- 05000325/LER-1984-001-01, :on 840119,during Attempt to Initiate Suppression Pool Cooling Using Loop a of RHR Svc Water Sys, Loop Pumps a & C Tripped on Low Suction Pressure Lockout. Caused by Air in Header.Air Vented + (06:41:18, 26 May 2025)
- 05000361/LER-1995-012, :on 950707,Unit 2 Containment Air Lock Door Seal Test Did Not Meet Literal TS Requirements Due to Typo in Ts.Revised Containment Air Lock Seal Test Procedure to Ensure Compliance W/Literal Wording of TS for Both Units + (06:41:25, 26 May 2025)
- ML20087C345 + (06:41:27, 26 May 2025)
- ML20087C338 + (06:41:29, 26 May 2025)
- 05000389/LER-1984-004-01, :on 840209,while at 100% Power,Main Feedwater Pump Tripped Due to Low Suction Pressure.Cause Not Determined.Auxiliary Feedwater Pump 2C Tripped Due to Transients on Power Supply.Nut Pin Replaced + (06:41:30, 26 May 2025)
- ML20087C315 + (06:41:35, 26 May 2025)
- 05000368/LER-1984-003, :on 840130,unit Tripped on Low Steam Generator Pressure W/Concurrent Main Steam Isolation Sys Actuation. Caused by Leaking Boric Acid Addition Flow Control Valve 2CV-4926.Valve Repaired + (06:41:38, 26 May 2025)
- ML20087C279 + (06:41:43, 26 May 2025)
- 05000483/LER-1991-008-01, :on 911210,review of Sp OSP-GP-00001,revealed That RHR Pump a Suction Header Vent Valve Had Not Been Verified as Locked Prior to 890314 Due to Incorrect Lock Valve List.Surveillance Procedures Revised + (06:41:46, 26 May 2025)
- 05000281/LER-1975-010-01, /01T:on 750624,svc Water Pump 2-SW-P-4B Developed Seal Leak.Caused by Electrical Short in Motor Operator.Pump Leak & Motor Operator Repaired + (06:41:50, 26 May 2025)
- 05000281/LER-1975-011-01, /01T:on 750630,4 Kv Undervoltage Protection Inoperable.Caused by Blown Fuse.Fuses Replaced + (06:41:55, 26 May 2025)
- 05000281/LER-1975-012-01, /01T:on 750706:main Steam Line Trip Valve in Steam Line B Closed,Causing Closure of Trip Valves a & C & Reactor Trip.Caused by Faulty Piston O-ring.O-ring Replaced & Air Lines Cleared of Debris + (06:41:59, 26 May 2025)
- 05000281/LER-1975-013-01, /01T:on 750720,channel of Change Protection Found Not Conservative.Caused by Failure of Cold Leg Low Level Amplifier.Amplifier Replaced & Channel Calibr + (06:42:06, 26 May 2025)
- 05000280/LER-1975-014-01, /01T:on 750801,boron Concentration in Accumulator 1C Approx 1,850 Ppm.Caused by Inleakage Through Loop Check Valve.Primary Sys Pressure Increased to Seat Check Valves. Accumulator Drained + (06:42:09, 26 May 2025)
- 05000280/LER-1975-015-01, /01T:on 750803,leaking Fitting on Overhead Gas Compressor B Resulted in Unplanned Release of Radioactive Matl from Site.Caused by Loose Fitting.Leaking Fitting Repaired + (06:42:12, 26 May 2025)
- 05000280/LER-1975-017-01, /01T:on 750915,one Channel of Redundant Heat Tracing Failed.Caused by Breaker Trip on Overload Due to Short Circuit by Svc Water Leak.Leak Secured & Transformer Repaired + (06:42:14, 26 May 2025)
- 05000280/LER-1975-018-01, /01T:on 750924,loop a Instrumentation Drifted Low. Caused by High Moisture Content in Containment Atmosphere. RTD Will Be Repaired or Replaced + (06:42:24, 26 May 2025)
- 05000280/LER-1975-019-01, /01T:on 750925,loop B Temperature Change Instrumentation Drifted Low.Caused by Moisture Content of Containment Atmosphere.Spare RTD Placed in Svc & Shutdown Terminated + (06:42:26, 26 May 2025)
