Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19249B580 + (15:45:03, 4 January 2025)
- ML19249B578 + (15:45:04, 4 January 2025)
- ML19249B579 + (15:45:04, 4 January 2025)
- ML19249B575 + (15:45:05, 4 January 2025)
- ML19249B573 + (15:45:06, 4 January 2025)
- ML19249B570 + (15:45:06, 4 January 2025)
- ML19249B569 + (15:45:07, 4 January 2025)
- 05000271/LER-1979-015-03, /03L-0:on 790802,during Investigation of Seismic Class 1 Hangers,Anchor Bolts of MS-H-A10 Found Dislodged from Wall.Cause Unknown at Present.Present Review of Seismic Class 1 Sys Will Identify Necessary Mods + (15:45:09, 4 January 2025)
- ML19249B566 + (15:45:10, 4 January 2025)
- ML19249B561 + (15:45:11, 4 January 2025)
- ML19249B560 + (15:45:12, 4 January 2025)
- 05000271/LER-1979-015, Forwards LER 79-015/03L-0 + (15:45:13, 4 January 2025)
- ML19249B557 + (15:45:15, 4 January 2025)
- 05000368/LER-1979-062-03, /03L-0:on 790804,failure of Full Length Control Element Assembly 39 to Move.Caused by Failed Control Element Assembly Enable Card.Card Replaced & Assembly Declared Operable within 1-h of Failure + (15:45:16, 4 January 2025)
- ML19249B553 + (15:45:17, 4 January 2025)
- LD-79-036, Forwards Info Requested by IE Bulletin 78-12,Atypical Weld Matl in Reactor Pressure Vessel Welds Which Addresses All Applicable Matls Used in Fabrication of Reactor Vessels. W/O Encl + (15:45:18, 4 January 2025)
- ML19249B547 + (15:45:20, 4 January 2025)
- ML19249B543 + (15:45:20, 4 January 2025)
- ML19249B537 + (15:45:26, 4 January 2025)
- 05000368/LER-1979-061-03, /03L-0:on 790804,failure of Low Pressure Nitrogen Supply in Reactor Bldg Penetration,Outside Isolation Valve, to Close on Control Signal.Caused by Limit Setpoint Drift. Limit Adjusted & Valve Returned to Svc + (15:45:28, 4 January 2025)
- 05000368/LER-1979-060-03, /03L-0:on 790802,failure of Reactor Drain Tank 2T68 Discharge Reactor Bldg Penetration to Close from Control Signal.Caused by Crystallization of Boron in Vent on Valve Operator Piston.Valve Cleaned & Returned to Svc + (15:45:29, 4 January 2025)
- 05000302/LER-1979-073-03, /03L-0:on 790801,during Mode 1 Operation,Absolute Rod Position Indication for Rod 4,Group 7 Fluctuated 3-40% Caused by Sticking Reed Switches.Absolute Position on Indicator Tube Replaced + (15:45:31, 4 January 2025)
- 05000302/LER-1979-073, Forwards LER 79-073/03L-0 + (15:45:36, 4 January 2025)
- ML19249B523 + (15:45:37, 4 January 2025)
- ML19249B521 + (15:45:38, 4 January 2025)
- ML19249B520 + (15:45:57, 4 January 2025)
- ML19249B519 + (15:45:58, 4 January 2025)
- ML19249B517 + (15:45:59, 4 January 2025)
- ML19249B516 + (15:46:00, 4 January 2025)
- ML19249B515 + (15:46:14, 4 January 2025)
- ML19249B514 + (15:46:22, 4 January 2025)
- ML19249B513 + (15:46:24, 4 January 2025)
- ML19249B511 + (15:46:25, 4 January 2025)
- ML19249B512 + (15:46:25, 4 January 2025)
- ML19249B509 + (15:46:26, 4 January 2025)
- ML19249B505 + (15:46:27, 4 January 2025)
- ML19249B501 + (15:46:27, 4 January 2025)
- ML19249B496 + (15:46:28, 4 January 2025)
- ML19249B492 + (15:46:29, 4 January 2025)
- 05000271/LER-1979-018-03, /03L-0:on 790802,during Power Increase After Maint Power Reduction,Max Critical Power Rating Was Below Tech Spec Min.Caused by power-increasing Xenon Transient.Control Rods Inserted & Core Flow Increased for Continued Operat + (15:46:31, 4 January 2025)
- ML19249B489 + (15:46:32, 4 January 2025)
- 05000286/LER-1979-008-03, /03L-0:on 790803,while Operating at 75% Power,Svc Water Pump 36 Was Smoking at Shaft Packing Gland Area.Caused by Wearing of Line Shafts & Bearings Under Normal Loads.Svc Water Pump Was Replaced + (15:46:34, 4 January 2025)
- ML19249B486 + (15:46:35, 4 January 2025)
- ML19249B482 + (15:46:36, 4 January 2025)
- 05000272/LER-1979-051-03, /03L-1:on 790715,during Refueling Outage,Type C Leakage Tests for Eight Valves Showed Initial Leak Rate Greater than Range of Volumetric Test Equipment.Caused by Normal Degradation & Buildup in Valves + (15:46:38, 4 January 2025)
- ML19249B479 + (15:46:40, 4 January 2025)
- 05000271/LER-1979-018, Forwards LER 79-018/03L-0 + (15:46:42, 4 January 2025)
- ML19249B470 + (15:46:43, 4 January 2025)
- ML19249B468 + (15:46:45, 4 January 2025)
- 05000272/LER-1979-051, Forwards LER 79-051/03L-1 + (15:46:46, 4 January 2025)
- ML19249B464 + (15:46:48, 4 January 2025)