage + (03:46:52, 6 January 2025)
- 05000335/LER-2078-017, For St. Lucie Unit 1, on 05/14/78 Concerning Improper Switching at Pratt & Whitney Substation Combined with Incorrect Wiring of Protective Relays at Midway Substation Led to Deenergization of Midway Substation Resulting in Loss + (03:46:54, 6 January 2025)