- 05000280/LER-1975-022-01, /01T:on 750927,test of Main Steam Safety Valve Setpoint Indicated Four Valves Not within Plus or Minus 1% of Setpoint.Caused by Setpoint Drift.Valves Adjusted & Retested + (06:42:28, 26 May 2025)
- 05000281/LER-1975-017-01, /01T:on 751003,loop C Leg RTD Failed Low,Causing Protection Signals to Fail Low.Caused by Incorrect Ohmic Characteristic of Connected RTD & Spare.Failed Instruments Replaced + (06:42:32, 26 May 2025)
- 05000281/LER-1975-018-01, /01T:on 751009,steam Generator Level Transmitter Isolation Valve Body Bonnet Leak Wetted Down RPI Cabling, Causing Grounds & Erratic Indication for 24 Different Rods. Caused by Water Spray + (06:42:33, 26 May 2025)
- 05000280/LER-1975-023-01, /01T:on 751013,channels P-1-455,P-1-456 & P-1-457 Found Indicating High by 26.4 psi,42.0 Psi & 29.4 Psi, Respectively.Caused by Overranging of Zero Spring in Prior Calibr.Procedure Revised + (06:42:35, 26 May 2025)
- 05000281/LER-1975-019-01, /01T:on 751015,boric Acid Transfer Pump D Motor Failed Resulting in Loss of Recircilation of Boron Injection Tank 2.Caused by Boric Acid Present in Stator Windings. Pump B Placed in Svc + (06:42:37, 26 May 2025)
- ML20087C018 + (06:42:41, 26 May 2025)
- 05000354/LER-1995-015, :on 950708,reactor Shutdown to Comply W/Ts 3.7.2 Exceeded LCO for a CR Ventilation.Caused by Momentary Power Interruption to Control Circuit Due to Problem W/Freon.Replaced Freon Temp Switch + (06:43:00, 26 May 2025)
- 05000280/LER-1975-016-01, /01T:on 750822,Channel II Protection Drifted in Nonconservative Direction.Caused by Incorrect Resistance of Hot Leg Resistance Temp Detector (Rtd).Packing Replaced & RTD Ohmic Characteristic Returned to Normal + (06:43:03, 26 May 2025)
- 05000354/LER-1995-014, :on 950703,automatic Actuation of HPCI Sys Suction Path Swapover ESF Occured Due to Personnel Did Not Fully Understand Potential Effects of Total Loop Instrument Accuracy.Sensitized Personnel + (06:43:06, 26 May 2025)
- 05000280/LER-1975-024-01, /01T:on 750116,containment Leak Rate Test Revealed Overall Integrated Containment Leakage Rate Greater than Acceptable Criterion.Caused by Two Defective Tubes in Steam Generator A.Tubes Plugged + (06:43:07, 26 May 2025)
- 05000281/LER-1975-016-01, /01T:on 750823,low Level Alarm on Boric Acid Tank C Received.Caused by Installation of Carbon Steel Rather than Stainless Steel 304 Flanges & Pipe of Spool Piece.All Improper Installations Will Be Replaced + (06:43:13, 26 May 2025)
- 05000280/LER-1975-025-01, /01T:on 751129,uncontrolled & Unplanned Release of Low Level Radioactive Matl Occurred.Caused by Primary Grade Water Tank 1-PG-TK-1B Overflow Due to Operator Error. Administrative Action Taken + (06:43:16, 26 May 2025)
- 05000280/LER-1975-026-01, /01T:on 751130,auxiliary Feedwater Pump Discharge Valve MOV-FW-151A Failed to Automatically Open When Main Feed Pumps Locked Out.Caused by Failure of Switch.Adjustment of Lever Arm Corrected Problem + (06:43:18, 26 May 2025)
- ML20087B709 + (06:43:21, 26 May 2025)
- 05000280/LER-1975-027-01, /01T:on 751205,uncontrolled & Unplanned Release of Low Level Radioactive Matl Occurred.Caused by Primary Grade Water Tank 1-PG-TK-1A Overflow Due to Operator Error. Administrative Action Taken + (06:43:23, 26 May 2025)
- 05000280/LER-1975-028-01, /01T:on 751211,auxiliary Feedwater Pump Discharge Valve MOV-FW-151A Failed to Automatically Open When Low Low Level Experienced During Draining of Steam Generator B. Caused by Malfunction of Timing Relay + (06:43:27, 26 May 2025)
