Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22354A256 + (06:26:27, 26 June 2025)
- ML22354A255 + (06:26:29, 26 June 2025)
- ML22354A254 + (06:26:31, 26 June 2025)
- ML22354A252 + (06:26:35, 26 June 2025)
- ML22354A251 + (06:26:37, 26 June 2025)
- ML22354A250 + (06:26:38, 26 June 2025)
- ML22354A249 + (06:26:40, 26 June 2025)
- ML22350A017 + (06:27:42, 26 June 2025)
- ML22350A016 + (06:27:44, 26 June 2025)
- STC-22-069, Notification of Upcoming Public Meeting to Provide an Overview of the Joint U.S. NRC and Agreement State Working Group Efforts on the Future of the NMP + (06:32:50, 26 June 2025)
- ML22251A381 + (07:01:30, 26 June 2025)
- ML22175A080 + (07:36:02, 26 June 2025)
- ML22102A022 + (08:23:54, 26 June 2025)
- CAC:000993 + (08:31:21, 26 June 2025)
- ML22013B300 + (09:14:59, 26 June 2025)
- ML22006A001 + (09:18:28, 26 June 2025)
- ML22005A348 + (09:18:30, 26 June 2025)
- OIG-20-A-16, Update on Staff Response to the Office of the Inspector Generals Audit of the U.S. Nuclear Regulatory Commissions Employee Reentry Plans Dated November 23rd, 2021 + (09:34:09, 26 June 2025)
- ML21256A173 + (10:10:28, 26 June 2025)
- ML21208A003 + (10:28:41, 26 June 2025)
- ENS 57778 + (11:20:04, 26 June 2025)
- ENS 57779 + (11:20:05, 26 June 2025)
- 05000387/LER-2020-001, 0l for Susquehanna Steam Electric Station Unit 1 Re Automatic Reactor Scram Due to Main Turbine Trip Caused by an Electrical Ground Path in the B Main Transformer + (11:48:36, 26 June 2025)
- SECY-19-0072, VR-SECY-19-0072: Denial of Petition for Rulemaking on Measurement and Control of Combustible Gas Generation and Dispersal (PRM-50-103; NRC-2011-0189) + (13:36:01, 26 June 2025)
- TAC:45978 + (14:13:22, 26 June 2025)
- TAC:43320 + (14:21:26, 26 June 2025)
- TAC:47494 + (14:34:51, 26 June 2025)
- 05000259/LER-2020-001, Re Manual Reactor Shutdown of Two Units on Decreasing Condenser Vacuum Due to Eel Grass Intrusion + (16:51:16, 26 June 2025)
- TAC:M95298 + (17:52:51, 26 June 2025)
- 05000423/LER-1997-054, :on 971029,noted That W Fuel May Exceed 10CFR50.46 Max Cladding Oxidation Design Criteria.Caused by Potentially non-conservative Modeling Criteria/Assumptions. Plant Specific Evaluation Has Been Performed by W + (17:56:34, 26 June 2025)
- 05000336/LER-1998-012-01, :on 980521,nonconservative Assumptions in Facility Loss of Normal FW Analysis Was Noted.Caused by Incorrect Calculation of SG Inventory During Lonf Event. Reanalysis of FSAR Loss of Normal FW Analysis Was Completed + (17:57:00, 26 June 2025)
- 05000293/LER-1997-016, :on 971105,recirculation Sys Loop B Pump Trip Was Noted.Caused by Sp Inadequacy.Revised Procedure + (17:58:23, 26 June 2025)
- 05000271/LER-1998-014, :on 980521,inadequate Configuration in Control Methods Resulted in Plant Operation W/Degraded Vital Fire Barrier Subject to Plant TS Sr.Cause Could Not Be Determined.Replaced Seal + (17:58:38, 26 June 2025)
- 05000285/LER-1998-006, :on 980521,outside of Design Basis for LOCA W/Plant Shutdown Was Noted.Caused by Lack of Defined Design Basis for Operability Requirements.Updated USAR & Procedures to Include Operability Requirements + (17:58:57, 26 June 2025)
- 05000382/LER-1997-030, :on 971114,discovered TS 3.6.3 Noncompliance Due to Design Error Associates W/Cars & Civs.Caused by Inadequate Mod.Valve CAR-201B Declared Inoperable + (17:59:05, 26 June 2025)
- 05000277/LER-1997-009, :on 971109,reactor Scram Occurred.Caused by Generator Lockout Condition & Subsequent Turbine Trip Failure of 2A Reactor Feedpump Turbine to Trip on Demand During Recovery Activities.Reset Appropriate Scram Logics + (18:00:59, 26 June 2025)
- 05000325/LER-1998-003, Forwards LER 98-003-00 Re Safety Relief Valves Exceeded TS Setpoint Limits.Rept Fulfills Requirement for Written Rept within 30 Days of Reportable Occurrence.No Regulatory Commitments Contained in Document + (18:01:46, 26 June 2025)