- ML20087B679 + (06:43:29, 26 May 2025)
- 05000281/LER-1975-020-01, /01T:on 751219,steam Generator C Pressure Indication 496 Channel IV Failed High.Caused by Frozen Sensing Line.Louvers Closed & Sealed Allowing Line to Thaw & Transmitter Returned to Normal Svc + (06:43:32, 26 May 2025)
- 05000281/LER-1975-021-01, /01T:on 751219,channel 3 for Over Temp Indicated 132% While Channels 1 & 2 Indicated 118%.Cause Unknown. Channel Calibr & Returned to Svc + (06:43:34, 26 May 2025)
- 05000280/LER-1975-031-01, /01T:on 751219,steam Generator C Pressure Indication 494 Channel II Failed High.Caused by Frozen Sensing Line.Louvers Closed & Sealed Allowing Line to Thaw & Transmitter Returned to Normal Svc + (06:43:36, 26 May 2025)
- 05000280/LER-1975-030-01, /01T:on 751230,two Component Cooling Water/Svc Water HX Tubes Noted Leaking Indicating Inadvertent Release of Low Level Radioactive Water to James River.Caused by Plugs Loosened During Operation + (06:43:38, 26 May 2025)
- 05000302/LER-1991-018, :on 911208,reduction in Reactor Coolant Sys Pressure Due to Failure of Pressurizer Spray Valve.Caused by Failure of RCV-14.Plant Placed in Mode 5 & RCV-14 Repaired + (06:43:40, 26 May 2025)
- ML20087B607 + (06:43:48, 26 May 2025)
- 05000443/LER-1995-004, :on 950630 & 0701,non-compliance W/Tech Spec Surveillance Requirements for Inoperable Afd Monitor Alarm Occurred.Caused by Personnel Error.Afd Monitored & Logged on Hourly Basis + (06:43:50, 26 May 2025)
- 05000277/LER-1991-038, :on 911205,unexpected Engineered Safety Feature Actuation Occurred During Performance of Surveillance Test. Caused by Spurious Actuation of RCIC Isolation Logic.Test Reperformed W/No Adverse Effects + (06:43:52, 26 May 2025)
- 05000281/LER-1976-010-03, /03L:on 760621,loss of Voltage Alarm Received on Power Range Nuclear Instrument Channel 42.Caused by Failure of 25-volt Power Supply.Power Supply Replaced & Channel Calibr + (06:43:53, 26 May 2025)
- 05000280/LER-1976-011-03, /03L:on 760823,diaphragm in Valve 1-CH-125 Failed Causing Leakage of Boric Acid.Caused by Normal Operation. Valve Repaired + (06:43:56, 26 May 2025)
- 05000281/LER-1976-011-03, /03L:on 760626,nuclear Instrumentation Sys Power Range Channel N42 Deviated from Channels N41,N43 & N44 by 3% in Nonconservative Direction.Caused by Low Output of Channel Level & Summing Amplifier + (06:43:57, 26 May 2025)
- ML20087B573 + (06:44:00, 26 May 2025)
- TXX-4087, Forwards Rept Re Investigation Into Allegations Made by Wa Dunham & Concerns Related to Protective Coatings.Related Documents Encl + (06:44:55, 26 May 2025)
- 05000272/LER-1979-068, Supplemental LER 79-068/03X-1:on 791018,safety Injection Pump Motor 12 Tripped on Overcurrent.Caused by Impeller Locknuts Improperly Secured at Mfg Facility.Pumps Reassembled Using Locktite Compound + (06:45:15, 26 May 2025)
- 05000333/LER-1991-029, :on 911130 & 1213,spurious Actuation of Primary Containment (Pc) Vent & Purge Isolation Sys Occurred.Caused by electrical-magnetic Noise Initiation of Pc High Radiation Monitors.Cr Operators to Remove two-way Radios + (06:45:34, 26 May 2025)
- JPN-92-001, Responds to Diagnostic Evaluation Team Rept,Provided Via NRC .Five Major Initiatives Will Be Undertaken Re Capital Improvements,Mgt Changes,Engineering Organizational Changes & Nuclear Generation Business Plan + (06:46:01, 26 May 2025)